{"title":"橡树岭的25毫伏串联加速器","authors":"C.M. Jones","doi":"10.1016/0029-554X(81)90860-0","DOIUrl":null,"url":null,"abstract":"<div><p>A new heavy-ion accelerator facility is under construction at the Oak Ridge National Laboratory. A brief description of the scope and status of this project is presented with emphasis on the first operational experience with the 25 MV tandem accelerator.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 145-151"},"PeriodicalIF":0.0000,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90860-0","citationCount":"13","resultStr":"{\"title\":\"The 25 MV tandem accelerator at oak ridge\",\"authors\":\"C.M. Jones\",\"doi\":\"10.1016/0029-554X(81)90860-0\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>A new heavy-ion accelerator facility is under construction at the Oak Ridge National Laboratory. A brief description of the scope and status of this project is presented with emphasis on the first operational experience with the 25 MV tandem accelerator.</p></div>\",\"PeriodicalId\":100971,\"journal\":{\"name\":\"Nuclear Instruments and Methods\",\"volume\":\"184 1\",\"pages\":\"Pages 145-151\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1981-05-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0029-554X(81)90860-0\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear Instruments and Methods\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0029554X81908600\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Instruments and Methods","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0029554X81908600","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A new heavy-ion accelerator facility is under construction at the Oak Ridge National Laboratory. A brief description of the scope and status of this project is presented with emphasis on the first operational experience with the 25 MV tandem accelerator.