A. Buenrostro, A. Harbi, Alfredo Arevalo, Jairo Carmona
{"title":"通道压裂技术在有限的BHP窗口下成功部署支撑剂压裂增产,以确保完井完整性","authors":"A. Buenrostro, A. Harbi, Alfredo Arevalo, Jairo Carmona","doi":"10.2118/195086-MS","DOIUrl":null,"url":null,"abstract":"\n Study made from the results observed over a particular application objective with one of the recently developed proppant fracturing techniques known as Channel Fracturing. This technique was used in this application to place a proppant fracturing treatment in a tight gas reservoir which pushes the installed well completion to reach its mechanical limit capabilities. Channel (or pillar) fracturing was applied in multiple cases with the intention to constrain the pressure increase commonly observed during a fracture job execution.","PeriodicalId":11031,"journal":{"name":"Day 4 Thu, March 21, 2019","volume":"30 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Channel Fracturing Technology to Successfully Deploy Proppant Fracturing Stimulation Under Limited BHP Window for Completion Integrity\",\"authors\":\"A. Buenrostro, A. Harbi, Alfredo Arevalo, Jairo Carmona\",\"doi\":\"10.2118/195086-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Study made from the results observed over a particular application objective with one of the recently developed proppant fracturing techniques known as Channel Fracturing. This technique was used in this application to place a proppant fracturing treatment in a tight gas reservoir which pushes the installed well completion to reach its mechanical limit capabilities. Channel (or pillar) fracturing was applied in multiple cases with the intention to constrain the pressure increase commonly observed during a fracture job execution.\",\"PeriodicalId\":11031,\"journal\":{\"name\":\"Day 4 Thu, March 21, 2019\",\"volume\":\"30 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, March 21, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/195086-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, March 21, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/195086-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Channel Fracturing Technology to Successfully Deploy Proppant Fracturing Stimulation Under Limited BHP Window for Completion Integrity
Study made from the results observed over a particular application objective with one of the recently developed proppant fracturing techniques known as Channel Fracturing. This technique was used in this application to place a proppant fracturing treatment in a tight gas reservoir which pushes the installed well completion to reach its mechanical limit capabilities. Channel (or pillar) fracturing was applied in multiple cases with the intention to constrain the pressure increase commonly observed during a fracture job execution.