海上平台直升机装卸作业的安全性:从几个角度和编组员的心理方面进行优化

H. Yonebayashi, T. Collins
{"title":"海上平台直升机装卸作业的安全性:从几个角度和编组员的心理方面进行优化","authors":"H. Yonebayashi, T. Collins","doi":"10.2118/174721-PA","DOIUrl":null,"url":null,"abstract":"Field and Logistics. The field is located offshore, approximately 200 km (108 nm) away from the nearest airport. Flight time is 1 hour and 5 minutes in still air by a twin-engine medium-sized helicopter with two blades that has a cruise speed of 100 knots. In the case of a four-blade twin-engine helicopter with a cruise speed of 125 knots, flight time is 52 minutes in still air. In the case of vessel transportation, it takes 1 day from the nearest port. The field has been developed with facilities consisting of a central complex with living quarters and surrounding unmanned platforms. All wells are tied-in platforms. Produced fluids are sent to the central complex through subsea flowlines. The central complex has both a helideck and large crane equipment, while the platforms have a helideck and simple human-powered hoist equipment only, without any crane equipment. Regular or ad hoc but prescheduled material transportation is performed by an offshore support vessel between the nearest port and the central complex, except urgent/emergency transportation. Once materials arrive at the complex, the method of transportation from the complex to the platform depends on the situation. If there are small materials that can be managed by human carrying or lifting with simple hoist equipment, then those materials are transported by supply boat. Heavier materials that cannot be lifted by human power are transported by helicopter. There are three types of platforms—one-leg, three-leg, and four-leg. The number of well slots and the size of the helideck increase with the number of legs on the platform.","PeriodicalId":19446,"journal":{"name":"Oil and gas facilities","volume":"11 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2016-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Safety for a Helicopter Load/Unload Operation on an Offshore Platform: Optimization From Several Viewpoints and the Psychological Aspects of the Marshaller\",\"authors\":\"H. Yonebayashi, T. Collins\",\"doi\":\"10.2118/174721-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Field and Logistics. The field is located offshore, approximately 200 km (108 nm) away from the nearest airport. Flight time is 1 hour and 5 minutes in still air by a twin-engine medium-sized helicopter with two blades that has a cruise speed of 100 knots. In the case of a four-blade twin-engine helicopter with a cruise speed of 125 knots, flight time is 52 minutes in still air. In the case of vessel transportation, it takes 1 day from the nearest port. The field has been developed with facilities consisting of a central complex with living quarters and surrounding unmanned platforms. All wells are tied-in platforms. Produced fluids are sent to the central complex through subsea flowlines. The central complex has both a helideck and large crane equipment, while the platforms have a helideck and simple human-powered hoist equipment only, without any crane equipment. Regular or ad hoc but prescheduled material transportation is performed by an offshore support vessel between the nearest port and the central complex, except urgent/emergency transportation. Once materials arrive at the complex, the method of transportation from the complex to the platform depends on the situation. If there are small materials that can be managed by human carrying or lifting with simple hoist equipment, then those materials are transported by supply boat. Heavier materials that cannot be lifted by human power are transported by helicopter. There are three types of platforms—one-leg, three-leg, and four-leg. The number of well slots and the size of the helideck increase with the number of legs on the platform.\",\"PeriodicalId\":19446,\"journal\":{\"name\":\"Oil and gas facilities\",\"volume\":\"11 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Oil and gas facilities\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/174721-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Oil and gas facilities","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/174721-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

外勤和后勤。该油田位于海上,距离最近的机场约200公里(108海里)。在静止空气中飞行时间为1小时5分钟,由双引擎中型直升机与两个叶片,巡航速度为100节。以四叶双发直升机为例,巡航速度为125节,在静止空气中飞行时间为52分钟。如果采用船舶运输,距离最近的港口需要1天。该油田的开发设施包括一个带有生活区的中心综合体和周围的无人平台。所有井都在平台上。产出的流体通过海底管线输送到中央综合设施。中央综合楼有直升机平台和大型起重机设备,而各平台只有直升机平台和简单的人力起重机设备,没有起重机设备。除紧急/紧急运输外,定期或临时但预先安排的物资运输由一艘近海支援船在最近的港口和中央综合设施之间进行。一旦材料到达综合设施,从综合设施到平台的运输方式取决于情况。如果有小型物料可以由人力搬运或用简单的提升设备吊起,则这些物料由补给船运输。人力不能举起的较重的物品用直升机运送。站台有三种类型——单腿、三腿和四腿。随着平台上支腿的数量增加,井槽的数量和直升机平台的尺寸也随之增加。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Safety for a Helicopter Load/Unload Operation on an Offshore Platform: Optimization From Several Viewpoints and the Psychological Aspects of the Marshaller
Field and Logistics. The field is located offshore, approximately 200 km (108 nm) away from the nearest airport. Flight time is 1 hour and 5 minutes in still air by a twin-engine medium-sized helicopter with two blades that has a cruise speed of 100 knots. In the case of a four-blade twin-engine helicopter with a cruise speed of 125 knots, flight time is 52 minutes in still air. In the case of vessel transportation, it takes 1 day from the nearest port. The field has been developed with facilities consisting of a central complex with living quarters and surrounding unmanned platforms. All wells are tied-in platforms. Produced fluids are sent to the central complex through subsea flowlines. The central complex has both a helideck and large crane equipment, while the platforms have a helideck and simple human-powered hoist equipment only, without any crane equipment. Regular or ad hoc but prescheduled material transportation is performed by an offshore support vessel between the nearest port and the central complex, except urgent/emergency transportation. Once materials arrive at the complex, the method of transportation from the complex to the platform depends on the situation. If there are small materials that can be managed by human carrying or lifting with simple hoist equipment, then those materials are transported by supply boat. Heavier materials that cannot be lifted by human power are transported by helicopter. There are three types of platforms—one-leg, three-leg, and four-leg. The number of well slots and the size of the helideck increase with the number of legs on the platform.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信