{"title":"大型同步汽轮发电机监测系统设计","authors":"M. Kovacic, Z. Hanic, M. Vrazic","doi":"10.1109/ICELMACH.2012.6350098","DOIUrl":null,"url":null,"abstract":"This paper presents an approach to design of synchronous turbo generator monitoring system. Various physical quantities that are important for operation of the synchronous generator in the power plant such as armature and field voltages and currents, position of the rotor, vibrations of the end windings, flux densities and temperatures over machine are monitored. Paper describes transducers that were used, data acquisition hardware as well as developed data acquisition, visualization and monitoring application with the abilities of recording trends of calculated quantities and waveforms of captured transients. Described measurement system is installed in the thermal power plant on the 247 MVA 3000 rpm synchronous generator and is currently in continuous operation for 9 months.","PeriodicalId":6309,"journal":{"name":"2012 XXth International Conference on Electrical Machines","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2012-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Design of large synchronous turbo-generator monitoring system\",\"authors\":\"M. Kovacic, Z. Hanic, M. Vrazic\",\"doi\":\"10.1109/ICELMACH.2012.6350098\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an approach to design of synchronous turbo generator monitoring system. Various physical quantities that are important for operation of the synchronous generator in the power plant such as armature and field voltages and currents, position of the rotor, vibrations of the end windings, flux densities and temperatures over machine are monitored. Paper describes transducers that were used, data acquisition hardware as well as developed data acquisition, visualization and monitoring application with the abilities of recording trends of calculated quantities and waveforms of captured transients. Described measurement system is installed in the thermal power plant on the 247 MVA 3000 rpm synchronous generator and is currently in continuous operation for 9 months.\",\"PeriodicalId\":6309,\"journal\":{\"name\":\"2012 XXth International Conference on Electrical Machines\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 XXth International Conference on Electrical Machines\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICELMACH.2012.6350098\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 XXth International Conference on Electrical Machines","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICELMACH.2012.6350098","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文介绍了同步汽轮发电机监测系统的设计方法。各种物理量对发电厂同步发电机的运行很重要,如电枢和磁场电压和电流,转子的位置,末端绕组的振动,磁通密度和机器上的温度。本文介绍了所使用的传感器、数据采集硬件以及开发的数据采集、可视化和监测应用程序,这些应用程序具有记录计算量趋势和捕获瞬态波形的能力。所述测量系统安装在火电厂247mva 3000转同步发电机上,目前已连续运行9个月。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Design of large synchronous turbo-generator monitoring system
This paper presents an approach to design of synchronous turbo generator monitoring system. Various physical quantities that are important for operation of the synchronous generator in the power plant such as armature and field voltages and currents, position of the rotor, vibrations of the end windings, flux densities and temperatures over machine are monitored. Paper describes transducers that were used, data acquisition hardware as well as developed data acquisition, visualization and monitoring application with the abilities of recording trends of calculated quantities and waveforms of captured transients. Described measurement system is installed in the thermal power plant on the 247 MVA 3000 rpm synchronous generator and is currently in continuous operation for 9 months.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信