公用事业罢工的成本估算:走向街道工程的主动管理

IF 1.9 Q3 MANAGEMENT
Lewis O. Makana, N. Metje, I. Jefferson, M. Sackey, Chris D F Rogers
{"title":"公用事业罢工的成本估算:走向街道工程的主动管理","authors":"Lewis O. Makana, N. Metje, I. Jefferson, M. Sackey, Chris D F Rogers","doi":"10.1680/JINAM.17.00033","DOIUrl":null,"url":null,"abstract":"The true (full) cost of a utility strike incident is rarely known. Generally, only the direct costs are used to measure the impact of utility strikes; the wider indirect and social costs are rarely...","PeriodicalId":43387,"journal":{"name":"Infrastructure Asset Management","volume":null,"pages":null},"PeriodicalIF":1.9000,"publicationDate":"2020-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":"{\"title\":\"Cost estimation of utility strikes: towards proactive management of street works\",\"authors\":\"Lewis O. Makana, N. Metje, I. Jefferson, M. Sackey, Chris D F Rogers\",\"doi\":\"10.1680/JINAM.17.00033\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The true (full) cost of a utility strike incident is rarely known. Generally, only the direct costs are used to measure the impact of utility strikes; the wider indirect and social costs are rarely...\",\"PeriodicalId\":43387,\"journal\":{\"name\":\"Infrastructure Asset Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2020-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"14\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Infrastructure Asset Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/JINAM.17.00033\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructure Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JINAM.17.00033","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 14

摘要

公用事业罢工事件的真正(全部)成本很少为人所知。一般来说,只有直接成本被用来衡量公用事业罢工的影响;更广泛的间接和社会成本很少……
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Cost estimation of utility strikes: towards proactive management of street works
The true (full) cost of a utility strike incident is rarely known. Generally, only the direct costs are used to measure the impact of utility strikes; the wider indirect and social costs are rarely...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.70
自引率
14.30%
发文量
18
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信