Pierre-Jean Bibet, R. Santos, Antoine Lucas, Daniel Vunza
{"title":"Pazflor海底分离,十年后","authors":"Pierre-Jean Bibet, R. Santos, Antoine Lucas, Daniel Vunza","doi":"10.4043/31187-ms","DOIUrl":null,"url":null,"abstract":"\n On Saturday the 3rd of September 2011, at 22h30 Luanda time, the first Pazflor gas/liquid Subsea Separation Unit (SSU) is put into operation, and one hybrid pump starts in production. Few weeks later, all three SSU are fully operational.\n In 2021, all three SSU will celebrate 10 years of successful operation.\n The paper relates 10 years of operational feedback of the Pazflor Subsea Separation Units with a special focus on the pumping system.","PeriodicalId":10936,"journal":{"name":"Day 2 Tue, August 17, 2021","volume":"24 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Pazflor Subsea Separation, Ten Years After\",\"authors\":\"Pierre-Jean Bibet, R. Santos, Antoine Lucas, Daniel Vunza\",\"doi\":\"10.4043/31187-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n On Saturday the 3rd of September 2011, at 22h30 Luanda time, the first Pazflor gas/liquid Subsea Separation Unit (SSU) is put into operation, and one hybrid pump starts in production. Few weeks later, all three SSU are fully operational.\\n In 2021, all three SSU will celebrate 10 years of successful operation.\\n The paper relates 10 years of operational feedback of the Pazflor Subsea Separation Units with a special focus on the pumping system.\",\"PeriodicalId\":10936,\"journal\":{\"name\":\"Day 2 Tue, August 17, 2021\",\"volume\":\"24 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, August 17, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31187-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, August 17, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31187-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
On Saturday the 3rd of September 2011, at 22h30 Luanda time, the first Pazflor gas/liquid Subsea Separation Unit (SSU) is put into operation, and one hybrid pump starts in production. Few weeks later, all three SSU are fully operational.
In 2021, all three SSU will celebrate 10 years of successful operation.
The paper relates 10 years of operational feedback of the Pazflor Subsea Separation Units with a special focus on the pumping system.