{"title":"港珠澳大桥水下承台施工方法","authors":"M. Fang, Lizhi Yu, Yu Tan","doi":"10.1680/jbren.19.00013","DOIUrl":null,"url":null,"abstract":"The embedded pile-cap design in the Hong Kong–Zhuhai–Macao Bridge project meant that prefabricated pier shafts and pile caps had to be installed under water. This posed a host of daunting construct...","PeriodicalId":44437,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","volume":"36 4","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2021-02-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/jbren.19.00013","citationCount":"1","resultStr":"{\"title\":\"Methods used to construct underwater pile caps on the Hong Kong–Zhuhai–Macao Bridge\",\"authors\":\"M. Fang, Lizhi Yu, Yu Tan\",\"doi\":\"10.1680/jbren.19.00013\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The embedded pile-cap design in the Hong Kong–Zhuhai–Macao Bridge project meant that prefabricated pier shafts and pile caps had to be installed under water. This posed a host of daunting construct...\",\"PeriodicalId\":44437,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"volume\":\"36 4\",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2021-02-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1680/jbren.19.00013\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jbren.19.00013\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jbren.19.00013","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Methods used to construct underwater pile caps on the Hong Kong–Zhuhai–Macao Bridge
The embedded pile-cap design in the Hong Kong–Zhuhai–Macao Bridge project meant that prefabricated pier shafts and pile caps had to be installed under water. This posed a host of daunting construct...