使用基于主体的方法对covid-19大流行背景下多技能建筑工人的影响进行建模

IF 1.4 4区 工程技术
F. Araya
{"title":"使用基于主体的方法对covid-19大流行背景下多技能建筑工人的影响进行建模","authors":"F. Araya","doi":"10.7764/rdlc.21.1.105","DOIUrl":null,"url":null,"abstract":"As the COVID-19 pandemic continues, construction projects have struggled to be completed. As such, it is necessary to find alternatives that optimize the limited human resources that can be working on construction sites. One alternative to do so is using multiskilled workers so workers can be reassigned to construction activities minimizing projects’ disruption due to workers getting contagion with COVID-19. This study simulates the influence of multiskilled workers in the development of a construction project in the context of the COVID-19 pandemic using an agent-based modeling approach. The aim of the study is to quantify the influence of multiskilled workers in the deficit of construction workers due to COVID-19. The proposed model generates six scenarios to include the uncertainty from limited data from the field due to the pandemic context to quantify the deficit of workers to develop a construction project. This study found that using multiskilled workers reduces the deficit of workers required to perform critical activities in construction projects. More specifically, it can reduce the average deficit of workers roughly in half when compared with the alternative of using only single-skilled workers, from 33.4% to 16.7% of deficit. Consequently, multiskilled workers represents an alternative for construction managers to deal with the disruption from COVID-19 in construction projects from a workforce management standpoint. Understanding alternatives to minimize the impacts of COVID-19 in construction projects may assist engineers and managers in applying strategies to develop construction projects accounting the limitations that COVID-19 places on construction sites.","PeriodicalId":54473,"journal":{"name":"Revista de la Construccion","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Modeling the influence of multiskilled construction workers in the context of the covid-19 pandemic using an agent-based ap-proach\",\"authors\":\"F. Araya\",\"doi\":\"10.7764/rdlc.21.1.105\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As the COVID-19 pandemic continues, construction projects have struggled to be completed. As such, it is necessary to find alternatives that optimize the limited human resources that can be working on construction sites. One alternative to do so is using multiskilled workers so workers can be reassigned to construction activities minimizing projects’ disruption due to workers getting contagion with COVID-19. This study simulates the influence of multiskilled workers in the development of a construction project in the context of the COVID-19 pandemic using an agent-based modeling approach. The aim of the study is to quantify the influence of multiskilled workers in the deficit of construction workers due to COVID-19. The proposed model generates six scenarios to include the uncertainty from limited data from the field due to the pandemic context to quantify the deficit of workers to develop a construction project. This study found that using multiskilled workers reduces the deficit of workers required to perform critical activities in construction projects. More specifically, it can reduce the average deficit of workers roughly in half when compared with the alternative of using only single-skilled workers, from 33.4% to 16.7% of deficit. Consequently, multiskilled workers represents an alternative for construction managers to deal with the disruption from COVID-19 in construction projects from a workforce management standpoint. Understanding alternatives to minimize the impacts of COVID-19 in construction projects may assist engineers and managers in applying strategies to develop construction projects accounting the limitations that COVID-19 places on construction sites.\",\"PeriodicalId\":54473,\"journal\":{\"name\":\"Revista de la Construccion\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Revista de la Construccion\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.7764/rdlc.21.1.105\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista de la Construccion","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.7764/rdlc.21.1.105","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

随着COVID-19大流行的持续,建筑项目难以完成。因此,有必要找到替代方案,以优化可以在建筑工地工作的有限人力资源。一种替代方案是使用多技能工人,这样工人就可以被重新分配到建筑活动中,最大限度地减少因工人感染COVID-19而导致的项目中断。本研究采用基于主体的建模方法,模拟了在COVID-19大流行背景下,多技能工人在建设项目开发中的影响。该研究的目的是量化多技能工人对因COVID-19造成的建筑工人短缺的影响。拟议的模型产生了六种情景,其中包括由于大流行背景下来自实地的有限数据的不确定性,以量化开发建设项目的工人短缺。本研究发现,使用多技能工人减少了在建筑项目中执行关键活动所需的工人赤字。更具体地说,与只使用单一技术工人的替代方案相比,它可以将工人的平均赤字减少大约一半,从赤字的33.4%降至16.7%。因此,从劳动力管理的角度来看,多技能工人是施工经理应对2019冠状病毒病对建筑项目造成破坏的另一种选择。了解最小化COVID-19对建筑项目影响的替代方案可以帮助工程师和管理人员应用策略来开发考虑到COVID-19对建筑工地造成的限制的建筑项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Modeling the influence of multiskilled construction workers in the context of the covid-19 pandemic using an agent-based ap-proach
As the COVID-19 pandemic continues, construction projects have struggled to be completed. As such, it is necessary to find alternatives that optimize the limited human resources that can be working on construction sites. One alternative to do so is using multiskilled workers so workers can be reassigned to construction activities minimizing projects’ disruption due to workers getting contagion with COVID-19. This study simulates the influence of multiskilled workers in the development of a construction project in the context of the COVID-19 pandemic using an agent-based modeling approach. The aim of the study is to quantify the influence of multiskilled workers in the deficit of construction workers due to COVID-19. The proposed model generates six scenarios to include the uncertainty from limited data from the field due to the pandemic context to quantify the deficit of workers to develop a construction project. This study found that using multiskilled workers reduces the deficit of workers required to perform critical activities in construction projects. More specifically, it can reduce the average deficit of workers roughly in half when compared with the alternative of using only single-skilled workers, from 33.4% to 16.7% of deficit. Consequently, multiskilled workers represents an alternative for construction managers to deal with the disruption from COVID-19 in construction projects from a workforce management standpoint. Understanding alternatives to minimize the impacts of COVID-19 in construction projects may assist engineers and managers in applying strategies to develop construction projects accounting the limitations that COVID-19 places on construction sites.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Revista de la Construccion
Revista de la Construccion 工程技术-工程:土木
CiteScore
2.30
自引率
21.40%
发文量
0
期刊介绍: The Journal of Construction is aimed at professionals, constructors, academics, researchers, companies, architects, engineers, and anyone who wishes to expand and update their knowledge about construction. We therefore invite all researchers, academics, and professionals to send their contributions for assessment and possible publication in this journal. The publications are free of publication charges. OBJECTIVES The objectives of the Journal of Construction are: 1. To disseminate new knowledge in all areas related to construction (Building, Civil Works, Materials, Business, Education, etc.). 2. To provide professionals in the area with material for discussion to refresh and update their knowledge. 3. To disseminate new applied technologies in construction nationally and internationally. 4. To provide national and foreign academics with an internationally endorsed medium in which to share their knowledge and debate the topics raised.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信