{"title":"图兹拉“Kreka”煤矿生产设施安装FN电厂的效果","authors":"M. Aličić, Izudin Delić, Zakir Šabić, Almis Aličić","doi":"10.5937/tehnika2206693a","DOIUrl":null,"url":null,"abstract":"The use of renewable energy sources is imposed as an imperative for the competitiveness and stable energy policy of companies. The basic production equipment in the \"Kreka\" coal mine in Tuzla has electrical plants with a total peak load of 12 MW, and the costs for electrical energy exceed €3.5 million annually. The paper analyzes the suitability of infrastructure facilities and devastated areas of the Kreka Coal Mine in Tuzla for the construction of photovoltaic power plants and the effects of such plants. The results of the analysis show a significant resource for the installation of photovoltaic power plants with a capacity of 230 MW. The production of electricity from these photovoltaic power plants enables a reduction of emissions into the air by 190 t/year of particle emissions, by 316.2 •103 t/year of CO2 emissions, by 58.15 t/year of SO2 emissions and by 251.9 t/year of emissions NOx. With the subsidized purchase of electricity, it is possible to return the investment within 6 years.","PeriodicalId":22484,"journal":{"name":"Tehnika","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Effects of the installation of FN power plants in the production facilities of the \\\"Kreka\\\" coal mine in Tuzla\",\"authors\":\"M. Aličić, Izudin Delić, Zakir Šabić, Almis Aličić\",\"doi\":\"10.5937/tehnika2206693a\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The use of renewable energy sources is imposed as an imperative for the competitiveness and stable energy policy of companies. The basic production equipment in the \\\"Kreka\\\" coal mine in Tuzla has electrical plants with a total peak load of 12 MW, and the costs for electrical energy exceed €3.5 million annually. The paper analyzes the suitability of infrastructure facilities and devastated areas of the Kreka Coal Mine in Tuzla for the construction of photovoltaic power plants and the effects of such plants. The results of the analysis show a significant resource for the installation of photovoltaic power plants with a capacity of 230 MW. The production of electricity from these photovoltaic power plants enables a reduction of emissions into the air by 190 t/year of particle emissions, by 316.2 •103 t/year of CO2 emissions, by 58.15 t/year of SO2 emissions and by 251.9 t/year of emissions NOx. With the subsidized purchase of electricity, it is possible to return the investment within 6 years.\",\"PeriodicalId\":22484,\"journal\":{\"name\":\"Tehnika\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Tehnika\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5937/tehnika2206693a\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tehnika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5937/tehnika2206693a","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

可再生能源的使用是公司竞争力和稳定能源政策的必要条件。图兹拉“Kreka”煤矿的基本生产设备有发电厂,总峰值负荷为12兆瓦,每年的电能成本超过350万欧元。本文分析了图兹拉Kreka煤矿的基础设施和受灾地区是否适合建设光伏电站,以及光伏电站的影响。分析结果表明,安装容量为230兆瓦的光伏电站具有重要的资源。这些光伏电站的电力生产使空气中的颗粒物排放量减少190吨/年,二氧化碳排放量减少316.2•103吨/年,二氧化硫排放量减少58.15吨/年,氮氧化物排放量减少251.9吨/年。通过补贴购电,可以在6年内收回投资。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Effects of the installation of FN power plants in the production facilities of the "Kreka" coal mine in Tuzla
The use of renewable energy sources is imposed as an imperative for the competitiveness and stable energy policy of companies. The basic production equipment in the "Kreka" coal mine in Tuzla has electrical plants with a total peak load of 12 MW, and the costs for electrical energy exceed €3.5 million annually. The paper analyzes the suitability of infrastructure facilities and devastated areas of the Kreka Coal Mine in Tuzla for the construction of photovoltaic power plants and the effects of such plants. The results of the analysis show a significant resource for the installation of photovoltaic power plants with a capacity of 230 MW. The production of electricity from these photovoltaic power plants enables a reduction of emissions into the air by 190 t/year of particle emissions, by 316.2 •103 t/year of CO2 emissions, by 58.15 t/year of SO2 emissions and by 251.9 t/year of emissions NOx. With the subsidized purchase of electricity, it is possible to return the investment within 6 years.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
26
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信