基于项目的组织中的知识管理:多案例研究

IF 0.4 Q4 INFORMATION SCIENCE & LIBRARY SCIENCE
Leandro César Mol Barbosa, R. Carvalho, Ângela França Versiani, C. Pedron
{"title":"基于项目的组织中的知识管理:多案例研究","authors":"Leandro César Mol Barbosa, R. Carvalho, Ângela França Versiani, C. Pedron","doi":"10.5380/ATOZ.V10I1.77978","DOIUrl":null,"url":null,"abstract":"Introduction:  Project-Based Organizations (PBO) have the market operational flexibility as their main characteristic. Although positive, such flexibility results in barriers linked to the intrinsic project issues such as temporality, uniqueness and its independence degree, making Knowledge Management (KM) difficult. This article analyzes the influence of barriers to KM in the environment of PBO. Method: Using a qualitative approach, a multiple case study was carried out comprising three Industrial Project Engineering Companies (IPEC) that meet PBO criteria. Data were collected through interviews, direct observation and documents. Results: Four of the six barriers described in the literature were confirmed, and they were being temporality, lack of dedication to KM, use of temporary teams and project independence degree. Barriers such as outsourcing, distance work and the KM effort were included. It was also found that the lack of routines is not part of the IPECs environment and that the project uniqueness is not a barrier but an opportunity to generate knowledge. Conclusions: The analysis of the barriers that hinder KM in these environments allowed not only the verification of this influence in their processes, but also the form and extension with which it happens.","PeriodicalId":40617,"journal":{"name":"AtoZ-Novas Praticas em Informacao e Conhecimento","volume":"10 1","pages":"50-59"},"PeriodicalIF":0.4000,"publicationDate":"2021-01-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Gestão do Conhecimento em Organizações Baseadas em Projeto (OBPs): estudo de casos múltiplos\",\"authors\":\"Leandro César Mol Barbosa, R. Carvalho, Ângela França Versiani, C. Pedron\",\"doi\":\"10.5380/ATOZ.V10I1.77978\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Introduction:  Project-Based Organizations (PBO) have the market operational flexibility as their main characteristic. Although positive, such flexibility results in barriers linked to the intrinsic project issues such as temporality, uniqueness and its independence degree, making Knowledge Management (KM) difficult. This article analyzes the influence of barriers to KM in the environment of PBO. Method: Using a qualitative approach, a multiple case study was carried out comprising three Industrial Project Engineering Companies (IPEC) that meet PBO criteria. Data were collected through interviews, direct observation and documents. Results: Four of the six barriers described in the literature were confirmed, and they were being temporality, lack of dedication to KM, use of temporary teams and project independence degree. Barriers such as outsourcing, distance work and the KM effort were included. It was also found that the lack of routines is not part of the IPECs environment and that the project uniqueness is not a barrier but an opportunity to generate knowledge. Conclusions: The analysis of the barriers that hinder KM in these environments allowed not only the verification of this influence in their processes, but also the form and extension with which it happens.\",\"PeriodicalId\":40617,\"journal\":{\"name\":\"AtoZ-Novas Praticas em Informacao e Conhecimento\",\"volume\":\"10 1\",\"pages\":\"50-59\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2021-01-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"AtoZ-Novas Praticas em Informacao e Conhecimento\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5380/ATOZ.V10I1.77978\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"INFORMATION SCIENCE & LIBRARY SCIENCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"AtoZ-Novas Praticas em Informacao e Conhecimento","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5380/ATOZ.V10I1.77978","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"INFORMATION SCIENCE & LIBRARY SCIENCE","Score":null,"Total":0}
引用次数: 0

摘要

项目型组织(PBO)的主要特征是市场运作的灵活性。这种灵活性虽然是积极的,但也会产生与项目固有问题(如时间性、唯一性和独立性)相关的障碍,使知识管理(KM)变得困难。本文分析了PBO环境中知识管理障碍的影响。方法:采用定性方法,对三个符合PBO标准的工业项目工程公司(IPEC)进行了多案例研究。通过访谈、直接观察和文献收集数据。结果:在文献中描述的6个障碍中,有4个得到了证实,它们是临时性、缺乏对KM的投入、使用临时团队和项目独立性。包括外包、远程工作和知识管理工作等障碍。我们还发现,缺乏常规程序不是ipec环境的一部分,项目的独特性不是障碍,而是产生知识的机会。结论:对这些环境中阻碍知识管理的障碍的分析不仅可以验证其过程中的影响,还可以验证其发生的形式和扩展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Gestão do Conhecimento em Organizações Baseadas em Projeto (OBPs): estudo de casos múltiplos
Introduction:  Project-Based Organizations (PBO) have the market operational flexibility as their main characteristic. Although positive, such flexibility results in barriers linked to the intrinsic project issues such as temporality, uniqueness and its independence degree, making Knowledge Management (KM) difficult. This article analyzes the influence of barriers to KM in the environment of PBO. Method: Using a qualitative approach, a multiple case study was carried out comprising three Industrial Project Engineering Companies (IPEC) that meet PBO criteria. Data were collected through interviews, direct observation and documents. Results: Four of the six barriers described in the literature were confirmed, and they were being temporality, lack of dedication to KM, use of temporary teams and project independence degree. Barriers such as outsourcing, distance work and the KM effort were included. It was also found that the lack of routines is not part of the IPECs environment and that the project uniqueness is not a barrier but an opportunity to generate knowledge. Conclusions: The analysis of the barriers that hinder KM in these environments allowed not only the verification of this influence in their processes, but also the form and extension with which it happens.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
AtoZ-Novas Praticas em Informacao e Conhecimento
AtoZ-Novas Praticas em Informacao e Conhecimento INFORMATION SCIENCE & LIBRARY SCIENCE-
CiteScore
0.40
自引率
33.30%
发文量
21
审稿时长
28 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信