在项目组合管理中所处理的工件的既定期望是什么?

IF 0.6 Q4 BUSINESS
Silvio Cesar Alves Teixeira, Cristiane Drebes Pedron
{"title":"在项目组合管理中所处理的工件的既定期望是什么?","authors":"Silvio Cesar Alves Teixeira, Cristiane Drebes Pedron","doi":"10.5585/gep.v14i2.23869","DOIUrl":null,"url":null,"abstract":"The objective of this research was to evaluate elements present in 75 academic articles and 308 patents to propose a research agenda considering the following question: What is expected from new artifacts aimed at Project Portfolio Management? As a method, we decided to carry out an Systematic Review of Literature and Patents and as results we identified artifacts such as models, methods and software distributed in two dimensions: (1) Plurality, built for specific situations and problems, present in the literature and not tested in the field, which demonstrate the path taken so far; (2) Prospecting, care that directs mapped needs to the development of new studies with greater practical application. As a guiding proposal, we propose the following factors Dynamic Portfolio, Simplification, Integrative Approach, and Integrated Tools to support future studies when there is a need to develop new studies focused on Project Portfolio Management.","PeriodicalId":42575,"journal":{"name":"Revista de Gestao e Projetos","volume":null,"pages":null},"PeriodicalIF":0.6000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"What are the established expectations for the artifacts addressed in project portfolio management?\",\"authors\":\"Silvio Cesar Alves Teixeira, Cristiane Drebes Pedron\",\"doi\":\"10.5585/gep.v14i2.23869\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The objective of this research was to evaluate elements present in 75 academic articles and 308 patents to propose a research agenda considering the following question: What is expected from new artifacts aimed at Project Portfolio Management? As a method, we decided to carry out an Systematic Review of Literature and Patents and as results we identified artifacts such as models, methods and software distributed in two dimensions: (1) Plurality, built for specific situations and problems, present in the literature and not tested in the field, which demonstrate the path taken so far; (2) Prospecting, care that directs mapped needs to the development of new studies with greater practical application. As a guiding proposal, we propose the following factors Dynamic Portfolio, Simplification, Integrative Approach, and Integrated Tools to support future studies when there is a need to develop new studies focused on Project Portfolio Management.\",\"PeriodicalId\":42575,\"journal\":{\"name\":\"Revista de Gestao e Projetos\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.6000,\"publicationDate\":\"2023-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Revista de Gestao e Projetos\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5585/gep.v14i2.23869\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista de Gestao e Projetos","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5585/gep.v14i2.23869","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"BUSINESS","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是评估75篇学术文章和308项专利中出现的元素,并提出一个考虑以下问题的研究议程:针对项目组合管理的新工件的期望是什么?作为一种方法,我们决定对文献和专利进行系统回顾,作为结果,我们确定了分布在两个维度上的工件,如模型、方法和软件:(1)为特定情况和问题构建的多样性,存在于文献中,但未在该领域进行测试,这表明了迄今为止所采取的路径;(2)探矿,引导测绘需求发展具有更大实际应用价值的新研究。作为指导性建议,我们提出了以下因素动态组合、简化、综合方法和综合工具,以支持未来的研究,当需要开发新的研究集中在项目组合管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
What are the established expectations for the artifacts addressed in project portfolio management?
The objective of this research was to evaluate elements present in 75 academic articles and 308 patents to propose a research agenda considering the following question: What is expected from new artifacts aimed at Project Portfolio Management? As a method, we decided to carry out an Systematic Review of Literature and Patents and as results we identified artifacts such as models, methods and software distributed in two dimensions: (1) Plurality, built for specific situations and problems, present in the literature and not tested in the field, which demonstrate the path taken so far; (2) Prospecting, care that directs mapped needs to the development of new studies with greater practical application. As a guiding proposal, we propose the following factors Dynamic Portfolio, Simplification, Integrative Approach, and Integrated Tools to support future studies when there is a need to develop new studies focused on Project Portfolio Management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
18
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信