{"title":"基于浮动支架的折叠桥快速设计方法","authors":"J. Marszałek, M. Piechota","doi":"10.5604/12345865.1223256","DOIUrl":null,"url":null,"abstract":". The article includes a methodology for the rapid design of the folding bridge based on floating supports. This methodology includes an analysis of the possibilities of using blocks from the park pontoon PP-64 as a support for the floating folding DMS-65 bridge, built as a temporary crossing for civilian application. The analysis was carried out for the bridge loaded with a moving vehicle. The results of this analysis have been developed in the form of nomograms that enable rapid development of crossings in different structural systems.","PeriodicalId":9068,"journal":{"name":"Biuletyn Wojskowej Akademii Technicznej","volume":"65 1","pages":"63-74"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Metoda szybkiego projektowania mostu składanego opartego na podporach pływających\",\"authors\":\"J. Marszałek, M. Piechota\",\"doi\":\"10.5604/12345865.1223256\",\"DOIUrl\":null,\"url\":null,\"abstract\":\". The article includes a methodology for the rapid design of the folding bridge based on floating supports. This methodology includes an analysis of the possibilities of using blocks from the park pontoon PP-64 as a support for the floating folding DMS-65 bridge, built as a temporary crossing for civilian application. The analysis was carried out for the bridge loaded with a moving vehicle. The results of this analysis have been developed in the form of nomograms that enable rapid development of crossings in different structural systems.\",\"PeriodicalId\":9068,\"journal\":{\"name\":\"Biuletyn Wojskowej Akademii Technicznej\",\"volume\":\"65 1\",\"pages\":\"63-74\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Biuletyn Wojskowej Akademii Technicznej\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5604/12345865.1223256\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Biuletyn Wojskowej Akademii Technicznej","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5604/12345865.1223256","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Metoda szybkiego projektowania mostu składanego opartego na podporach pływających
. The article includes a methodology for the rapid design of the folding bridge based on floating supports. This methodology includes an analysis of the possibilities of using blocks from the park pontoon PP-64 as a support for the floating folding DMS-65 bridge, built as a temporary crossing for civilian application. The analysis was carried out for the bridge loaded with a moving vehicle. The results of this analysis have been developed in the form of nomograms that enable rapid development of crossings in different structural systems.