A. N. Domrachev, V. Krivolapov, D. Paleev, I.M. Pozdeeva
{"title":"影响劳动强度和密封工期的复杂因素估算","authors":"A. N. Domrachev, V. Krivolapov, D. Paleev, I.M. Pozdeeva","doi":"10.46689/2218-5194-2021-4-1-357-364","DOIUrl":null,"url":null,"abstract":"In this paper the methodology for increasing the management efficiency of seals con-struction by using cognitive work analysis is described. The results of cognitive modeling such as a way to reduce labour intensity and seals construction period during the mine rescue oper-ations focused on sealing entries and gob areas are obtained.","PeriodicalId":41869,"journal":{"name":"Proceedings of the Tula States University-Sciences of Earth","volume":"1 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ESTIMATION OF COMPLICATING FACTORS INFLUENCE ON LABOUR INTENSITY AND SEALS CONSTRUCTION PERIOD\",\"authors\":\"A. N. Domrachev, V. Krivolapov, D. Paleev, I.M. Pozdeeva\",\"doi\":\"10.46689/2218-5194-2021-4-1-357-364\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper the methodology for increasing the management efficiency of seals con-struction by using cognitive work analysis is described. The results of cognitive modeling such as a way to reduce labour intensity and seals construction period during the mine rescue oper-ations focused on sealing entries and gob areas are obtained.\",\"PeriodicalId\":41869,\"journal\":{\"name\":\"Proceedings of the Tula States University-Sciences of Earth\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Tula States University-Sciences of Earth\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46689/2218-5194-2021-4-1-357-364\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"GEOSCIENCES, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Tula States University-Sciences of Earth","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46689/2218-5194-2021-4-1-357-364","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
ESTIMATION OF COMPLICATING FACTORS INFLUENCE ON LABOUR INTENSITY AND SEALS CONSTRUCTION PERIOD
In this paper the methodology for increasing the management efficiency of seals con-struction by using cognitive work analysis is described. The results of cognitive modeling such as a way to reduce labour intensity and seals construction period during the mine rescue oper-ations focused on sealing entries and gob areas are obtained.