{"title":"政府管理信息系统实施中的人性化问题","authors":"Susan K. Lippert","doi":"10.4018/978-1-59140-061-5.CH008","DOIUrl":null,"url":null,"abstract":"A United States Government Defense Agency charged with the acquisition and procurement of weapons systems required a comprehensive Management Information System (MIS). The Integrated Product and Process Management Information System (IPPMIS) was expected to integrate standard procurement functions through a hardware and software application. A defense contractor was 'hired' to design, develop, build, test and deploy an integrated acquisition project MIS, including career development and the management of personnel for program managers. The information system was designed and implemented without due consideration or management of the human side of systems development. The lack of human factors generated cost overruns, time delays and ultimately a partial failure of the system. This case addresses the behavioral, managerial and organizational shortcomings of the MIS process, which ultimately led to a less than effective implementation.","PeriodicalId":43384,"journal":{"name":"Journal of Cases on Information Technology","volume":"5 1","pages":"112-129"},"PeriodicalIF":0.7000,"publicationDate":"2003-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Humanware issues in a government management information systems implementation\",\"authors\":\"Susan K. Lippert\",\"doi\":\"10.4018/978-1-59140-061-5.CH008\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A United States Government Defense Agency charged with the acquisition and procurement of weapons systems required a comprehensive Management Information System (MIS). The Integrated Product and Process Management Information System (IPPMIS) was expected to integrate standard procurement functions through a hardware and software application. A defense contractor was 'hired' to design, develop, build, test and deploy an integrated acquisition project MIS, including career development and the management of personnel for program managers. The information system was designed and implemented without due consideration or management of the human side of systems development. The lack of human factors generated cost overruns, time delays and ultimately a partial failure of the system. This case addresses the behavioral, managerial and organizational shortcomings of the MIS process, which ultimately led to a less than effective implementation.\",\"PeriodicalId\":43384,\"journal\":{\"name\":\"Journal of Cases on Information Technology\",\"volume\":\"5 1\",\"pages\":\"112-129\"},\"PeriodicalIF\":0.7000,\"publicationDate\":\"2003-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Cases on Information Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/978-1-59140-061-5.CH008\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"COMPUTER SCIENCE, INFORMATION SYSTEMS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Cases on Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/978-1-59140-061-5.CH008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"COMPUTER SCIENCE, INFORMATION SYSTEMS","Score":null,"Total":0}
Humanware issues in a government management information systems implementation
A United States Government Defense Agency charged with the acquisition and procurement of weapons systems required a comprehensive Management Information System (MIS). The Integrated Product and Process Management Information System (IPPMIS) was expected to integrate standard procurement functions through a hardware and software application. A defense contractor was 'hired' to design, develop, build, test and deploy an integrated acquisition project MIS, including career development and the management of personnel for program managers. The information system was designed and implemented without due consideration or management of the human side of systems development. The lack of human factors generated cost overruns, time delays and ultimately a partial failure of the system. This case addresses the behavioral, managerial and organizational shortcomings of the MIS process, which ultimately led to a less than effective implementation.
期刊介绍:
JCIT documents comprehensive, real-life cases based on individual, organizational and societal experiences related to the utilization and management of information technology. Cases published in JCIT deal with a wide variety of organizations such as businesses, government organizations, educational institutions, libraries, non-profit organizations. Additionally, cases published in JCIT report not only successful utilization of IT applications, but also failures and mismanagement of IT resources and applications.