超越大埃塞俄比亚复兴大坝蓄水政策的影响

IF 0.9 Q4 GEOSCIENCES, MULTIDISCIPLINARY
A. Yimere, E. Assefa
{"title":"超越大埃塞俄比亚复兴大坝蓄水政策的影响","authors":"A. Yimere, E. Assefa","doi":"10.3934/geosci.2021019","DOIUrl":null,"url":null,"abstract":"The Grand Ethiopian Renaissance Dam (GERD) in Ethiopia and High Aswan Dam (HAD) in Egypt both operate on the Nile River, independent of a governing international treaty or agreement. As a result, the construction of the GERD, the Earth's eighth largest dam, ignited a furious debate among Ethiopia, Sudan, and Egypt on its filling policies and long-term operation. Ethiopia and Egypt's stance on the Nile River's water resources, combined with a nationalistic policy debate on the GERD's filling policies and long-term operation, has severely affected progress toward reaching agreeable terms before the first round of GERD filling was completed. These three countries continue to debate on the terms of agreement for the second round of GERD filling, scheduled to start by July 2021. We examined the GERD filling strategy for five- and six-year terms using time series data for the periods 1979–1987 and 1987–1992 to combine analyses for dry and wet seasons and investigate the potential impacts of filling the GERD above the downstream HAD using four HAD starting water levels. A model calibrated using MIKE Hydro results shows that during both five- and six-year terms of future GERD filling, Egypt would not need to invoke the HAD's minimum operating level. We pursued a narrative approach that appeals to both a technical and non-technical readership, and our results show the urgent need for cooperation at both policy and technical levels to mitigate and adapt to future climate change through the development of climate-proof agreements. Moreover, the results call for the riparian countries to move away from the current nationalistic policy debate approach and pursue a more cooperative, economically beneficial, and climate adaptive approach.","PeriodicalId":43999,"journal":{"name":"AIMS Geosciences","volume":"1 1","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Beyond the implications of Grand Ethiopian Renaissance Dam filling policies\",\"authors\":\"A. Yimere, E. Assefa\",\"doi\":\"10.3934/geosci.2021019\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Grand Ethiopian Renaissance Dam (GERD) in Ethiopia and High Aswan Dam (HAD) in Egypt both operate on the Nile River, independent of a governing international treaty or agreement. As a result, the construction of the GERD, the Earth's eighth largest dam, ignited a furious debate among Ethiopia, Sudan, and Egypt on its filling policies and long-term operation. Ethiopia and Egypt's stance on the Nile River's water resources, combined with a nationalistic policy debate on the GERD's filling policies and long-term operation, has severely affected progress toward reaching agreeable terms before the first round of GERD filling was completed. These three countries continue to debate on the terms of agreement for the second round of GERD filling, scheduled to start by July 2021. We examined the GERD filling strategy for five- and six-year terms using time series data for the periods 1979–1987 and 1987–1992 to combine analyses for dry and wet seasons and investigate the potential impacts of filling the GERD above the downstream HAD using four HAD starting water levels. A model calibrated using MIKE Hydro results shows that during both five- and six-year terms of future GERD filling, Egypt would not need to invoke the HAD's minimum operating level. We pursued a narrative approach that appeals to both a technical and non-technical readership, and our results show the urgent need for cooperation at both policy and technical levels to mitigate and adapt to future climate change through the development of climate-proof agreements. Moreover, the results call for the riparian countries to move away from the current nationalistic policy debate approach and pursue a more cooperative, economically beneficial, and climate adaptive approach.\",\"PeriodicalId\":43999,\"journal\":{\"name\":\"AIMS Geosciences\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"AIMS Geosciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3934/geosci.2021019\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"GEOSCIENCES, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"AIMS Geosciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3934/geosci.2021019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 2

摘要

埃塞俄比亚的大埃塞俄比亚复兴大坝(GERD)和埃及的高阿斯旺大坝(HAD)都在尼罗河上运行,独立于国际条约或协议。因此,世界第八大大坝GERD的建设在埃塞俄比亚、苏丹和埃及之间引发了关于其蓄水政策和长期运营的激烈争论。埃塞俄比亚和埃及在尼罗河水资源问题上的立场,再加上关于GERD灌水政策和长期运营的民族主义政策辩论,严重影响了在第一轮GERD灌水完成之前达成一致条款的进展。这三个国家继续就第二轮GERD填补的协议条款进行辩论,该协议将于2021年7月开始。我们使用1979-1987年和1987-1992年的时间序列数据,研究了五年和六年的GERD填充策略,结合旱季和雨季的分析,并研究了使用四个HAD的起始水位将GERD填充到下游HAD以上的潜在影响。使用MIKE Hydro结果校准的模型显示,在未来5年和6年的GERD填充期间,埃及不需要调用HAD的最低运行水平。我们采用了一种对技术和非技术读者都有吸引力的叙事方法,我们的研究结果表明,迫切需要在政策和技术层面进行合作,通过制定气候保护协议来减缓和适应未来的气候变化。此外,研究结果呼吁沿岸国家放弃目前的民族主义政策辩论方式,而采取一种更具合作性、经济效益和气候适应性的方式。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Beyond the implications of Grand Ethiopian Renaissance Dam filling policies
The Grand Ethiopian Renaissance Dam (GERD) in Ethiopia and High Aswan Dam (HAD) in Egypt both operate on the Nile River, independent of a governing international treaty or agreement. As a result, the construction of the GERD, the Earth's eighth largest dam, ignited a furious debate among Ethiopia, Sudan, and Egypt on its filling policies and long-term operation. Ethiopia and Egypt's stance on the Nile River's water resources, combined with a nationalistic policy debate on the GERD's filling policies and long-term operation, has severely affected progress toward reaching agreeable terms before the first round of GERD filling was completed. These three countries continue to debate on the terms of agreement for the second round of GERD filling, scheduled to start by July 2021. We examined the GERD filling strategy for five- and six-year terms using time series data for the periods 1979–1987 and 1987–1992 to combine analyses for dry and wet seasons and investigate the potential impacts of filling the GERD above the downstream HAD using four HAD starting water levels. A model calibrated using MIKE Hydro results shows that during both five- and six-year terms of future GERD filling, Egypt would not need to invoke the HAD's minimum operating level. We pursued a narrative approach that appeals to both a technical and non-technical readership, and our results show the urgent need for cooperation at both policy and technical levels to mitigate and adapt to future climate change through the development of climate-proof agreements. Moreover, the results call for the riparian countries to move away from the current nationalistic policy debate approach and pursue a more cooperative, economically beneficial, and climate adaptive approach.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
AIMS Geosciences
AIMS Geosciences GEOSCIENCES, MULTIDISCIPLINARY-
自引率
7.70%
发文量
31
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信