摩洛哥PGAA/NI仪器的概念实施阶段:第一阶段和第二阶段

IF 1 Q3 NUCLEAR SCIENCE & TECHNOLOGY
H. Amsil, A. Jalil, K. Embarch, H. Bounouira, Abdessamad DIDI, K. Laraki, H. Marah, A. Chetaine
{"title":"摩洛哥PGAA/NI仪器的概念实施阶段:第一阶段和第二阶段","authors":"H. Amsil, A. Jalil, K. Embarch, H. Bounouira, Abdessamad DIDI, K. Laraki, H. Marah, A. Chetaine","doi":"10.3233/JNR-200171","DOIUrl":null,"url":null,"abstract":"The first installation around the tangential beam tube of the Moroccan TRIGA Mark II research reactor comprises combined instruments for Prompt Gamma Neutron Activation Analysis (PGAA) and Neutron Imaging (NI). The implementation of this project is divided over three main stages, namely the installation of the collimator and the primary beam shutter, which is a common section for introduction inside the reactor; the PGAA instruments’ installation; and finally, the installation of the PGNAA/NI combined instruments. The entire design was planned for this project, and detailed information about the first and the second stage is described in this work.","PeriodicalId":44708,"journal":{"name":"Journal of Neutron Research","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Conceptual implementation stages for Moroccan PGAA/NI instruments: STAGE I & II\",\"authors\":\"H. Amsil, A. Jalil, K. Embarch, H. Bounouira, Abdessamad DIDI, K. Laraki, H. Marah, A. Chetaine\",\"doi\":\"10.3233/JNR-200171\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The first installation around the tangential beam tube of the Moroccan TRIGA Mark II research reactor comprises combined instruments for Prompt Gamma Neutron Activation Analysis (PGAA) and Neutron Imaging (NI). The implementation of this project is divided over three main stages, namely the installation of the collimator and the primary beam shutter, which is a common section for introduction inside the reactor; the PGAA instruments’ installation; and finally, the installation of the PGNAA/NI combined instruments. The entire design was planned for this project, and detailed information about the first and the second stage is described in this work.\",\"PeriodicalId\":44708,\"journal\":{\"name\":\"Journal of Neutron Research\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Neutron Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3233/JNR-200171\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"NUCLEAR SCIENCE & TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Neutron Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3233/JNR-200171","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"NUCLEAR SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 2

摘要

摩洛哥TRIGA Mark II研究堆的切向束流管周围的第一个装置包括快速伽马中子活化分析(PGAA)和中子成像(NI)的组合仪器。本工程的实施分为三个主要阶段,即准直器和主光束百叶窗的安装,主光束百叶窗是反应器内部引入的共同部分;PGAA仪器的安装;最后是PGNAA/NI组合仪器的安装。本设计对整个项目进行了规划,并详细介绍了第一阶段和第二阶段的设计情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Conceptual implementation stages for Moroccan PGAA/NI instruments: STAGE I & II
The first installation around the tangential beam tube of the Moroccan TRIGA Mark II research reactor comprises combined instruments for Prompt Gamma Neutron Activation Analysis (PGAA) and Neutron Imaging (NI). The implementation of this project is divided over three main stages, namely the installation of the collimator and the primary beam shutter, which is a common section for introduction inside the reactor; the PGAA instruments’ installation; and finally, the installation of the PGNAA/NI combined instruments. The entire design was planned for this project, and detailed information about the first and the second stage is described in this work.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Neutron Research
Journal of Neutron Research NUCLEAR SCIENCE & TECHNOLOGY-
CiteScore
2.30
自引率
9.10%
发文量
23
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信