{"title":"论干扰地复垦工作用地管理项目的开发","authors":"A. Koshel, I. Kolhanova","doi":"10.31548/zemleustriy2022.04.07","DOIUrl":null,"url":null,"abstract":"Scientific and methodical approaches to the development of working land management projects for the reclamation of lands disturbed by industrial production are proposed.After the completion of mining operations, their restoration, i.e. reclamation, must be carried out on the disturbed territories. Land reclamation is a complex of works aimed at restoring the productivity and economic value of disturbed lands, as well as improving environmental conditions in accordance with the interests of society.Any construction, mining, geological exploration, etc. cannot begin until a reclamation project for the disturbed soil cover is developed. Reclamation is subject to all lands undergoing changes in relief, soil cover, parent and underlying rocks that occur or have already occurred in the process of mining, construction, hydraulic engineering, geological exploration and other works.","PeriodicalId":56214,"journal":{"name":"Zemleustrij Kadastr i Monitoring Zemel''","volume":"53 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"On the development of working land management projects for the reclamation of disturbed lands\",\"authors\":\"A. Koshel, I. Kolhanova\",\"doi\":\"10.31548/zemleustriy2022.04.07\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Scientific and methodical approaches to the development of working land management projects for the reclamation of lands disturbed by industrial production are proposed.After the completion of mining operations, their restoration, i.e. reclamation, must be carried out on the disturbed territories. Land reclamation is a complex of works aimed at restoring the productivity and economic value of disturbed lands, as well as improving environmental conditions in accordance with the interests of society.Any construction, mining, geological exploration, etc. cannot begin until a reclamation project for the disturbed soil cover is developed. Reclamation is subject to all lands undergoing changes in relief, soil cover, parent and underlying rocks that occur or have already occurred in the process of mining, construction, hydraulic engineering, geological exploration and other works.\",\"PeriodicalId\":56214,\"journal\":{\"name\":\"Zemleustrij Kadastr i Monitoring Zemel''\",\"volume\":\"53 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Zemleustrij Kadastr i Monitoring Zemel''\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31548/zemleustriy2022.04.07\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Zemleustrij Kadastr i Monitoring Zemel''","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31548/zemleustriy2022.04.07","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

提出了科学和系统的方法来开发受工业生产干扰的土地的复垦工作用地管理项目。在采矿作业完成后,必须在受干扰的领土上进行采矿作业的恢复,即开垦。土地复垦是一项综合工程,旨在恢复受干扰土地的生产力和经济价值,并根据社会利益改善环境条件。任何建筑、采矿、地质勘探等,必须在开发出受扰动的土壤覆盖层的复垦项目后才能开始。在采矿、建筑、水利工程、地质勘探和其他工程过程中发生或已经发生地形、土壤覆盖、母质和下伏岩石变化的所有土地,均应填海。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
On the development of working land management projects for the reclamation of disturbed lands
Scientific and methodical approaches to the development of working land management projects for the reclamation of lands disturbed by industrial production are proposed.After the completion of mining operations, their restoration, i.e. reclamation, must be carried out on the disturbed territories. Land reclamation is a complex of works aimed at restoring the productivity and economic value of disturbed lands, as well as improving environmental conditions in accordance with the interests of society.Any construction, mining, geological exploration, etc. cannot begin until a reclamation project for the disturbed soil cover is developed. Reclamation is subject to all lands undergoing changes in relief, soil cover, parent and underlying rocks that occur or have already occurred in the process of mining, construction, hydraulic engineering, geological exploration and other works.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
25
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信