后安装加固的设计和安装:最新的回顾

Q2 Engineering
D. Looi, Yuen Fai Augustus Lee, R. Su, Yanlong Zhang
{"title":"后安装加固的设计和安装:最新的回顾","authors":"D. Looi, Yuen Fai Augustus Lee, R. Su, Yanlong Zhang","doi":"10.33430/V27N2THIE-2019-0033","DOIUrl":null,"url":null,"abstract":"Post-installed reinforcement (PIR) helps facilitate retrofitting works, mitigate misplaced reinforcement problems, as well as support newly cast concrete members such as modular integrated construction. However, it has not been holistically addressed in major international reinforced concrete (RC) design codes. Nonetheless, based on established design philosophy and associated failure modes, the cast-in reinforcement design method in RC can be extended to design qualified PIR systems. The qualification of PIR system can be referenced to Acceptance Criteria (AC) 308 (2016), European Assessment Document (EAD) 330087 (2018) and EAD 330499 (2017) in the US and Europe, respectively. In Hong Kong, PIR is conservatively limited to shear connections. Its assumption of pinned connection is less justifiable for some deep sections of beams, which may induce hogging moments, causing tension at the top reinforcement of the supports. In some cases of cantilever slabs, moment connections are necessary to maintain equilibrium. Hence, this paper reviews an up-to-date design methodology and installation guide to complement the Hong Kong Code of Practice for Structural Use of Concrete (HKBD) by referring to the recently published international design codes and documents. The proposal is useful to promote economical, sustainable and technically sound use of PIR system.","PeriodicalId":35587,"journal":{"name":"Transactions Hong Kong Institution of Engineers","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Design and installation of post-installed reinforcements: A state-of-the-art review\",\"authors\":\"D. Looi, Yuen Fai Augustus Lee, R. Su, Yanlong Zhang\",\"doi\":\"10.33430/V27N2THIE-2019-0033\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Post-installed reinforcement (PIR) helps facilitate retrofitting works, mitigate misplaced reinforcement problems, as well as support newly cast concrete members such as modular integrated construction. However, it has not been holistically addressed in major international reinforced concrete (RC) design codes. Nonetheless, based on established design philosophy and associated failure modes, the cast-in reinforcement design method in RC can be extended to design qualified PIR systems. The qualification of PIR system can be referenced to Acceptance Criteria (AC) 308 (2016), European Assessment Document (EAD) 330087 (2018) and EAD 330499 (2017) in the US and Europe, respectively. In Hong Kong, PIR is conservatively limited to shear connections. Its assumption of pinned connection is less justifiable for some deep sections of beams, which may induce hogging moments, causing tension at the top reinforcement of the supports. In some cases of cantilever slabs, moment connections are necessary to maintain equilibrium. Hence, this paper reviews an up-to-date design methodology and installation guide to complement the Hong Kong Code of Practice for Structural Use of Concrete (HKBD) by referring to the recently published international design codes and documents. The proposal is useful to promote economical, sustainable and technically sound use of PIR system.\",\"PeriodicalId\":35587,\"journal\":{\"name\":\"Transactions Hong Kong Institution of Engineers\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transactions Hong Kong Institution of Engineers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33430/V27N2THIE-2019-0033\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions Hong Kong Institution of Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33430/V27N2THIE-2019-0033","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 4

摘要

后安装钢筋(PIR)有助于促进加固工程,减轻错位的钢筋问题,以及支持新浇筑的混凝土构件,如模块化集成结构。然而,在主要的国际钢筋混凝土(RC)设计规范中,这一问题尚未得到全面解决。尽管如此,基于既定的设计理念和相关的破坏模式,钢筋混凝土的浇筑钢筋设计方法可以扩展到设计合格的PIR系统。PIR系统的资格可分别参考美国和欧洲的验收标准(AC) 308(2016)、欧洲评估文件(EAD) 330087(2018)和EAD 330499(2017)。在香港,PIR保守地局限于剪切连接。其假设的钉住连接是不太合理的一些较深的部分梁,这可能会引起霸占力矩,造成张力的顶部加固的支持。在悬臂板的某些情况下,力矩连接是保持平衡所必需的。因此,本文参考最新出版的国际设计规范和文件,检讨最新的设计方法和安装指引,以补充《香港混凝土结构使用工作守则》。该建议有助于促进经济、可持续和技术合理地使用PIR系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Design and installation of post-installed reinforcements: A state-of-the-art review
Post-installed reinforcement (PIR) helps facilitate retrofitting works, mitigate misplaced reinforcement problems, as well as support newly cast concrete members such as modular integrated construction. However, it has not been holistically addressed in major international reinforced concrete (RC) design codes. Nonetheless, based on established design philosophy and associated failure modes, the cast-in reinforcement design method in RC can be extended to design qualified PIR systems. The qualification of PIR system can be referenced to Acceptance Criteria (AC) 308 (2016), European Assessment Document (EAD) 330087 (2018) and EAD 330499 (2017) in the US and Europe, respectively. In Hong Kong, PIR is conservatively limited to shear connections. Its assumption of pinned connection is less justifiable for some deep sections of beams, which may induce hogging moments, causing tension at the top reinforcement of the supports. In some cases of cantilever slabs, moment connections are necessary to maintain equilibrium. Hence, this paper reviews an up-to-date design methodology and installation guide to complement the Hong Kong Code of Practice for Structural Use of Concrete (HKBD) by referring to the recently published international design codes and documents. The proposal is useful to promote economical, sustainable and technically sound use of PIR system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Transactions Hong Kong Institution of Engineers
Transactions Hong Kong Institution of Engineers Engineering-Engineering (all)
CiteScore
2.70
自引率
0.00%
发文量
22
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信