确定桥梁粉刷周期的方法

C. Kirsch
{"title":"确定桥梁粉刷周期的方法","authors":"C. Kirsch","doi":"10.3323/JCORR1954.15.2_72","DOIUrl":null,"url":null,"abstract":"FACTORS INFLUENCING EFFECTIVENESS, COST, AND TIME CYCLES FOR BRIDGE PAINTING ARE DISCUSSED. STRUCTURAL, ENVIRONMENTAL , AND CHEMICAL FACTORS OF THE PAINT SYSTEM ARE CONSIDERED IN THE MATHEMATICAL MODEL DESCRIBED. HOW MATHEMATICAL EVALUATION CAN AFFECT THE DECISION OF OPTIMUM PAINTING CYCLE TIMES IS SHOWN. THE PROCEDURE HAS BEEN USED BY PORT OF NEW YORK AUTHORITY, TUNNELS AND BRIDGES DEPARTMENT, TO EVALUATE PAINTING CYCLES FOR NEW YORK BRIDGES.","PeriodicalId":18284,"journal":{"name":"Materials protection","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"1965-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.3323/JCORR1954.15.2_72","citationCount":"0","resultStr":"{\"title\":\"A METHOD FOR DETERMINING BRIDGE PAINTING CYCLES\",\"authors\":\"C. Kirsch\",\"doi\":\"10.3323/JCORR1954.15.2_72\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"FACTORS INFLUENCING EFFECTIVENESS, COST, AND TIME CYCLES FOR BRIDGE PAINTING ARE DISCUSSED. STRUCTURAL, ENVIRONMENTAL , AND CHEMICAL FACTORS OF THE PAINT SYSTEM ARE CONSIDERED IN THE MATHEMATICAL MODEL DESCRIBED. HOW MATHEMATICAL EVALUATION CAN AFFECT THE DECISION OF OPTIMUM PAINTING CYCLE TIMES IS SHOWN. THE PROCEDURE HAS BEEN USED BY PORT OF NEW YORK AUTHORITY, TUNNELS AND BRIDGES DEPARTMENT, TO EVALUATE PAINTING CYCLES FOR NEW YORK BRIDGES.\",\"PeriodicalId\":18284,\"journal\":{\"name\":\"Materials protection\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1965-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.3323/JCORR1954.15.2_72\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Materials protection\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.3323/JCORR1954.15.2_72\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Materials protection","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.3323/JCORR1954.15.2_72","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

讨论了影响桥梁涂装效果、成本和时间周期的因素。所描述的数学模型考虑了涂料系统的结构、环境和化学因素。说明了数学评价如何影响最佳喷涂周期时间的确定。该程序已被纽约港务局、隧道和桥梁部门用于评估纽约桥梁的油漆周期。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A METHOD FOR DETERMINING BRIDGE PAINTING CYCLES
FACTORS INFLUENCING EFFECTIVENESS, COST, AND TIME CYCLES FOR BRIDGE PAINTING ARE DISCUSSED. STRUCTURAL, ENVIRONMENTAL , AND CHEMICAL FACTORS OF THE PAINT SYSTEM ARE CONSIDERED IN THE MATHEMATICAL MODEL DESCRIBED. HOW MATHEMATICAL EVALUATION CAN AFFECT THE DECISION OF OPTIMUM PAINTING CYCLE TIMES IS SHOWN. THE PROCEDURE HAS BEEN USED BY PORT OF NEW YORK AUTHORITY, TUNNELS AND BRIDGES DEPARTMENT, TO EVALUATE PAINTING CYCLES FOR NEW YORK BRIDGES.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信