项目控制系统的结果价值方法应用

Siti Yuliani Pujihastuti, Mandiyo Priyo
{"title":"项目控制系统的结果价值方法应用","authors":"Siti Yuliani Pujihastuti, Mandiyo Priyo","doi":"10.18196/st.v15i2.1359","DOIUrl":null,"url":null,"abstract":"In a project implementation, the project implementer wants the project completed on time as efficient as possible while the produced quality is in accordance with the initial plan. Therefore, in order to meet the requirements for controlling process and to minimize any deviations that can occur during the project, the earned value method is considered accurate. The aim of this study was to identify the final result of the project which will be achieved in the aspect of cost (whether the project experience gains, losses, or within budget) and time (whether the project is delayed, ended early, or on time as scheduled). The study was conducted on the 4th, 8th, 12th, 16th, and 20th weeks by using the earned value. Earned Value Method, or often called the Concept of Earned Value, is the concept of calculating project costs in accordance with the budget and the scope of job which have been completed or implemented (budgeted cost of works performed). This method combines the cost, schedule, and work performance of a project. Therefore, this method is considered effective in monitoring and controlling project activities.","PeriodicalId":33667,"journal":{"name":"Semesta Teknika","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2016-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Aplikasi Metode Nilai Hasil (Earned Value Method) pada Sistem Pengendalian Proyek\",\"authors\":\"Siti Yuliani Pujihastuti, Mandiyo Priyo\",\"doi\":\"10.18196/st.v15i2.1359\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In a project implementation, the project implementer wants the project completed on time as efficient as possible while the produced quality is in accordance with the initial plan. Therefore, in order to meet the requirements for controlling process and to minimize any deviations that can occur during the project, the earned value method is considered accurate. The aim of this study was to identify the final result of the project which will be achieved in the aspect of cost (whether the project experience gains, losses, or within budget) and time (whether the project is delayed, ended early, or on time as scheduled). The study was conducted on the 4th, 8th, 12th, 16th, and 20th weeks by using the earned value. Earned Value Method, or often called the Concept of Earned Value, is the concept of calculating project costs in accordance with the budget and the scope of job which have been completed or implemented (budgeted cost of works performed). This method combines the cost, schedule, and work performance of a project. Therefore, this method is considered effective in monitoring and controlling project activities.\",\"PeriodicalId\":33667,\"journal\":{\"name\":\"Semesta Teknika\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-03-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Semesta Teknika\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18196/st.v15i2.1359\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Semesta Teknika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18196/st.v15i2.1359","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在项目实施中,项目执行者希望项目尽可能按时高效地完成,同时生产质量符合初始计划。因此,为了满足控制过程的需求,并最小化项目中可能发生的任何偏差,挣值方法被认为是准确的。本研究的目的是确定项目在成本(项目经验是否获得,损失或在预算范围内)和时间(项目是否延迟,提前结束或按计划按时结束)方面将实现的最终结果。研究分别于第4、8、12、16、20周采用挣值法进行。挣值法,或通常称为挣值概念,是根据预算和已完成或实施的工作范围(已完成工作的预算成本)计算项目成本的概念。这种方法结合了项目的成本、进度和工作绩效。因此,这种方法被认为在监视和控制项目活动方面是有效的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Aplikasi Metode Nilai Hasil (Earned Value Method) pada Sistem Pengendalian Proyek
In a project implementation, the project implementer wants the project completed on time as efficient as possible while the produced quality is in accordance with the initial plan. Therefore, in order to meet the requirements for controlling process and to minimize any deviations that can occur during the project, the earned value method is considered accurate. The aim of this study was to identify the final result of the project which will be achieved in the aspect of cost (whether the project experience gains, losses, or within budget) and time (whether the project is delayed, ended early, or on time as scheduled). The study was conducted on the 4th, 8th, 12th, 16th, and 20th weeks by using the earned value. Earned Value Method, or often called the Concept of Earned Value, is the concept of calculating project costs in accordance with the budget and the scope of job which have been completed or implemented (budgeted cost of works performed). This method combines the cost, schedule, and work performance of a project. Therefore, this method is considered effective in monitoring and controlling project activities.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
10
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信