Achouri Ali, Emira Khedhiri, Ramzi Talmoudi, H. Taleb
{"title":"基于加权卡方控制图的多项过程监控","authors":"Achouri Ali, Emira Khedhiri, Ramzi Talmoudi, H. Taleb","doi":"10.1590/1806-9649-2021v28e43","DOIUrl":null,"url":null,"abstract":"Abstract: Interpreting an out-of-control signal is a crucial step in monitoring categorical processes. For the Chi-Square Control Chart (CSCC), an out-of control situation does not specify if it was a process deterioration or a process improvement. For this reason, a weighted chi-square statistical control chart WSCC is proposed with different weighting categories in order to enable an accelerated disclosure of a control situation after a shift due to a deterioration of quality and on the other hand, decelerate an out of control situation after a shift due to a quality improvement. Furthermore, in comparison with Marcucci’s method, the new procedure provides an accurate and easier way to interpret several signals. In other words, the WSCC allows a faster detection of an out-of control situation in the case of a quality deterioration, however, an out-of control situation is not quickly detected in the case of a quality improvement. Indeed, comparative studies have been performed to find the best control chart for each combination. Concluding remarks with comments and recommendations are given based on Average Run Length (ARL) and standard deviation run length (SDRL).","PeriodicalId":35415,"journal":{"name":"Gestao e Producao","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-07-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Monitoring multinomial processes based on a weighted chi-square control chart\",\"authors\":\"Achouri Ali, Emira Khedhiri, Ramzi Talmoudi, H. Taleb\",\"doi\":\"10.1590/1806-9649-2021v28e43\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract: Interpreting an out-of-control signal is a crucial step in monitoring categorical processes. For the Chi-Square Control Chart (CSCC), an out-of control situation does not specify if it was a process deterioration or a process improvement. For this reason, a weighted chi-square statistical control chart WSCC is proposed with different weighting categories in order to enable an accelerated disclosure of a control situation after a shift due to a deterioration of quality and on the other hand, decelerate an out of control situation after a shift due to a quality improvement. Furthermore, in comparison with Marcucci’s method, the new procedure provides an accurate and easier way to interpret several signals. In other words, the WSCC allows a faster detection of an out-of control situation in the case of a quality deterioration, however, an out-of control situation is not quickly detected in the case of a quality improvement. Indeed, comparative studies have been performed to find the best control chart for each combination. Concluding remarks with comments and recommendations are given based on Average Run Length (ARL) and standard deviation run length (SDRL).\",\"PeriodicalId\":35415,\"journal\":{\"name\":\"Gestao e Producao\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Gestao e Producao\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1590/1806-9649-2021v28e43\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gestao e Producao","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1590/1806-9649-2021v28e43","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
Monitoring multinomial processes based on a weighted chi-square control chart
Abstract: Interpreting an out-of-control signal is a crucial step in monitoring categorical processes. For the Chi-Square Control Chart (CSCC), an out-of control situation does not specify if it was a process deterioration or a process improvement. For this reason, a weighted chi-square statistical control chart WSCC is proposed with different weighting categories in order to enable an accelerated disclosure of a control situation after a shift due to a deterioration of quality and on the other hand, decelerate an out of control situation after a shift due to a quality improvement. Furthermore, in comparison with Marcucci’s method, the new procedure provides an accurate and easier way to interpret several signals. In other words, the WSCC allows a faster detection of an out-of control situation in the case of a quality deterioration, however, an out-of control situation is not quickly detected in the case of a quality improvement. Indeed, comparative studies have been performed to find the best control chart for each combination. Concluding remarks with comments and recommendations are given based on Average Run Length (ARL) and standard deviation run length (SDRL).
Gestao e ProducaoEngineering-Industrial and Manufacturing Engineering
CiteScore
1.60
自引率
0.00%
发文量
23
审稿时长
44 weeks
期刊介绍:
Gestão & Produção is a journal published four times a year year (March, June, September and December) by the Departamento de Engenharia de Produção (DEP) of Universidade Federal de São Carlos (UFSCar). The first issue of Gestão & Produção was published in April, 1994. Actually, G&P was result of experience of professors of DEP/UFSCar in editing, in the beginning, "Cadernos DEP" in the 1980s, followed by "Cadernos de Engenharia de Produção". The last three issues of "Cadernos de Engenharia de Produção" were a test previous to the launch of Gestão & Produção because most of the journal characteristics were already established, like regularity.