Iara Franchi Arromba, R. Anholon, I. Rampasso, Dirceu Silva, O. Quelhas, L. A. Santa-Eulalia, W. Leal Filho
{"title":"实施全面生产维护(TPM)时观察到的困难:来自制造业的经验证据","authors":"Iara Franchi Arromba, R. Anholon, I. Rampasso, Dirceu Silva, O. Quelhas, L. A. Santa-Eulalia, W. Leal Filho","doi":"10.1590/1806-9649-2021v28e5300","DOIUrl":null,"url":null,"abstract":"Abstract: This article analyses the difficulties observed in adopting the Total Productive Maintenance (TPM) program in production systems. The research strategies used for this purpose consisted of a literature review, a panel of experts and a survey with professionals working in manufacturing companies. Altogether, 69 market professionals took part in the survey and the collected data was analyzed through the PLS-SEM technique. Results indicate that there is a causal relationship between difficulties associated with the planning phase of a TPM program and issues associated with its implementation. This is an original research and the results are valuable to business professionals desiring to properly implement TPM, as well for researchers interested in the mechanics of total productive maintenance system’s adoption.","PeriodicalId":35415,"journal":{"name":"Gestao e Producao","volume":"235 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sector\",\"authors\":\"Iara Franchi Arromba, R. Anholon, I. Rampasso, Dirceu Silva, O. Quelhas, L. A. Santa-Eulalia, W. Leal Filho\",\"doi\":\"10.1590/1806-9649-2021v28e5300\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract: This article analyses the difficulties observed in adopting the Total Productive Maintenance (TPM) program in production systems. The research strategies used for this purpose consisted of a literature review, a panel of experts and a survey with professionals working in manufacturing companies. Altogether, 69 market professionals took part in the survey and the collected data was analyzed through the PLS-SEM technique. Results indicate that there is a causal relationship between difficulties associated with the planning phase of a TPM program and issues associated with its implementation. This is an original research and the results are valuable to business professionals desiring to properly implement TPM, as well for researchers interested in the mechanics of total productive maintenance system’s adoption.\",\"PeriodicalId\":35415,\"journal\":{\"name\":\"Gestao e Producao\",\"volume\":\"235 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Gestao e Producao\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1590/1806-9649-2021v28e5300\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gestao e Producao","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1590/1806-9649-2021v28e5300","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sector
Abstract: This article analyses the difficulties observed in adopting the Total Productive Maintenance (TPM) program in production systems. The research strategies used for this purpose consisted of a literature review, a panel of experts and a survey with professionals working in manufacturing companies. Altogether, 69 market professionals took part in the survey and the collected data was analyzed through the PLS-SEM technique. Results indicate that there is a causal relationship between difficulties associated with the planning phase of a TPM program and issues associated with its implementation. This is an original research and the results are valuable to business professionals desiring to properly implement TPM, as well for researchers interested in the mechanics of total productive maintenance system’s adoption.
Gestao e ProducaoEngineering-Industrial and Manufacturing Engineering
CiteScore
1.60
自引率
0.00%
发文量
23
审稿时长
44 weeks
期刊介绍:
Gestão & Produção is a journal published four times a year year (March, June, September and December) by the Departamento de Engenharia de Produção (DEP) of Universidade Federal de São Carlos (UFSCar). The first issue of Gestão & Produção was published in April, 1994. Actually, G&P was result of experience of professors of DEP/UFSCar in editing, in the beginning, "Cadernos DEP" in the 1980s, followed by "Cadernos de Engenharia de Produção". The last three issues of "Cadernos de Engenharia de Produção" were a test previous to the launch of Gestão & Produção because most of the journal characteristics were already established, like regularity.