{"title":"使用人工智能估算整体桥梁的成本","authors":"S. Lakušić","doi":"10.14256/JCE.2831.2019","DOIUrl":null,"url":null,"abstract":"Estimation of costs is important in every phase of realisation of construction projects. However, the influence of cost estimation is the highest in early phases as it is then that the decision about accepting the job or withdrawing from the project is made. The quantity of data available in initial phases of the project is smaller compared to subsequent phases, which affects accuracy of cost estimation in such early phases. A research making use of artificial intelligence to estimate construction costs of integral road bridges is presented in the paper. The estimation model is prepared by means of neural networks. The best neural network model has proven to be highly accurate in the estimation of costs based on the mean absolute error, which amounts to 13.40 %.","PeriodicalId":50415,"journal":{"name":"Gradevinar","volume":"42 1","pages":"265-273"},"PeriodicalIF":1.0000,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Use of artificial intelligence for estimating cost of integral bridges\",\"authors\":\"S. Lakušić\",\"doi\":\"10.14256/JCE.2831.2019\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Estimation of costs is important in every phase of realisation of construction projects. However, the influence of cost estimation is the highest in early phases as it is then that the decision about accepting the job or withdrawing from the project is made. The quantity of data available in initial phases of the project is smaller compared to subsequent phases, which affects accuracy of cost estimation in such early phases. A research making use of artificial intelligence to estimate construction costs of integral road bridges is presented in the paper. The estimation model is prepared by means of neural networks. The best neural network model has proven to be highly accurate in the estimation of costs based on the mean absolute error, which amounts to 13.40 %.\",\"PeriodicalId\":50415,\"journal\":{\"name\":\"Gradevinar\",\"volume\":\"42 1\",\"pages\":\"265-273\"},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2021-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Gradevinar\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.14256/JCE.2831.2019\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gradevinar","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.14256/JCE.2831.2019","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

成本估算在建设项目实现的每个阶段都很重要。然而,成本估算的影响在早期阶段是最高的,因为这是关于接受工作或退出项目的决定。与后续阶段相比,项目初始阶段可用的数据量较少,这影响了早期阶段成本估算的准确性。提出了一种利用人工智能估算整体公路桥建设成本的方法。利用神经网络建立了估计模型。结果表明,最佳神经网络模型在基于平均绝对误差的成本估计方面具有较高的准确性,达到13.40%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Use of artificial intelligence for estimating cost of integral bridges
Estimation of costs is important in every phase of realisation of construction projects. However, the influence of cost estimation is the highest in early phases as it is then that the decision about accepting the job or withdrawing from the project is made. The quantity of data available in initial phases of the project is smaller compared to subsequent phases, which affects accuracy of cost estimation in such early phases. A research making use of artificial intelligence to estimate construction costs of integral road bridges is presented in the paper. The estimation model is prepared by means of neural networks. The best neural network model has proven to be highly accurate in the estimation of costs based on the mean absolute error, which amounts to 13.40 %.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Gradevinar
Gradevinar ENGINEERING, CIVIL-
CiteScore
1.70
自引率
18.20%
发文量
56
审稿时长
6-12 weeks
期刊介绍: Information not localized
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信