Li Cailin, Chao Wang, Junchao Li, Qiaoya Liu, Xiaoju Wu, Ping Yang
{"title":"基于函数的水库初始确定水位长期优化调度方法","authors":"Li Cailin, Chao Wang, Junchao Li, Qiaoya Liu, Xiaoju Wu, Ping Yang","doi":"10.1504/IJMSI.2015.075831","DOIUrl":null,"url":null,"abstract":"In this paper, a function-based scheduling method combining with statistical analysis of historical runoff data and inflow data is proposed to calculate the initial water level of a reservoir under long-term optimal operation. Two-ary interpolation function and database searching are integrated in the solving process. An example is taken to demonstrate the feasibility and engineering practicability of this method. Initial water level obtained by this method establishes a foundation for making optimal scheduling plans.","PeriodicalId":39035,"journal":{"name":"International Journal of Materials and Structural Integrity","volume":"9 1","pages":"254"},"PeriodicalIF":0.0000,"publicationDate":"2015-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1504/IJMSI.2015.075831","citationCount":"0","resultStr":"{\"title\":\"Function-based scheduling method on initial identified water level of reservoir long-term optimal scheduling\",\"authors\":\"Li Cailin, Chao Wang, Junchao Li, Qiaoya Liu, Xiaoju Wu, Ping Yang\",\"doi\":\"10.1504/IJMSI.2015.075831\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, a function-based scheduling method combining with statistical analysis of historical runoff data and inflow data is proposed to calculate the initial water level of a reservoir under long-term optimal operation. Two-ary interpolation function and database searching are integrated in the solving process. An example is taken to demonstrate the feasibility and engineering practicability of this method. Initial water level obtained by this method establishes a foundation for making optimal scheduling plans.\",\"PeriodicalId\":39035,\"journal\":{\"name\":\"International Journal of Materials and Structural Integrity\",\"volume\":\"9 1\",\"pages\":\"254\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1504/IJMSI.2015.075831\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Materials and Structural Integrity\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJMSI.2015.075831\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Materials and Structural Integrity","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJMSI.2015.075831","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
Function-based scheduling method on initial identified water level of reservoir long-term optimal scheduling
In this paper, a function-based scheduling method combining with statistical analysis of historical runoff data and inflow data is proposed to calculate the initial water level of a reservoir under long-term optimal operation. Two-ary interpolation function and database searching are integrated in the solving process. An example is taken to demonstrate the feasibility and engineering practicability of this method. Initial water level obtained by this method establishes a foundation for making optimal scheduling plans.