不同竞价块数对发电公司竞价策略的影响

Q1 Engineering
Lu Wang, F. Wen, C. Yu
{"title":"不同竞价块数对发电公司竞价策略的影响","authors":"Lu Wang, F. Wen, C. Yu","doi":"10.13335/J.1000-3673.PST.2006.19.006","DOIUrl":null,"url":null,"abstract":"In view of stepwise bidding protocol that is commonly adopted in practical operated electricity market home and abroad,the impacts of different numbers of bidding blocks on the bidding strategies of generation companies are investigated.As a preliminary research,here,the generation companies,which act as price-taker,are taken as subject investigated.Firstly,the electricity price in the market is simulated by probabilistic methods,on this basis and by use of average probability of wins a multi-block bidding model that simulate optimal bidding strategy of generation company is built.Then,the impacts of both generation company's risk preference extent and market information asymmetry on the construction of generation company's optimal bidding strategy are researched.Finally,a numerical example is used to demonstrate the proposed model and method,with special emphasis on the impacts of different numbers of bidding blocks on the optimal bidding strategy of generation companies.","PeriodicalId":20420,"journal":{"name":"电网技术","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2006-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impacts of different numbers of bidding blocks on generation companies’ bidding strategies\",\"authors\":\"Lu Wang, F. Wen, C. Yu\",\"doi\":\"10.13335/J.1000-3673.PST.2006.19.006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In view of stepwise bidding protocol that is commonly adopted in practical operated electricity market home and abroad,the impacts of different numbers of bidding blocks on the bidding strategies of generation companies are investigated.As a preliminary research,here,the generation companies,which act as price-taker,are taken as subject investigated.Firstly,the electricity price in the market is simulated by probabilistic methods,on this basis and by use of average probability of wins a multi-block bidding model that simulate optimal bidding strategy of generation company is built.Then,the impacts of both generation company's risk preference extent and market information asymmetry on the construction of generation company's optimal bidding strategy are researched.Finally,a numerical example is used to demonstrate the proposed model and method,with special emphasis on the impacts of different numbers of bidding blocks on the optimal bidding strategy of generation companies.\",\"PeriodicalId\":20420,\"journal\":{\"name\":\"电网技术\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"电网技术\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.13335/J.1000-3673.PST.2006.19.006\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"电网技术","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.13335/J.1000-3673.PST.2006.19.006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

针对国内外实际运行电力市场中普遍采用的分步竞价协议,研究了不同竞价区块数量对发电公司竞价策略的影响。作为初步研究,本文以作为电价承担者的发电公司为研究对象。首先,采用概率方法对市场电价进行模拟,在此基础上,利用平均中标概率建立了模拟发电公司最优竞价策略的多区块竞价模型。然后,研究了发电公司风险偏好程度和市场信息不对称对发电公司最优竞价策略构建的影响。最后,通过一个算例对所提出的模型和方法进行了验证,重点讨论了不同竞价块数量对发电公司最优竞价策略的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Impacts of different numbers of bidding blocks on generation companies’ bidding strategies
In view of stepwise bidding protocol that is commonly adopted in practical operated electricity market home and abroad,the impacts of different numbers of bidding blocks on the bidding strategies of generation companies are investigated.As a preliminary research,here,the generation companies,which act as price-taker,are taken as subject investigated.Firstly,the electricity price in the market is simulated by probabilistic methods,on this basis and by use of average probability of wins a multi-block bidding model that simulate optimal bidding strategy of generation company is built.Then,the impacts of both generation company's risk preference extent and market information asymmetry on the construction of generation company's optimal bidding strategy are researched.Finally,a numerical example is used to demonstrate the proposed model and method,with special emphasis on the impacts of different numbers of bidding blocks on the optimal bidding strategy of generation companies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
电网技术
电网技术 Engineering-Mechanical Engineering
CiteScore
7.30
自引率
0.00%
发文量
13735
期刊介绍: "Power System Technology" (monthly) was founded in 1957. It is a comprehensive academic journal in the field of energy and power, supervised and sponsored by the State Grid Corporation of China. It is published by the Power System Technology Magazine Co., Ltd. of the China Electric Power Research Institute. It is publicly distributed at home and abroad and is included in 12 famous domestic and foreign literature databases such as the Engineering Index (EI) and the National Chinese Core Journals. The purpose of "Power System Technology" is to serve the national innovation-driven development strategy, promote scientific and technological progress in my country's energy and power fields, and promote the application of new technologies and new products. "Power System Technology" has adhered to the publishing characteristics of combining "theoretical innovation with applied practice" for many years, and the scope of manuscript selection covers the fields of power generation, transmission, distribution, and electricity consumption.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信