基于模糊多准则决策方法的公私合作(PPP)项目风险评估与排序

IF 3.7 4区 管理学 Q2 OPERATIONS RESEARCH & MANAGEMENT SCIENCE
Ebrahim Jokar , Babak Aminnejad , Alireza Lork
{"title":"基于模糊多准则决策方法的公私合作(PPP)项目风险评估与排序","authors":"Ebrahim Jokar ,&nbsp;Babak Aminnejad ,&nbsp;Alireza Lork","doi":"10.1016/j.orp.2021.100190","DOIUrl":null,"url":null,"abstract":"<div><p>Public-private partnership (PPP)-based infrastructure projects generally face many risks and uncertainties at all stages of the project, including initial studies, design, construction, and operation. This causes many challenges such as increased costs, delays in the project and loss of materials and equipment, and so on. Given the need to use the PPP method in the development of infrastructure projects and its broad dimensions, it is important to accurately identify and evaluate the risks involved in these projects. In the present paper, the most important risks in these projects are identified by case study in PPP-based freeway projects in Iran and using the six step-by-step process of risk management based on PMBOK standard, a model for risk assessment it is developed. Also, for quantitative risk analysis, an attempt was made to determine the importance of risks and their priority in the studied projects by using fuzzy multi-criteria decision making techniques (FAHP and FTOPSIS). The results of quantitative risk analysis by FAHP method showed that first level risks in seven different categories including economic and financing risks, construction, operational, legal, political, other risks and government risks, respectively, have the greatest impact on PPP-based freeway projects. They are dedicated to themselves. Also, the results of the general ranking of the sub-criteria showed that high risk financing costs, quality of performance and standards, lack of support infrastructure have the greatest impact on these projects. Finally, the results of FTOPSIS similarity index showed that according to project experts, projects A (Isfahan-Shiraz Freeway), B (Salafchegan-Arak Freeway) and C (Khorramabad-Arak Freeway) with scores of 0.433, 0.3369 and 0.283, respectively, had a greater impact on risks, respectively. Also, the remaining risks that were jointly or at least one of the studied projects had a high impact were identified as final risks and were allocated among the various pillars of the project. The results of this research can be used as a management model in the process of risk assessment and management of PPP projects.</p></div>","PeriodicalId":38055,"journal":{"name":"Operations Research Perspectives","volume":"8 ","pages":"Article 100190"},"PeriodicalIF":3.7000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/j.orp.2021.100190","citationCount":"24","resultStr":"{\"title\":\"Assessing and Prioritizing Risks in Public-Private Partnership (PPP) Projects Using the Integration of Fuzzy Multi-Criteria Decision-Making Methods\",\"authors\":\"Ebrahim Jokar ,&nbsp;Babak Aminnejad ,&nbsp;Alireza Lork\",\"doi\":\"10.1016/j.orp.2021.100190\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Public-private partnership (PPP)-based infrastructure projects generally face many risks and uncertainties at all stages of the project, including initial studies, design, construction, and operation. This causes many challenges such as increased costs, delays in the project and loss of materials and equipment, and so on. Given the need to use the PPP method in the development of infrastructure projects and its broad dimensions, it is important to accurately identify and evaluate the risks involved in these projects. In the present paper, the most important risks in these projects are identified by case study in PPP-based freeway projects in Iran and using the six step-by-step process of risk management based on PMBOK standard, a model for risk assessment it is developed. Also, for quantitative risk analysis, an attempt was made to determine the importance of risks and their priority in the studied projects by using fuzzy multi-criteria decision making techniques (FAHP and FTOPSIS). The results of quantitative risk analysis by FAHP method showed that first level risks in seven different categories including economic and financing risks, construction, operational, legal, political, other risks and government risks, respectively, have the greatest impact on PPP-based freeway projects. They are dedicated to themselves. Also, the results of the general ranking of the sub-criteria showed that high risk financing costs, quality of performance and standards, lack of support infrastructure have the greatest impact on these projects. Finally, the results of FTOPSIS similarity index showed that according to project experts, projects A (Isfahan-Shiraz Freeway), B (Salafchegan-Arak Freeway) and C (Khorramabad-Arak Freeway) with scores of 0.433, 0.3369 and 0.283, respectively, had a greater impact on risks, respectively. Also, the remaining risks that were jointly or at least one of the studied projects had a high impact were identified as final risks and were allocated among the various pillars of the project. The results of this research can be used as a management model in the process of risk assessment and management of PPP projects.</p></div>\",\"PeriodicalId\":38055,\"journal\":{\"name\":\"Operations Research Perspectives\",\"volume\":\"8 \",\"pages\":\"Article 100190\"},\"PeriodicalIF\":3.7000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/j.orp.2021.100190\",\"citationCount\":\"24\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Operations Research Perspectives\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2214716021000130\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"OPERATIONS RESEARCH & MANAGEMENT SCIENCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Operations Research Perspectives","FirstCategoryId":"91","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2214716021000130","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 24

摘要

基于公私伙伴关系(PPP)的基础设施项目在项目的各个阶段(包括初始研究、设计、施工和运营)通常面临许多风险和不确定性。这导致了许多挑战,如成本增加,项目延误,材料和设备的损失,等等。鉴于在基础设施项目开发中需要使用PPP方法及其广泛的范围,准确识别和评估这些项目所涉及的风险非常重要。在本文中,通过对伊朗基于ppp的高速公路项目的案例研究,并使用基于PMBOK标准的风险管理的六个分步过程,确定了这些项目中最重要的风险,并开发了一个风险评估模型。此外,在定量风险分析方面,尝试采用模糊多准则决策技术(FAHP和FTOPSIS)确定风险在研究项目中的重要性及其优先级。采用FAHP方法进行定量风险分析结果表明,经济与融资风险、建设风险、运营风险、法律风险、政治风险、其他风险和政府风险等7个不同类别的一级风险对ppp高速公路项目的影响最大。他们专注于自己。此外,对分项标准的综合排名结果显示,高风险融资成本、绩效和标准质量、缺乏支持基础设施对这些项目的影响最大。最后,FTOPSIS相似指数结果显示,项目专家认为,项目A(伊斯法罕-设拉子高速公路)、项目B(萨拉夫切根-阿拉克高速公路)和项目C(霍拉马巴德-阿拉克高速公路)对风险的影响分别较大,得分分别为0.433、0.3369和0.283。此外,联合或至少一个研究项目具有高影响的剩余风险被确定为最终风险,并在项目的各个支柱之间进行分配。研究结果可作为PPP项目风险评估与管理过程中的管理模式。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessing and Prioritizing Risks in Public-Private Partnership (PPP) Projects Using the Integration of Fuzzy Multi-Criteria Decision-Making Methods

Public-private partnership (PPP)-based infrastructure projects generally face many risks and uncertainties at all stages of the project, including initial studies, design, construction, and operation. This causes many challenges such as increased costs, delays in the project and loss of materials and equipment, and so on. Given the need to use the PPP method in the development of infrastructure projects and its broad dimensions, it is important to accurately identify and evaluate the risks involved in these projects. In the present paper, the most important risks in these projects are identified by case study in PPP-based freeway projects in Iran and using the six step-by-step process of risk management based on PMBOK standard, a model for risk assessment it is developed. Also, for quantitative risk analysis, an attempt was made to determine the importance of risks and their priority in the studied projects by using fuzzy multi-criteria decision making techniques (FAHP and FTOPSIS). The results of quantitative risk analysis by FAHP method showed that first level risks in seven different categories including economic and financing risks, construction, operational, legal, political, other risks and government risks, respectively, have the greatest impact on PPP-based freeway projects. They are dedicated to themselves. Also, the results of the general ranking of the sub-criteria showed that high risk financing costs, quality of performance and standards, lack of support infrastructure have the greatest impact on these projects. Finally, the results of FTOPSIS similarity index showed that according to project experts, projects A (Isfahan-Shiraz Freeway), B (Salafchegan-Arak Freeway) and C (Khorramabad-Arak Freeway) with scores of 0.433, 0.3369 and 0.283, respectively, had a greater impact on risks, respectively. Also, the remaining risks that were jointly or at least one of the studied projects had a high impact were identified as final risks and were allocated among the various pillars of the project. The results of this research can be used as a management model in the process of risk assessment and management of PPP projects.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Operations Research Perspectives
Operations Research Perspectives Mathematics-Statistics and Probability
CiteScore
6.40
自引率
0.00%
发文量
36
审稿时长
27 days
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信