考虑中压配电网最小损耗重构中的安全问题

A. Campoccia, E. R. Sanseverino, G. Zizzo
{"title":"考虑中压配电网最小损耗重构中的安全问题","authors":"A. Campoccia, E. R. Sanseverino, G. Zizzo","doi":"10.1002/ETEP.244","DOIUrl":null,"url":null,"abstract":"This paper offers a new perspective over the traditional problem of the multiobjective optimal reconfiguration of electrical distribution systems in regular working state. The issue is indeed here formulated including also safety issues. Indeed, dimensioning the earth electrodes of their own secondary substations, distribution companies take into account the probable future configurations of the network due to transformations of overhead lines into cable lines or realization of new lines. On the contrary, they do not consider that, during normal working conditions, the structure of the network can be modified for long periods as a consequence of reconfiguration manoeuvres, with differences between the design current of the earthing systems and the fault current in certain substations significant. As a consequence, often distribution companies limit the implementation of the optimal reconfiguration layouts because they are unable to suitably evaluate the safety issue. In the paper, the problem is formulated including a further objective in order to account for the safety. A suitable constrained multiobjective formulation of the reconfiguration problem is therefore used aiming at: the minimal power losses operation, the verification of safety at distribution substations, the load balancing among the HV/MV transformers while keeping the voltage profile regular. The application carried out uses an NSGA-II algorithm whose performance is compared to that of a fuzzy logic-based multiobjective evolutionary algorithm. In the considered automated network, the remote control of tie-switches is possible and their layout is the optimization variable. After a brief description of the optimal reconfiguration problem for automated distribution networks, the most recent papers on the topic are reported and commented. Then the problem formulation and the solution algorithm are described in detail. Finally, test results on a large MV distribution network are reported and discussed. Copyright © 2008 John Wiley & Sons, Ltd.","PeriodicalId":50474,"journal":{"name":"European Transactions on Electrical Power","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1002/ETEP.244","citationCount":"10","resultStr":"{\"title\":\"Considering safety issues in minimum losses reconfiguration for MV distribution networks\",\"authors\":\"A. Campoccia, E. R. Sanseverino, G. Zizzo\",\"doi\":\"10.1002/ETEP.244\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper offers a new perspective over the traditional problem of the multiobjective optimal reconfiguration of electrical distribution systems in regular working state. The issue is indeed here formulated including also safety issues. Indeed, dimensioning the earth electrodes of their own secondary substations, distribution companies take into account the probable future configurations of the network due to transformations of overhead lines into cable lines or realization of new lines. On the contrary, they do not consider that, during normal working conditions, the structure of the network can be modified for long periods as a consequence of reconfiguration manoeuvres, with differences between the design current of the earthing systems and the fault current in certain substations significant. As a consequence, often distribution companies limit the implementation of the optimal reconfiguration layouts because they are unable to suitably evaluate the safety issue. In the paper, the problem is formulated including a further objective in order to account for the safety. A suitable constrained multiobjective formulation of the reconfiguration problem is therefore used aiming at: the minimal power losses operation, the verification of safety at distribution substations, the load balancing among the HV/MV transformers while keeping the voltage profile regular. The application carried out uses an NSGA-II algorithm whose performance is compared to that of a fuzzy logic-based multiobjective evolutionary algorithm. In the considered automated network, the remote control of tie-switches is possible and their layout is the optimization variable. After a brief description of the optimal reconfiguration problem for automated distribution networks, the most recent papers on the topic are reported and commented. Then the problem formulation and the solution algorithm are described in detail. Finally, test results on a large MV distribution network are reported and discussed. Copyright © 2008 John Wiley & Sons, Ltd.\",\"PeriodicalId\":50474,\"journal\":{\"name\":\"European Transactions on Electrical Power\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1002/ETEP.244\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Transactions on Electrical Power\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/ETEP.244\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Transactions on Electrical Power","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/ETEP.244","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

摘要

本文对传统的配电系统在正常工作状态下的多目标优化配置问题提供了一个新的视角。这里的问题包括安全问题。事实上,配电公司在为自己的二次变电站的接地电极制定尺寸时,考虑到由于架空线路转换为电缆线路或实现新线路而可能出现的未来网络配置。相反,他们没有考虑到,在正常工作条件下,由于重新配置操作,接地系统的设计电流与某些变电站的故障电流之间的差异很大,因此网络的结构可以长期修改。因此,分销公司往往因为无法适当地评估安全问题而限制了最优重新配置布局的实施。在本文中,问题的制定包括一个进一步的目标,以说明安全。因此,采用了一种合适的约束多目标重构问题的表述,主要针对:运行损耗最小、变电站安全验证、高压/中压变压器之间的负载均衡以及保持电压分布规律。该应用使用了NSGA-II算法,并将其性能与基于模糊逻辑的多目标进化算法进行了比较。在考虑的自动化网络中,连接开关的远程控制是可能的,其布局是优化变量。在简要介绍了自动化配电网的最优重构问题之后,对这一主题的最新论文进行了报道和评论。然后详细描述了问题的表述和求解算法。最后,对大型中压配电网的测试结果进行了报道和讨论。版权所有©2008 John Wiley & Sons, Ltd
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Considering safety issues in minimum losses reconfiguration for MV distribution networks
This paper offers a new perspective over the traditional problem of the multiobjective optimal reconfiguration of electrical distribution systems in regular working state. The issue is indeed here formulated including also safety issues. Indeed, dimensioning the earth electrodes of their own secondary substations, distribution companies take into account the probable future configurations of the network due to transformations of overhead lines into cable lines or realization of new lines. On the contrary, they do not consider that, during normal working conditions, the structure of the network can be modified for long periods as a consequence of reconfiguration manoeuvres, with differences between the design current of the earthing systems and the fault current in certain substations significant. As a consequence, often distribution companies limit the implementation of the optimal reconfiguration layouts because they are unable to suitably evaluate the safety issue. In the paper, the problem is formulated including a further objective in order to account for the safety. A suitable constrained multiobjective formulation of the reconfiguration problem is therefore used aiming at: the minimal power losses operation, the verification of safety at distribution substations, the load balancing among the HV/MV transformers while keeping the voltage profile regular. The application carried out uses an NSGA-II algorithm whose performance is compared to that of a fuzzy logic-based multiobjective evolutionary algorithm. In the considered automated network, the remote control of tie-switches is possible and their layout is the optimization variable. After a brief description of the optimal reconfiguration problem for automated distribution networks, the most recent papers on the topic are reported and commented. Then the problem formulation and the solution algorithm are described in detail. Finally, test results on a large MV distribution network are reported and discussed. Copyright © 2008 John Wiley & Sons, Ltd.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
European Transactions on Electrical Power
European Transactions on Electrical Power 工程技术-工程:电子与电气
自引率
0.00%
发文量
0
审稿时长
5.4 months
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信