{"title":"越南建筑安装作业质量控制体系的目标","authors":"T. Nguyen, A. Yudina","doi":"10.23968/2500-0055-2019-4-2-27-32","DOIUrl":null,"url":null,"abstract":"Introduction: The quality control system for construction and installation operations pursues six objectives: completion on time; completion on budget; compliance with the design documents, codes, and standards; safe operations; improvement of skills and experience; environment protection. Purpose of the study: To evaluate reliability of the objectives, correlation between them, and ranking of their priorities within the quality control system for construction and installation operations in Vietnam. Methods: The objectives were evaluated by means of a questionnaire survey conducted in Vietnam, using a five-level scale, based on the reliability coefficient α, correlation coefficient r and mean value М. The sample size was 184. Results: According to the results of the questionnaire survey conducted in Vietnam, homogeneity and correlation between the following objectives was observed: compliance with the design documents, codes, and standards; safe operations; improvement of skills and experience; completion on time; completion on budget; environment protection. The objectives were ranked between two groups of respondents by their experience and roles based on the sample size.","PeriodicalId":52295,"journal":{"name":"Architecture and Engineering","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"OBJECTIVES OF THE QUALITY CONTROL SYSTEM FOR CONSTRUCTION AND INSTALLATION OPERATIONS IN VIETNAM\",\"authors\":\"T. Nguyen, A. Yudina\",\"doi\":\"10.23968/2500-0055-2019-4-2-27-32\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Introduction: The quality control system for construction and installation operations pursues six objectives: completion on time; completion on budget; compliance with the design documents, codes, and standards; safe operations; improvement of skills and experience; environment protection. Purpose of the study: To evaluate reliability of the objectives, correlation between them, and ranking of their priorities within the quality control system for construction and installation operations in Vietnam. Methods: The objectives were evaluated by means of a questionnaire survey conducted in Vietnam, using a five-level scale, based on the reliability coefficient α, correlation coefficient r and mean value М. The sample size was 184. Results: According to the results of the questionnaire survey conducted in Vietnam, homogeneity and correlation between the following objectives was observed: compliance with the design documents, codes, and standards; safe operations; improvement of skills and experience; completion on time; completion on budget; environment protection. The objectives were ranked between two groups of respondents by their experience and roles based on the sample size.\",\"PeriodicalId\":52295,\"journal\":{\"name\":\"Architecture and Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Architecture and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23968/2500-0055-2019-4-2-27-32\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Architecture and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23968/2500-0055-2019-4-2-27-32","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
OBJECTIVES OF THE QUALITY CONTROL SYSTEM FOR CONSTRUCTION AND INSTALLATION OPERATIONS IN VIETNAM
Introduction: The quality control system for construction and installation operations pursues six objectives: completion on time; completion on budget; compliance with the design documents, codes, and standards; safe operations; improvement of skills and experience; environment protection. Purpose of the study: To evaluate reliability of the objectives, correlation between them, and ranking of their priorities within the quality control system for construction and installation operations in Vietnam. Methods: The objectives were evaluated by means of a questionnaire survey conducted in Vietnam, using a five-level scale, based on the reliability coefficient α, correlation coefficient r and mean value М. The sample size was 184. Results: According to the results of the questionnaire survey conducted in Vietnam, homogeneity and correlation between the following objectives was observed: compliance with the design documents, codes, and standards; safe operations; improvement of skills and experience; completion on time; completion on budget; environment protection. The objectives were ranked between two groups of respondents by their experience and roles based on the sample size.