伊朗石油和天然气建筑业的风险评估:一种过程方法

IF 2.7 Q2 MANAGEMENT
H. Sohrabi, E. Noorzai
{"title":"伊朗石油和天然气建筑业的风险评估:一种过程方法","authors":"H. Sohrabi, E. Noorzai","doi":"10.1108/ijqrm-03-2021-0069","DOIUrl":null,"url":null,"abstract":"PurposeSuccessful risk management is influential in different phases of construction projects. It can play a critical role in reducing the possibility of claims as well as related disputes. The risk management knowledge area in large capital projects such as oil and gas is considered a questionable problem in the construction industry. The present study makes an effort to identify the importance of process groups in improving risk management performance.Design/methodology/approachThis study is selected and ranked 36 factors leading to the claim in Iran's oil and gas industry through the Delphi method and a questionnaire. Factors categorized into a risk breakdown structure (RBS) include eight groups. Factors are linked to one of the process groups by a Delphi method. Finally, the relationship between RBS and the five process groups is analyzed using partial least squares structural equation modeling (PLS-SEM).FindingsFindings showed that the planning process group had more confirmed factors than others. Most of the supported communications belonged to the contractor and the owner parties. Also, the cause of delay in the implementation phase due to the contractor performance had a higher relative importance index.Originality/valueThis article, from a project life-cycle perspective, considers the new structure between the risks leading to claims and the key parties to the project. It can be a good criterion for identifying risks and a timelier response to them before the risks turn into disagreements.","PeriodicalId":14193,"journal":{"name":"International Journal of Quality & Reliability Management","volume":" ","pages":""},"PeriodicalIF":2.7000,"publicationDate":"2021-11-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Risk assessment in Iranian oil and gas construction industry: a process approach\",\"authors\":\"H. Sohrabi, E. Noorzai\",\"doi\":\"10.1108/ijqrm-03-2021-0069\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeSuccessful risk management is influential in different phases of construction projects. It can play a critical role in reducing the possibility of claims as well as related disputes. The risk management knowledge area in large capital projects such as oil and gas is considered a questionable problem in the construction industry. The present study makes an effort to identify the importance of process groups in improving risk management performance.Design/methodology/approachThis study is selected and ranked 36 factors leading to the claim in Iran's oil and gas industry through the Delphi method and a questionnaire. Factors categorized into a risk breakdown structure (RBS) include eight groups. Factors are linked to one of the process groups by a Delphi method. Finally, the relationship between RBS and the five process groups is analyzed using partial least squares structural equation modeling (PLS-SEM).FindingsFindings showed that the planning process group had more confirmed factors than others. Most of the supported communications belonged to the contractor and the owner parties. Also, the cause of delay in the implementation phase due to the contractor performance had a higher relative importance index.Originality/valueThis article, from a project life-cycle perspective, considers the new structure between the risks leading to claims and the key parties to the project. It can be a good criterion for identifying risks and a timelier response to them before the risks turn into disagreements.\",\"PeriodicalId\":14193,\"journal\":{\"name\":\"International Journal of Quality & Reliability Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.7000,\"publicationDate\":\"2021-11-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Quality & Reliability Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/ijqrm-03-2021-0069\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Quality & Reliability Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ijqrm-03-2021-0069","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 3

摘要

目的成功的风险管理在建设项目的不同阶段都有影响。它可以在减少索赔和相关纠纷的可能性方面发挥关键作用。石油和天然气等大型资本项目的风险管理知识领域被认为是建筑业的一个值得怀疑的问题。本研究致力于确定流程组在提高风险管理绩效方面的重要性。设计/方法论/方法本研究通过德尔菲法和问卷调查,对导致伊朗石油和天然气行业索赔的36个因素进行了选择和排名。风险分解结构(RBS)中的因素包括八组。通过德尔菲方法将因素与其中一个过程组相关联。最后,利用偏最小二乘结构方程模型(PLS-SEM)分析了RBS与五个工艺组之间的关系。结果表明,规划工艺组比其他工艺组有更多的确定因素。大多数支持的通信属于承包商和业主双方。此外,由于承包商的业绩导致实施阶段延迟的原因具有较高的相对重要性指数。独创性/价值本文从项目生命周期的角度出发,考虑了导致索赔的风险与项目关键方之间的新结构。它可以成为识别风险的一个很好的标准,并在风险转化为分歧之前及时做出反应。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Risk assessment in Iranian oil and gas construction industry: a process approach
PurposeSuccessful risk management is influential in different phases of construction projects. It can play a critical role in reducing the possibility of claims as well as related disputes. The risk management knowledge area in large capital projects such as oil and gas is considered a questionable problem in the construction industry. The present study makes an effort to identify the importance of process groups in improving risk management performance.Design/methodology/approachThis study is selected and ranked 36 factors leading to the claim in Iran's oil and gas industry through the Delphi method and a questionnaire. Factors categorized into a risk breakdown structure (RBS) include eight groups. Factors are linked to one of the process groups by a Delphi method. Finally, the relationship between RBS and the five process groups is analyzed using partial least squares structural equation modeling (PLS-SEM).FindingsFindings showed that the planning process group had more confirmed factors than others. Most of the supported communications belonged to the contractor and the owner parties. Also, the cause of delay in the implementation phase due to the contractor performance had a higher relative importance index.Originality/valueThis article, from a project life-cycle perspective, considers the new structure between the risks leading to claims and the key parties to the project. It can be a good criterion for identifying risks and a timelier response to them before the risks turn into disagreements.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.60
自引率
12.00%
发文量
53
期刊介绍: In today''s competitive business and industrial environment, it is essential to have an academic journal offering the most current theoretical knowledge on quality and reliability to ensure that top management is fully conversant with new thinking, techniques and developments in the field. The International Journal of Quality & Reliability Management (IJQRM) deals with all aspects of business improvements and with all aspects of manufacturing and services, from the training of (senior) managers, to innovations in organising and processing to raise standards of product and service quality. It is this unique blend of theoretical knowledge and managerial relevance that makes IJQRM a valuable resource for managers striving for higher standards.Coverage includes: -Reliability, availability & maintenance -Gauging, calibration & measurement -Life cycle costing & sustainability -Reliability Management of Systems -Service Quality -Green Marketing -Product liability -Product testing techniques & systems -Quality function deployment -Reliability & quality education & training -Productivity improvement -Performance improvement -(Regulatory) standards for quality & Quality Awards -Statistical process control -System modelling -Teamwork -Quality data & datamining
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信