用于道路建设和运营的业务流程管理

Q1 Engineering
V. Shamraeva, E. Savinov
{"title":"用于道路建设和运营的业务流程管理","authors":"V. Shamraeva, E. Savinov","doi":"10.23968/2500-0055-2021-6-3-19-28","DOIUrl":null,"url":null,"abstract":"Introduction: The article addresses the business processes of the construction and operation of linear road sections. In the course of the study, we analyzed the geographic information system (GIS) of Avtodor company (developer: Indor-Soft, Tomsk) and its use in the operation and maintenance of transport infrastructure facilities at such road sections. In particular, we studied the construction of the Far West Krasnodar Bypass (FWKB), which is part of the North-South transport corridor, and its implementation by means of InfraBIM modeling. Purpose of the study: We aimed to describe the structured GIS database of Avtodor company by connecting various InfraBIM tools for the purposes of data generation and road model update. Methods: Analyzing the GIS of Avtodor company when using an InfraBIM model of road infrastructure, we studied the following: use of GIS features at the facility; asynchronous editing and selection of data without access to the Internet; database update. Results: InfraBIM models of linear road sections, developed in the implementation of such projects as the FWKB, make it possible to optimize time and save money when planning and introducing measures during the operation of transport infrastructure facilities.","PeriodicalId":52295,"journal":{"name":"Architecture and Engineering","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-09-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"INFRA-BIM FOR BUSINESS PROCESSES’ MANAGEMENT IN ROAD CONSTRUCTION AND OPERATION\",\"authors\":\"V. Shamraeva, E. Savinov\",\"doi\":\"10.23968/2500-0055-2021-6-3-19-28\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Introduction: The article addresses the business processes of the construction and operation of linear road sections. In the course of the study, we analyzed the geographic information system (GIS) of Avtodor company (developer: Indor-Soft, Tomsk) and its use in the operation and maintenance of transport infrastructure facilities at such road sections. In particular, we studied the construction of the Far West Krasnodar Bypass (FWKB), which is part of the North-South transport corridor, and its implementation by means of InfraBIM modeling. Purpose of the study: We aimed to describe the structured GIS database of Avtodor company by connecting various InfraBIM tools for the purposes of data generation and road model update. Methods: Analyzing the GIS of Avtodor company when using an InfraBIM model of road infrastructure, we studied the following: use of GIS features at the facility; asynchronous editing and selection of data without access to the Internet; database update. Results: InfraBIM models of linear road sections, developed in the implementation of such projects as the FWKB, make it possible to optimize time and save money when planning and introducing measures during the operation of transport infrastructure facilities.\",\"PeriodicalId\":52295,\"journal\":{\"name\":\"Architecture and Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Architecture and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23968/2500-0055-2021-6-3-19-28\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Architecture and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23968/2500-0055-2021-6-3-19-28","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 1

摘要

引言:本文介绍了直线路段的建设和运营的业务流程。在研究过程中,我们分析了Avtodor公司(开发商:Indor Soft,Tomsk)的地理信息系统(GIS)及其在此类路段交通基础设施运营和维护中的使用。特别是,我们研究了作为南北交通走廊一部分的远西克拉斯诺达尔绕道(FWKB)的建设及其通过InfraBIM建模的实施。研究目的:我们旨在通过连接各种InfraBIM工具来描述Avtodor公司的结构化GIS数据库,用于数据生成和道路模型更新。方法:分析Avtodor公司在使用InfraBIM道路基础设施模型时的GIS,研究了以下内容:GIS特征在设施中的使用;在不接入互联网的情况下对数据进行异步编辑和选择;数据库更新。结果:在FWKB等项目的实施过程中开发的线性路段的InfraBIM模型,可以在交通基础设施运营期间规划和引入措施时优化时间并节省资金。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
INFRA-BIM FOR BUSINESS PROCESSES’ MANAGEMENT IN ROAD CONSTRUCTION AND OPERATION
Introduction: The article addresses the business processes of the construction and operation of linear road sections. In the course of the study, we analyzed the geographic information system (GIS) of Avtodor company (developer: Indor-Soft, Tomsk) and its use in the operation and maintenance of transport infrastructure facilities at such road sections. In particular, we studied the construction of the Far West Krasnodar Bypass (FWKB), which is part of the North-South transport corridor, and its implementation by means of InfraBIM modeling. Purpose of the study: We aimed to describe the structured GIS database of Avtodor company by connecting various InfraBIM tools for the purposes of data generation and road model update. Methods: Analyzing the GIS of Avtodor company when using an InfraBIM model of road infrastructure, we studied the following: use of GIS features at the facility; asynchronous editing and selection of data without access to the Internet; database update. Results: InfraBIM models of linear road sections, developed in the implementation of such projects as the FWKB, make it possible to optimize time and save money when planning and introducing measures during the operation of transport infrastructure facilities.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Architecture and Engineering
Architecture and Engineering Engineering-Architecture
CiteScore
1.80
自引率
0.00%
发文量
26
审稿时长
7 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信