加拿大环境影响评估中缺乏对生态连通性的考虑:目前的做法和改进的必要性

IF 1.8 4区 社会学 Q3 ENVIRONMENTAL STUDIES
Charla Patterson, Felipe Casasanta Mostaço, Jochen A. G. Jaeger
{"title":"加拿大环境影响评估中缺乏对生态连通性的考虑:目前的做法和改进的必要性","authors":"Charla Patterson, Felipe Casasanta Mostaço, Jochen A. G. Jaeger","doi":"10.1080/14615517.2022.2135232","DOIUrl":null,"url":null,"abstract":"ABSTRACT This study seeks to understand the extent to which ecological connectivity has been considered in EIA in Canada. Several factors that may influence the consideration of connectivity were analyzed in an evaluation of 14 environmental impact statements (EIS) obtained from the Canadian Impact Assessment Registry. Connectivity is largely absent from the EIA process, and even projects that attempted to consider connectivity lacked the rigor required to effectively assess impacts on connectivity. Projects that included connectivity as a valued component performed somewhat better, whereas the assessment of connectivity was not affected by different federal environmental acts (CEAA 1992 vs. CEAA 2012), development sectors, or proponent types. Between sections of the EIS, a significantly greater number of evaluation criteria were met in the scoping section compared to all other sections. Without adequate guidance, connectivity analysis in EIA has been conducted ad hoc, with considerable variation in quality. Including connectivity consideration in EIA legislation would provide a legal framework to address the lack of policies, standards, and assessment guidelines. We provide recommendations for integrating connectivity in EIA in Canada and elsewhere.","PeriodicalId":47528,"journal":{"name":"Impact Assessment and Project Appraisal","volume":"40 1","pages":"481 - 494"},"PeriodicalIF":1.8000,"publicationDate":"2022-11-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Lack of consideration of ecological connectivity in Canadian environmental impact assessment: Current practice and need for improvement\",\"authors\":\"Charla Patterson, Felipe Casasanta Mostaço, Jochen A. G. Jaeger\",\"doi\":\"10.1080/14615517.2022.2135232\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT This study seeks to understand the extent to which ecological connectivity has been considered in EIA in Canada. Several factors that may influence the consideration of connectivity were analyzed in an evaluation of 14 environmental impact statements (EIS) obtained from the Canadian Impact Assessment Registry. Connectivity is largely absent from the EIA process, and even projects that attempted to consider connectivity lacked the rigor required to effectively assess impacts on connectivity. Projects that included connectivity as a valued component performed somewhat better, whereas the assessment of connectivity was not affected by different federal environmental acts (CEAA 1992 vs. CEAA 2012), development sectors, or proponent types. Between sections of the EIS, a significantly greater number of evaluation criteria were met in the scoping section compared to all other sections. Without adequate guidance, connectivity analysis in EIA has been conducted ad hoc, with considerable variation in quality. Including connectivity consideration in EIA legislation would provide a legal framework to address the lack of policies, standards, and assessment guidelines. We provide recommendations for integrating connectivity in EIA in Canada and elsewhere.\",\"PeriodicalId\":47528,\"journal\":{\"name\":\"Impact Assessment and Project Appraisal\",\"volume\":\"40 1\",\"pages\":\"481 - 494\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2022-11-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Impact Assessment and Project Appraisal\",\"FirstCategoryId\":\"90\",\"ListUrlMain\":\"https://doi.org/10.1080/14615517.2022.2135232\",\"RegionNum\":4,\"RegionCategory\":\"社会学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENVIRONMENTAL STUDIES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Impact Assessment and Project Appraisal","FirstCategoryId":"90","ListUrlMain":"https://doi.org/10.1080/14615517.2022.2135232","RegionNum":4,"RegionCategory":"社会学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENVIRONMENTAL STUDIES","Score":null,"Total":0}
引用次数: 4

摘要

本研究旨在了解加拿大环境影响评估中生态连通性的考虑程度。在对从加拿大影响评估登记处获得的14份环境影响报告(EIS)进行评估时,分析了可能影响连通性考虑的几个因素。连通性在环评过程中基本上是缺席的,即使是试图考虑连通性的项目,也缺乏有效评估连通性影响所需的严谨性。将连通性作为一个有价值的组成部分的项目表现得更好,而连通性的评估不受不同的联邦环境法案(1992年的CEAA与2012年的CEAA)、开发部门或支持者类型的影响。在《环境影响报告书》的各部分之间,与所有其他部分相比,范围界定部分符合的评估标准数量明显更多。由于缺乏足够的指导,环评中的连通性分析是临时进行的,质量参差不齐。将连通性考虑纳入环评立法将为解决政策、标准和评估指南的缺乏提供法律框架。我们为在加拿大和其他地方整合环境影响评估中的连通性提供了建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Lack of consideration of ecological connectivity in Canadian environmental impact assessment: Current practice and need for improvement
ABSTRACT This study seeks to understand the extent to which ecological connectivity has been considered in EIA in Canada. Several factors that may influence the consideration of connectivity were analyzed in an evaluation of 14 environmental impact statements (EIS) obtained from the Canadian Impact Assessment Registry. Connectivity is largely absent from the EIA process, and even projects that attempted to consider connectivity lacked the rigor required to effectively assess impacts on connectivity. Projects that included connectivity as a valued component performed somewhat better, whereas the assessment of connectivity was not affected by different federal environmental acts (CEAA 1992 vs. CEAA 2012), development sectors, or proponent types. Between sections of the EIS, a significantly greater number of evaluation criteria were met in the scoping section compared to all other sections. Without adequate guidance, connectivity analysis in EIA has been conducted ad hoc, with considerable variation in quality. Including connectivity consideration in EIA legislation would provide a legal framework to address the lack of policies, standards, and assessment guidelines. We provide recommendations for integrating connectivity in EIA in Canada and elsewhere.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.60
自引率
22.70%
发文量
52
期刊介绍: This is the international, peer-reviewed journal of the International Association for Impact Assessment (IAIA). It covers environmental, social, health and other impact assessments, cost-benefit analysis, technology assessment, and other approaches to anticipating and managing impacts. It has readers in universities, government and public agencies, consultancies, NGOs and elsewhere in over 100 countries. It has editorials, main articles, book reviews, and a professional practice section.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信