家用电器(COSH电机)生产过程中乘客电机变化的真菌分析

Siti Rochmaniyah
{"title":"家用电器(COSH电机)生产过程中乘客电机变化的真菌分析","authors":"Siti Rochmaniyah","doi":"10.22219/JMB.V7I1.6899","DOIUrl":null,"url":null,"abstract":"The research objective was to overcome the problem of wastage of time in the production processed by planning the mapping function of time for workers andowners of home industry for the production processed to avoid waste of time andreduce the damage.The analytical tool used was a function mapping the basis forknowing which processes were causing wastage of time. The analysis shows the mapping function of time base production processed itcan be seen, there were four processed were experiencing wastage of time that wascontrolling the processed, waiting for turning, waiting for staining, and warehouse,with two factors, namely the engine and human issues. Of the two factors, theproblem may be known solution was to increase the machine and provide training toemployees to avoid errors in the production processed. In addition to the mappingfunction target time in order to indicate whether the implemented solution hadprovided an increase in the production processed and the company's operations canbe run effectively and efficiently.","PeriodicalId":33544,"journal":{"name":"Manajemen Bisnis","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISIS PEMETAAN FUNGSI WAKTU PRODUKSI PADA HOME INDUSTRI (COSH MOTOR) JASA PEMBUATAN ONDERDIL MOTOR DI PASURUAN\",\"authors\":\"Siti Rochmaniyah\",\"doi\":\"10.22219/JMB.V7I1.6899\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The research objective was to overcome the problem of wastage of time in the production processed by planning the mapping function of time for workers andowners of home industry for the production processed to avoid waste of time andreduce the damage.The analytical tool used was a function mapping the basis forknowing which processes were causing wastage of time. The analysis shows the mapping function of time base production processed itcan be seen, there were four processed were experiencing wastage of time that wascontrolling the processed, waiting for turning, waiting for staining, and warehouse,with two factors, namely the engine and human issues. Of the two factors, theproblem may be known solution was to increase the machine and provide training toemployees to avoid errors in the production processed. In addition to the mappingfunction target time in order to indicate whether the implemented solution hadprovided an increase in the production processed and the company's operations canbe run effectively and efficiently.\",\"PeriodicalId\":33544,\"journal\":{\"name\":\"Manajemen Bisnis\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Manajemen Bisnis\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22219/JMB.V7I1.6899\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Manajemen Bisnis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22219/JMB.V7I1.6899","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是通过规划家庭工业工人和业主在生产过程中的时间映射函数来克服生产过程中浪费时间的问题,以避免浪费时间并减少损失。所使用的分析工具是一个函数,它映射了哪些过程导致时间浪费的基础分叉。分析表明,加工时间库的映射函数可以看出,有四个加工过程经历了时间浪费,即控制加工、等待车削、等待染色和仓库,有两个因素,即发动机和人员问题。在这两个因素中,问题可能是已知的解决方案是增加机器并为员工提供培训,以避免生产过程中的错误。除了映射功能的目标时间之外,还可以指示所实施的解决方案是否增加了处理的产量,以及公司的运营是否能够有效和高效地运行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS PEMETAAN FUNGSI WAKTU PRODUKSI PADA HOME INDUSTRI (COSH MOTOR) JASA PEMBUATAN ONDERDIL MOTOR DI PASURUAN
The research objective was to overcome the problem of wastage of time in the production processed by planning the mapping function of time for workers andowners of home industry for the production processed to avoid waste of time andreduce the damage.The analytical tool used was a function mapping the basis forknowing which processes were causing wastage of time. The analysis shows the mapping function of time base production processed itcan be seen, there were four processed were experiencing wastage of time that wascontrolling the processed, waiting for turning, waiting for staining, and warehouse,with two factors, namely the engine and human issues. Of the two factors, theproblem may be known solution was to increase the machine and provide training toemployees to avoid errors in the production processed. In addition to the mappingfunction target time in order to indicate whether the implemented solution hadprovided an increase in the production processed and the company's operations canbe run effectively and efficiently.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信