{"title":"用于建筑项目生产控制的控制面板和指示器","authors":"P. Orihuela, Santiago Pacheco, J. Orihuela","doi":"10.1515/otmcj-2016-0027","DOIUrl":null,"url":null,"abstract":"Abstract In general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper submitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1665 - 1673"},"PeriodicalIF":1.6000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Control panel and indicators for production control in building projects\",\"authors\":\"P. Orihuela, Santiago Pacheco, J. Orihuela\",\"doi\":\"10.1515/otmcj-2016-0027\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract In general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper submitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"10 1\",\"pages\":\"1665 - 1673\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2018-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/otmcj-2016-0027\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/otmcj-2016-0027","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

摘要

一般来说,每个项目都应该有指标来监控是否符合既定目标。在建设项目中,许多研究者提出了大量的指标;然而,对现状的分析表明,结果、过程和领先指标之间经常存在混淆。本文是同一作者在2017年创意建筑会议上提交的论文的扩展版本,并发表在procdia Engineering (DOI: 10.1016/j.p proeng.2017.07.230)上,提出了住房项目设计、供应和组装阶段的这三种指标的建议。因此,所有的项目干系人都可以有一个控制面板,如果指标超过了限制,就可以进行监控,从而允许及时有效地采取纠正措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Control panel and indicators for production control in building projects
Abstract In general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper submitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信