{"title":"用于建筑项目生产控制的控制面板和指示器","authors":"P. Orihuela, Santiago Pacheco, J. Orihuela","doi":"10.1515/otmcj-2016-0027","DOIUrl":null,"url":null,"abstract":"Abstract In general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper submitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1665 - 1673"},"PeriodicalIF":1.6000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Control panel and indicators for production control in building projects\",\"authors\":\"P. Orihuela, Santiago Pacheco, J. Orihuela\",\"doi\":\"10.1515/otmcj-2016-0027\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract In general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper submitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"10 1\",\"pages\":\"1665 - 1673\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2018-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/otmcj-2016-0027\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/otmcj-2016-0027","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
Control panel and indicators for production control in building projects
Abstract In general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper submitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.