广宁6kV矿网在接地故障情况下自动接地,改善接地故障继电器的运行

IF 0.4 Q4 MINING & MINERAL PROCESSING
H. Bun, L. X. Thanh
{"title":"广宁6kV矿网在接地故障情况下自动接地,改善接地故障继电器的运行","authors":"H. Bun, L. X. Thanh","doi":"10.29227/im-2019-02-57","DOIUrl":null,"url":null,"abstract":"Single phase earth-fault in MV grids usually causes overvoltagethat harm to human being and electric equipments. In 6kV mining grids ofVietnam, earth fault which is majority incident accounts 55% to 73% of thetotal faults. When earth fault occurs many grids’ eco-technical parameterswill be affected. Moreover, the overvoltage and earthing current can lead toserious electric shock accidents caused mainly by stepping-overvoltage ortouching-overvoltage. One of earthing relays requirements is to trip inminimum time duration in order to reduce the magnitude of earthing currentsand overvoltage. Base on the simulation in Matlab, the paper suggests a priorconnection diagram that allows an auto earthing-connection for improvingthe better performance of relays. The utilization of the diagram will help todecrease the tripping time of relays, reduce the amplitude of internalovervoltage as well as enhance the safety for human being in case ofearthing incidents.","PeriodicalId":44414,"journal":{"name":"Inzynieria Mineralna-Journal of the Polish Mineral Engineering Society","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2022-01-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Improving the operation of earth fault relays by auto earthingconnection at earth fault situations in 6kV mining grid of Quang Ninh\",\"authors\":\"H. Bun, L. X. Thanh\",\"doi\":\"10.29227/im-2019-02-57\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Single phase earth-fault in MV grids usually causes overvoltagethat harm to human being and electric equipments. In 6kV mining grids ofVietnam, earth fault which is majority incident accounts 55% to 73% of thetotal faults. When earth fault occurs many grids’ eco-technical parameterswill be affected. Moreover, the overvoltage and earthing current can lead toserious electric shock accidents caused mainly by stepping-overvoltage ortouching-overvoltage. One of earthing relays requirements is to trip inminimum time duration in order to reduce the magnitude of earthing currentsand overvoltage. Base on the simulation in Matlab, the paper suggests a priorconnection diagram that allows an auto earthing-connection for improvingthe better performance of relays. The utilization of the diagram will help todecrease the tripping time of relays, reduce the amplitude of internalovervoltage as well as enhance the safety for human being in case ofearthing incidents.\",\"PeriodicalId\":44414,\"journal\":{\"name\":\"Inzynieria Mineralna-Journal of the Polish Mineral Engineering Society\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2022-01-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Inzynieria Mineralna-Journal of the Polish Mineral Engineering Society\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29227/im-2019-02-57\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Inzynieria Mineralna-Journal of the Polish Mineral Engineering Society","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29227/im-2019-02-57","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 0

摘要

中压电网中的单相接地故障通常会造成过电压,对人体和电气设备造成危害。在越南6kV矿山电网中,接地故障占总故障的55%至73%,是最常见的事故。当接地故障发生时,许多电网的生态技术参数将受到影响。此外,过电压和接地电流会导致严重的触电事故,主要由步进过电压或接触过电压引起。接地继电器的要求之一是在最短的时间内跳闸,以减少接地电流和过电压的大小。在Matlab仿真的基础上,提出了一种允许自动接地的优先接线图,以提高继电器的性能。该图的使用将有助于减少继电器的跳闸时间,降低内部过电压的幅度,并在发生接地事故时提高人类的安全性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improving the operation of earth fault relays by auto earthingconnection at earth fault situations in 6kV mining grid of Quang Ninh
Single phase earth-fault in MV grids usually causes overvoltagethat harm to human being and electric equipments. In 6kV mining grids ofVietnam, earth fault which is majority incident accounts 55% to 73% of thetotal faults. When earth fault occurs many grids’ eco-technical parameterswill be affected. Moreover, the overvoltage and earthing current can lead toserious electric shock accidents caused mainly by stepping-overvoltage ortouching-overvoltage. One of earthing relays requirements is to trip inminimum time duration in order to reduce the magnitude of earthing currentsand overvoltage. Base on the simulation in Matlab, the paper suggests a priorconnection diagram that allows an auto earthing-connection for improvingthe better performance of relays. The utilization of the diagram will help todecrease the tripping time of relays, reduce the amplitude of internalovervoltage as well as enhance the safety for human being in case ofearthing incidents.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.70
自引率
0.00%
发文量
44
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信