{"title":"等离子体研究所等离子体物理中心惯性静电约束聚变中子源装置术后辐射危害分析","authors":"H. Swami, S. Mohanty, S. Vala, R. Srinivasan, R. Kumar","doi":"10.4103/rpe.rpe_20_21","DOIUrl":null,"url":null,"abstract":"Center of Plasma Physics-Institute for Plasma Research, Nazirakhat, Assam, has the neutron source based on Inertial Electrostatic Confinement of Fusion. In order to scale up the source, it is planned to build a neutron source facility. The facility needs the construction approval from AERB India for occupational radiation safety during the operation and after the operation. It will also assess the short-term and long-term radiological hazards due to the neutron source. In order to evaluate the post irradiation radiation hazards due the neutron source, the radioactivation analysis of laboratory is carried out and reported here. The radioactivity in the laboratory building and source components after short-term and long-term operation has been assessed. The tritium activity in the soil is also evaluated. The calculation is also done for the contact dose rate estimations after operation to assess the maintenance applicability inside the laboratory. The inhalation dose inside the laboratory after the operation has been also calculated to avoid any hazards after operation maintenance activities. The article provides the complete details of post operation hazards analysis for the Inertial Electrostatic Confinement Fusion neutron source facility.","PeriodicalId":32488,"journal":{"name":"Radiation Protection and Environment","volume":"44 1","pages":"135 - 140"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of postoperation radiation hazards in inertial electrostatic confinement fusion neutron source facility at center of plasma physics under institute for plasma research\",\"authors\":\"H. Swami, S. Mohanty, S. Vala, R. Srinivasan, R. Kumar\",\"doi\":\"10.4103/rpe.rpe_20_21\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Center of Plasma Physics-Institute for Plasma Research, Nazirakhat, Assam, has the neutron source based on Inertial Electrostatic Confinement of Fusion. In order to scale up the source, it is planned to build a neutron source facility. The facility needs the construction approval from AERB India for occupational radiation safety during the operation and after the operation. It will also assess the short-term and long-term radiological hazards due to the neutron source. In order to evaluate the post irradiation radiation hazards due the neutron source, the radioactivation analysis of laboratory is carried out and reported here. The radioactivity in the laboratory building and source components after short-term and long-term operation has been assessed. The tritium activity in the soil is also evaluated. The calculation is also done for the contact dose rate estimations after operation to assess the maintenance applicability inside the laboratory. The inhalation dose inside the laboratory after the operation has been also calculated to avoid any hazards after operation maintenance activities. The article provides the complete details of post operation hazards analysis for the Inertial Electrostatic Confinement Fusion neutron source facility.\",\"PeriodicalId\":32488,\"journal\":{\"name\":\"Radiation Protection and Environment\",\"volume\":\"44 1\",\"pages\":\"135 - 140\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Radiation Protection and Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4103/rpe.rpe_20_21\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Radiation Protection and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4103/rpe.rpe_20_21","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

阿萨姆邦纳兹拉克哈特等离子体研究所等离子体物理中心拥有基于惯性静电约束聚变的中子源。为了扩大中子源的规模,计划建造一个中子源设施。该设施在运行期间和运行后的职业辐射安全需要获得印度AERB的建设批准。它还将评估中子源造成的短期和长期辐射危害。为了评价中子源辐照后的辐射危害,本文进行了实验室放射性分析。对实验楼和源部件在短期和长期运行后的放射性进行了评估。并对土壤中的氚活性进行了评价。并计算了操作后的接触剂量率估算,以评估实验室内部的维护适用性。手术后实验室内的吸入剂量也进行了计算,以避免手术维护活动后的任何危害。本文详细介绍了惯性静电约束聚变中子源设施运行后危害分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of postoperation radiation hazards in inertial electrostatic confinement fusion neutron source facility at center of plasma physics under institute for plasma research
Center of Plasma Physics-Institute for Plasma Research, Nazirakhat, Assam, has the neutron source based on Inertial Electrostatic Confinement of Fusion. In order to scale up the source, it is planned to build a neutron source facility. The facility needs the construction approval from AERB India for occupational radiation safety during the operation and after the operation. It will also assess the short-term and long-term radiological hazards due to the neutron source. In order to evaluate the post irradiation radiation hazards due the neutron source, the radioactivation analysis of laboratory is carried out and reported here. The radioactivity in the laboratory building and source components after short-term and long-term operation has been assessed. The tritium activity in the soil is also evaluated. The calculation is also done for the contact dose rate estimations after operation to assess the maintenance applicability inside the laboratory. The inhalation dose inside the laboratory after the operation has been also calculated to avoid any hazards after operation maintenance activities. The article provides the complete details of post operation hazards analysis for the Inertial Electrostatic Confinement Fusion neutron source facility.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
15 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信