塞提夫有轨电车的研究与建设。城市项目方法?

S. Kachef, B. Labii, S. Bouzaher
{"title":"塞提夫有轨电车的研究与建设。城市项目方法?","authors":"S. Kachef, B. Labii, S. Bouzaher","doi":"10.4314/JFAS.V13I1.18","DOIUrl":null,"url":null,"abstract":"The Setif Tramway project is a significant urban project, mobilizing, strategic and innovative, which has upset the urban dynamics of the city, by its insertion on its primary East-West axis, representing its backbone. \nThis paper aims the apprehension of this project as a city project, through its development process, to understand its approach, and to identify a new posture which speaks of a management system, where the process of “Pluralization” responds to strategic orientations which aim at complementarity between the strategy of political actors and the needs of citizen actors. The aim is to speak about the design and development phase of the Setif tram project. Allowing researchers to develop a roadmap for their projects and helping decision-makers to pilot and manage such operations.","PeriodicalId":15885,"journal":{"name":"Journal of Fundamental and Applied Sciences","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study and construction of the Setif Tramway. An urban project approach?\",\"authors\":\"S. Kachef, B. Labii, S. Bouzaher\",\"doi\":\"10.4314/JFAS.V13I1.18\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Setif Tramway project is a significant urban project, mobilizing, strategic and innovative, which has upset the urban dynamics of the city, by its insertion on its primary East-West axis, representing its backbone. \\nThis paper aims the apprehension of this project as a city project, through its development process, to understand its approach, and to identify a new posture which speaks of a management system, where the process of “Pluralization” responds to strategic orientations which aim at complementarity between the strategy of political actors and the needs of citizen actors. The aim is to speak about the design and development phase of the Setif tram project. Allowing researchers to develop a roadmap for their projects and helping decision-makers to pilot and manage such operations.\",\"PeriodicalId\":15885,\"journal\":{\"name\":\"Journal of Fundamental and Applied Sciences\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Fundamental and Applied Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4314/JFAS.V13I1.18\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Fundamental and Applied Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4314/JFAS.V13I1.18","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Setif有轨电车项目是一个重要的城市项目,具有动员性、战略性和创新性,它通过插入其主要的东西轴,代表其骨干,扰乱了城市的城市动态。本文旨在将该项目理解为一个城市项目,通过其发展过程,理解其方法,并确定一种新的姿态,即管理系统,其中“多元化”过程响应旨在政治行为者战略与公民行为者需求之间互补的战略方向。目的是谈谈塞提夫有轨电车项目的设计和开发阶段。允许研究人员为他们的项目制定路线图,并帮助决策者试点和管理这些行动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study and construction of the Setif Tramway. An urban project approach?
The Setif Tramway project is a significant urban project, mobilizing, strategic and innovative, which has upset the urban dynamics of the city, by its insertion on its primary East-West axis, representing its backbone. This paper aims the apprehension of this project as a city project, through its development process, to understand its approach, and to identify a new posture which speaks of a management system, where the process of “Pluralization” responds to strategic orientations which aim at complementarity between the strategy of political actors and the needs of citizen actors. The aim is to speak about the design and development phase of the Setif tram project. Allowing researchers to develop a roadmap for their projects and helping decision-makers to pilot and manage such operations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信