{"title":"近面堆料露天开采:一种提高净现值和工厂生产质量的方法","authors":"Hongshuo Gong, M. Tabesh, A. Moradi Afrapoli, H. Askari-Nasab","doi":"10.1080/17480930.2022.2160891","DOIUrl":null,"url":null,"abstract":"ABSTRACT Stockpiles are of great importance in open pit mine production scheduling and are widely used for different reasons while being placed in different locations. Near face stockpile (NFS) is a new mining concept which combines the IPCC (in-pit crushing and conveying) method with an in-pit near-face (and near crusher) stockpile. The stockpile decouples the whole mining flow into two weakly related subsystems, which are the mining subsystem and processing subsystem. There are many theoretical advantages in comparison to the traditional open-pit mining method, such as higher tolerance on uncertainties without compromising production, higher equipment utilisation, less operating cost, better blending results, etc. The introduction of NFS, however, requires reconsideration of production planning in open pit mines. In this paper, we developed a mixed integer linear programming model to solve long-term production scheduling problem in open pit mines. To quantitatively measure the performance of the NFS mining method, we implemented the model in a real mining case study and compared the results with the traditional open pit mining method with an out-of-pit crusher. The results reveal that implementing the NFS method can improve the net present value by 9.3% and decrease the plant MWT head grade deviation by 20%.","PeriodicalId":49180,"journal":{"name":"International Journal of Mining Reclamation and Environment","volume":null,"pages":null},"PeriodicalIF":2.7000,"publicationDate":"2022-12-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Near-face stockpile open pit mining: a method to enhance NPV and quality of the plant throughput\",\"authors\":\"Hongshuo Gong, M. Tabesh, A. Moradi Afrapoli, H. Askari-Nasab\",\"doi\":\"10.1080/17480930.2022.2160891\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT Stockpiles are of great importance in open pit mine production scheduling and are widely used for different reasons while being placed in different locations. Near face stockpile (NFS) is a new mining concept which combines the IPCC (in-pit crushing and conveying) method with an in-pit near-face (and near crusher) stockpile. The stockpile decouples the whole mining flow into two weakly related subsystems, which are the mining subsystem and processing subsystem. There are many theoretical advantages in comparison to the traditional open-pit mining method, such as higher tolerance on uncertainties without compromising production, higher equipment utilisation, less operating cost, better blending results, etc. The introduction of NFS, however, requires reconsideration of production planning in open pit mines. In this paper, we developed a mixed integer linear programming model to solve long-term production scheduling problem in open pit mines. To quantitatively measure the performance of the NFS mining method, we implemented the model in a real mining case study and compared the results with the traditional open pit mining method with an out-of-pit crusher. The results reveal that implementing the NFS method can improve the net present value by 9.3% and decrease the plant MWT head grade deviation by 20%.\",\"PeriodicalId\":49180,\"journal\":{\"name\":\"International Journal of Mining Reclamation and Environment\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.7000,\"publicationDate\":\"2022-12-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Mining Reclamation and Environment\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1080/17480930.2022.2160891\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENVIRONMENTAL SCIENCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mining Reclamation and Environment","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1080/17480930.2022.2160891","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENVIRONMENTAL SCIENCES","Score":null,"Total":0}
引用次数: 1

摘要

摘要料堆在露天矿生产调度中具有重要意义,由于不同的原因,料堆在不同的位置被广泛使用。近工作面堆(NFS)是一种新的采矿概念,它将IPCC(矿井内破碎和输送)方法与矿井内近工作面(和近破碎机)堆相结合。料堆将整个采矿流程解耦为两个弱相关的子系统,即采矿子系统和加工子系统。与传统的露天采矿方法相比,有许多理论优势,如在不影响生产的情况下对不确定性的容忍度更高、设备利用率更高、运营成本更低、混合效果更好等。然而,NFS的引入需要重新考虑露天矿的生产计划。本文建立了一个混合整数线性规划模型来求解露天矿的长期生产调度问题。为了定量测量NFS采矿方法的性能,我们在一个实际的采矿案例研究中实现了该模型,并将结果与传统的露天采矿方法进行了比较。结果表明,采用NFS方法可以使净现值提高9.3%,使工厂MWT原矿品位偏差降低20%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Near-face stockpile open pit mining: a method to enhance NPV and quality of the plant throughput
ABSTRACT Stockpiles are of great importance in open pit mine production scheduling and are widely used for different reasons while being placed in different locations. Near face stockpile (NFS) is a new mining concept which combines the IPCC (in-pit crushing and conveying) method with an in-pit near-face (and near crusher) stockpile. The stockpile decouples the whole mining flow into two weakly related subsystems, which are the mining subsystem and processing subsystem. There are many theoretical advantages in comparison to the traditional open-pit mining method, such as higher tolerance on uncertainties without compromising production, higher equipment utilisation, less operating cost, better blending results, etc. The introduction of NFS, however, requires reconsideration of production planning in open pit mines. In this paper, we developed a mixed integer linear programming model to solve long-term production scheduling problem in open pit mines. To quantitatively measure the performance of the NFS mining method, we implemented the model in a real mining case study and compared the results with the traditional open pit mining method with an out-of-pit crusher. The results reveal that implementing the NFS method can improve the net present value by 9.3% and decrease the plant MWT head grade deviation by 20%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Mining Reclamation and Environment
International Journal of Mining Reclamation and Environment ENVIRONMENTAL SCIENCES-MINING & MINERAL PROCESSING
CiteScore
5.70
自引率
8.30%
发文量
30
审稿时长
>12 weeks
期刊介绍: The International Journal of Mining, Reclamation and Environment published research on mining and environmental technology engineering relating to metalliferous deposits, coal, oil sands, and industrial minerals. We welcome environmental mining research papers that explore: -Mining environmental impact assessment and permitting- Mining and processing technologies- Mining waste management and waste minimization practices in mining- Mine site closure- Mining decommissioning and reclamation- Acid mine drainage. The International Journal of Mining, Reclamation and Environment welcomes mining research papers that explore: -Design of surface and underground mines (economics, geotechnical, production scheduling, ventilation)- Mine planning and optimization- Mining geostatics- Mine drilling and blasting technologies- Mining material handling systems- Mine equipment
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信