抛光条件下的ETCS(ESC)和GSM-R(RSC)兼容性测试

M. Kycko, D. Adamski, Łukasz Zawadka
{"title":"抛光条件下的ETCS(ESC)和GSM-R(RSC)兼容性测试","authors":"M. Kycko, D. Adamski, Łukasz Zawadka","doi":"10.35117/a_eng_22_08_09_03","DOIUrl":null,"url":null,"abstract":"Abstract: The process of verification of the installation of the ‘on-board control-command and signalling’ subsystem is complex and requires numerous and time-consuming checks of both the overall technical documentation for a given ETCS installation on a specific vehicle, as well as checks performed during in-service tests. The experience has shown that the tests carried out in laboratories in simulated conditions and the commissioning tests of the on- board and trackside subsystems do not provide sufficient certainty in terms of the correct integration of the ‘on-board control-command and signalling’ subsystem with ‘trackside control-command and signalling’ subsystem and other subsystems. Therefore, additional tests of ETCS (European Train Control System) and GSM-R (GSM for Railways) on-board configurations with trackside ETCS and GSM-R installations on railway lines were introduced (hereinafter ESC / RSC compatibility tests). The premise of the ESC compatibility tests and RSC is to facilitate the operation of new subsystems, because their correct functioning in a given environment is fully verified at the stage of demonstrating compliance of ESC and RSC. In accordance with Polish requirements, from 1 July 2021, ESC / RSC tests are obligatory for all new, renewed and modernized projects in the field of the ‘on-board control-command and signalling’ subsystem. This obligation is a big challenge for vehicle manufacturers and users, because at that time these tests had not yet been carried out on the network managed by PKP PLK S.A. Accordingly, this article aims to introduce the issues related to the ESC and RSC tests, as well as to describe the roles and responsibilities of the various parties involved. in the implementation of the tests. Keywords: ESC / RSC tests; Compatibility; ERTMS, ETCS","PeriodicalId":52762,"journal":{"name":"Przeglad Komunikacyjny","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ETCS (ESC) and GSM-R (RSC) compatibility tests in polish conditions\",\"authors\":\"M. Kycko, D. Adamski, Łukasz Zawadka\",\"doi\":\"10.35117/a_eng_22_08_09_03\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract: The process of verification of the installation of the ‘on-board control-command and signalling’ subsystem is complex and requires numerous and time-consuming checks of both the overall technical documentation for a given ETCS installation on a specific vehicle, as well as checks performed during in-service tests. The experience has shown that the tests carried out in laboratories in simulated conditions and the commissioning tests of the on- board and trackside subsystems do not provide sufficient certainty in terms of the correct integration of the ‘on-board control-command and signalling’ subsystem with ‘trackside control-command and signalling’ subsystem and other subsystems. Therefore, additional tests of ETCS (European Train Control System) and GSM-R (GSM for Railways) on-board configurations with trackside ETCS and GSM-R installations on railway lines were introduced (hereinafter ESC / RSC compatibility tests). The premise of the ESC compatibility tests and RSC is to facilitate the operation of new subsystems, because their correct functioning in a given environment is fully verified at the stage of demonstrating compliance of ESC and RSC. In accordance with Polish requirements, from 1 July 2021, ESC / RSC tests are obligatory for all new, renewed and modernized projects in the field of the ‘on-board control-command and signalling’ subsystem. This obligation is a big challenge for vehicle manufacturers and users, because at that time these tests had not yet been carried out on the network managed by PKP PLK S.A. Accordingly, this article aims to introduce the issues related to the ESC and RSC tests, as well as to describe the roles and responsibilities of the various parties involved. in the implementation of the tests. Keywords: ESC / RSC tests; Compatibility; ERTMS, ETCS\",\"PeriodicalId\":52762,\"journal\":{\"name\":\"Przeglad Komunikacyjny\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Przeglad Komunikacyjny\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35117/a_eng_22_08_09_03\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Przeglad Komunikacyjny","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35117/a_eng_22_08_09_03","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要:“车载控制命令和信号”子系统安装的验证过程很复杂,需要对特定车辆上特定ETCS安装的整体技术文件进行大量耗时的检查,以及在役测试期间进行的检查。经验表明,在模拟条件下在实验室进行的测试以及车载和轨旁子系统的调试测试并不能为“车载控制命令和信号”子系统与“轨旁控制命令和信令”子系统及其他子系统的正确集成提供足够的确定性。因此,引入了ETCS(欧洲列车控制系统)和GSM-R(铁路GSM)车载配置与轨道旁ETCS和GSM-R安装在铁路线上的附加测试(以下简称ESC/RSC兼容性测试)。ESC兼容性测试和RSC的前提是促进新子系统的运行,因为在证明ESC和RSC符合性的阶段,已经充分验证了它们在给定环境中的正确功能。根据波兰的要求,从2021年7月1日起,“车载控制指挥和信号”子系统领域的所有新的、更新的和现代化的项目都必须进行ESC/RSC测试。这一义务对车辆制造商和用户来说是一个巨大的挑战,因为当时这些测试尚未在PKP PLK美国管理的网络上进行。因此,本文旨在介绍与ESC和RSC测试相关的问题,并描述相关各方的角色和责任。在测试的实施中。关键词:ESC/RSC试验;兼容性;ERTMS等
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ETCS (ESC) and GSM-R (RSC) compatibility tests in polish conditions
Abstract: The process of verification of the installation of the ‘on-board control-command and signalling’ subsystem is complex and requires numerous and time-consuming checks of both the overall technical documentation for a given ETCS installation on a specific vehicle, as well as checks performed during in-service tests. The experience has shown that the tests carried out in laboratories in simulated conditions and the commissioning tests of the on- board and trackside subsystems do not provide sufficient certainty in terms of the correct integration of the ‘on-board control-command and signalling’ subsystem with ‘trackside control-command and signalling’ subsystem and other subsystems. Therefore, additional tests of ETCS (European Train Control System) and GSM-R (GSM for Railways) on-board configurations with trackside ETCS and GSM-R installations on railway lines were introduced (hereinafter ESC / RSC compatibility tests). The premise of the ESC compatibility tests and RSC is to facilitate the operation of new subsystems, because their correct functioning in a given environment is fully verified at the stage of demonstrating compliance of ESC and RSC. In accordance with Polish requirements, from 1 July 2021, ESC / RSC tests are obligatory for all new, renewed and modernized projects in the field of the ‘on-board control-command and signalling’ subsystem. This obligation is a big challenge for vehicle manufacturers and users, because at that time these tests had not yet been carried out on the network managed by PKP PLK S.A. Accordingly, this article aims to introduce the issues related to the ESC and RSC tests, as well as to describe the roles and responsibilities of the various parties involved. in the implementation of the tests. Keywords: ESC / RSC tests; Compatibility; ERTMS, ETCS
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
5 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信