基于田口损失函数的海洋建设项目风险评估

A. Valyani, N. Farahmand, S. Iranzadeh
{"title":"基于田口损失函数的海洋建设项目风险评估","authors":"A. Valyani, N. Farahmand, S. Iranzadeh","doi":"10.29252/ijcoe.3.3.33","DOIUrl":null,"url":null,"abstract":"Article History: Received: 04 Jan. 2020 Accepted: 10 May. 2020 Today complicated and risky environment makes risk assessment and identification one of the main steps of proper project management and realization of project objectives. Marine construction projects are key and strategic projects, and their specific nature adds to their importance. This study aimed to propose a method for risk assessment and ranking critical risks in marine construction projects in Iran. To this end, the risk assessment team was formed to identify serious marine construction project risks using risk breakdown structure. Afterward, the team defined risk assessment measures. All risks were assessed in each criterion based on the Taguchi loss function. It allowed decision-makers to define a measurable risk threshold for each criterion and assess risks by developing a common language called loss score. Finally, critical risks were determined based on their priority. The results can be used to improve effective risk management, and consequently, project management.","PeriodicalId":33914,"journal":{"name":"International Journal of Coastal and Offshore Engineering","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-10-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Risk assessment of marine construction projects using Taguchi Loss Function\",\"authors\":\"A. Valyani, N. Farahmand, S. Iranzadeh\",\"doi\":\"10.29252/ijcoe.3.3.33\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Article History: Received: 04 Jan. 2020 Accepted: 10 May. 2020 Today complicated and risky environment makes risk assessment and identification one of the main steps of proper project management and realization of project objectives. Marine construction projects are key and strategic projects, and their specific nature adds to their importance. This study aimed to propose a method for risk assessment and ranking critical risks in marine construction projects in Iran. To this end, the risk assessment team was formed to identify serious marine construction project risks using risk breakdown structure. Afterward, the team defined risk assessment measures. All risks were assessed in each criterion based on the Taguchi loss function. It allowed decision-makers to define a measurable risk threshold for each criterion and assess risks by developing a common language called loss score. Finally, critical risks were determined based on their priority. The results can be used to improve effective risk management, and consequently, project management.\",\"PeriodicalId\":33914,\"journal\":{\"name\":\"International Journal of Coastal and Offshore Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Coastal and Offshore Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29252/ijcoe.3.3.33\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Coastal and Offshore Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29252/ijcoe.3.3.33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

文章历史:收稿日期:2020年1月4日收稿日期:2020年5月10日今天,复杂和风险的环境使风险评估和识别成为正确的项目管理和实现项目目标的主要步骤之一。海洋建设工程是重点、战略性工程,其特殊性决定了其重要性。本研究旨在提出伊朗海洋建设项目的风险评估和关键风险排序方法。为此,成立了风险评估小组,利用风险分解结构识别海洋建设项目的严重风险。之后,团队定义了风险评估措施。根据田口损失函数对每个标准的所有风险进行评估。它允许决策者为每个标准定义一个可测量的风险阈值,并通过开发一种称为损失评分的通用语言来评估风险。最后,根据其优先级确定关键风险。结果可用于改进有效的风险管理,从而改进项目管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Risk assessment of marine construction projects using Taguchi Loss Function
Article History: Received: 04 Jan. 2020 Accepted: 10 May. 2020 Today complicated and risky environment makes risk assessment and identification one of the main steps of proper project management and realization of project objectives. Marine construction projects are key and strategic projects, and their specific nature adds to their importance. This study aimed to propose a method for risk assessment and ranking critical risks in marine construction projects in Iran. To this end, the risk assessment team was formed to identify serious marine construction project risks using risk breakdown structure. Afterward, the team defined risk assessment measures. All risks were assessed in each criterion based on the Taguchi loss function. It allowed decision-makers to define a measurable risk threshold for each criterion and assess risks by developing a common language called loss score. Finally, critical risks were determined based on their priority. The results can be used to improve effective risk management, and consequently, project management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信