评估为高端客户服务的新型Jakabaring母装甲的左侧约束系统

Anton Firmansyah, M. Noer, Ihsan Jihadi Putra
{"title":"评估为高端客户服务的新型Jakabaring母装甲的左侧约束系统","authors":"Anton Firmansyah, M. Noer, Ihsan Jihadi Putra","doi":"10.33795/eltek.v20i1.338","DOIUrl":null,"url":null,"abstract":"ABSTRAKPoliteknik Pariwisata Palembang dan Bowling Jakabaring Sport City merupakan pelanggan premium PT. PLN (Persero) UP3 Palembang. Sebagai pelanggan premium sudah seharusnya kedua pelanggan ini mendapatkan keandalan jaringan listrik. Pada awalnya Politeknik Pariwisata Palembang termasuk dalam kawasan Zero Down Time untuk mengamankan suplai kelistrikan Jakabaring Sport City pada perhelatan Asian Games tahun 2018. Setelah berakhirnya perhelatan Asian Games 2018, beban pada trafo daya-2 di Gardu Induk New Jakabaring turun dibawah 50%. Untuk membebani trafo daya tersebut maka PT. PLN (persero) UP3 Palembang menambahkan jaringan existing pada Gardu Hubung Politeknik Pariwisata melalui Saluran Udara Tegangan Menengah Pertahanan Gardu Hubung 8 Plaju. Perubahan konfigurasi distribusi listrik ini harusnya diimbangi dengan koordinasi proteksi yang tepat agar dapat menjaga keandalan supplai listrik, namun kenyataanya di lapangan berbeda, terhitung sejak bulan April 2019, penyulang Kalingga sudah mengalami 88 kali padam dengan rata-rata padam 656 menit. Dari sisi ekonomis, pemadaman yang meluas merugikan PT. PLN (Persero) karena ENS (Energy Not Sold) serta PLN juga harus membayar kompensasi kepada golongan pelanggan premium karena gagal memenuhi komitmennya dalam memberikan pelayanan listrik andal sesuai dengan perjanjian yang telah disepakati. \n  \nABSTRACTPoliteknik Pariwisata Palembang and Bowling Jakabaring Sport City is a premium customer of PT. PLN (Persero) UP3 Palembang. As premium customers, both of these customers should get the reliability of the power grid.Initially, Politeknik Pariwisata Palembang was included in the Zero Down Time area to secure the electricity supply of Jakabaring Sport City at the Asian Games in 2018. After the end of the 2018 Asian Games, the load on the transformer power-2 at the New Jakabaring Substation dropped below 50%. To overload the power transformer, PT. PLN (persero) UP3 Palembang added an existing network at the Politeknik Pariwisata Link Substation through the Medium Voltage Air Line Pertahanan of 8 Plaju Substation. This change in electricity distribution configuration should be balanced with proper protection coordination in order to maintain the reliability of the electric supply, but the reality in the field is different, starting from April 2019, Kalingga refiners have experienced 88 outages with an average outage of 656 minutes. From an economic point of effect, widespread blackouts harm PT. PLN (Persero) UP3 because ENS (Energy Not Sold) and PLN also have to pay compensation to premium customers for failing to meet their commitments in providing reliable electricity services in accordance with agreed agreements.","PeriodicalId":53405,"journal":{"name":"Jurnal Eltek","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-08-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluasi sistem proteksi penyulang kalingga pada gardu induk New Jakabaring yang melayani pelanggan premium\",\"authors\":\"Anton Firmansyah, M. Noer, Ihsan Jihadi Putra\",\"doi\":\"10.33795/eltek.v20i1.338\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRAKPoliteknik Pariwisata Palembang dan Bowling Jakabaring Sport City merupakan pelanggan premium PT. PLN (Persero) UP3 Palembang. Sebagai pelanggan premium sudah seharusnya kedua pelanggan ini mendapatkan keandalan jaringan listrik. Pada awalnya Politeknik Pariwisata Palembang termasuk dalam kawasan Zero Down Time untuk mengamankan suplai kelistrikan Jakabaring Sport City pada perhelatan Asian Games tahun 2018. Setelah berakhirnya perhelatan Asian Games 2018, beban pada trafo daya-2 di Gardu Induk New Jakabaring turun dibawah 50%. Untuk membebani trafo daya tersebut maka PT. PLN (persero) UP3 Palembang menambahkan jaringan existing pada Gardu Hubung Politeknik Pariwisata melalui Saluran Udara Tegangan Menengah Pertahanan Gardu Hubung 8 Plaju. Perubahan konfigurasi distribusi listrik ini harusnya diimbangi dengan koordinasi proteksi yang tepat agar dapat menjaga keandalan supplai listrik, namun kenyataanya di lapangan berbeda, terhitung sejak bulan April 2019, penyulang Kalingga sudah mengalami 88 kali padam dengan rata-rata padam 656 menit. Dari sisi ekonomis, pemadaman yang meluas merugikan PT. PLN (Persero) karena ENS (Energy Not Sold) serta PLN juga harus membayar kompensasi kepada golongan pelanggan premium karena gagal memenuhi komitmennya dalam memberikan pelayanan listrik andal sesuai dengan perjanjian yang telah disepakati. \\n  \\nABSTRACTPoliteknik Pariwisata Palembang and Bowling Jakabaring Sport City is a premium customer of PT. PLN (Persero) UP3 Palembang. As premium customers, both of these customers should get the reliability of the power grid.Initially, Politeknik Pariwisata Palembang was included in the Zero Down Time area to secure the electricity supply of Jakabaring Sport City at the Asian Games in 2018. After the end of the 2018 Asian Games, the load on the transformer power-2 at the New Jakabaring Substation dropped below 50%. To overload the power transformer, PT. PLN (persero) UP3 Palembang added an existing network at the Politeknik Pariwisata Link Substation through the Medium Voltage Air Line Pertahanan of 8 Plaju Substation. This change in electricity distribution configuration should be balanced with proper protection coordination in order to maintain the reliability of the electric supply, but the reality in the field is different, starting from April 2019, Kalingga refiners have experienced 88 outages with an average outage of 656 minutes. From an economic point of effect, widespread blackouts harm PT. PLN (Persero) UP3 because ENS (Energy Not Sold) and PLN also have to pay compensation to premium customers for failing to meet their commitments in providing reliable electricity services in accordance with agreed agreements.\",\"PeriodicalId\":53405,\"journal\":{\"name\":\"Jurnal Eltek\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Eltek\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33795/eltek.v20i1.338\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Eltek","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33795/eltek.v20i1.338","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

ABSTRAKPolitechnik Pariwisata Palembang和Bowling Jakabaring Sport City是印尼国家电力公司(Persero)UP3 Palembang的高级客户。作为主要客户,这两个客户应该获得电网控制权。最初,Palembang Pariwisata理工学院被列入零停机时间区域,以确保雅加达体育城在2018年亚运会上的许可证供应。2018年亚运会结束后,新雅卡巴林家长花园的电源2交通负荷下降了50%。为了增加电力流量,印尼国家电力公司(%)UP3开发商通过空军力量中心防御花园8 Plaju将现有网络添加到Pariwisata政治技术联络花园。这种配电配置的变化应该与正确的保护协调相平衡,以维持电力供应,但事实上,在不同的领域,自2019年4月以来计算,周日的复发已经被88次取消,平均656分钟。从经济角度来看,大范围的删除损害了PT。PLN(Persero),因为ENS(未出售能源)和PLN还必须向未能履行其根据商定协议提供体面电力服务的承诺的优质客户支付赔偿。[UNK]摘要Politik Pariwisata Palembang和Bowling Jakabaring Sport City是印尼国家电力公司(Persero)UP3 Palembang的高级客户。作为优质客户,这两个客户都应该获得电网的可靠性。最初,Politeknik Pariwisata Palembang被列入零停机时间区域,以确保雅加达体育城在2018年亚运会上的电力供应。2018年亚运会结束后,新Jakabaring变电站的变压器电源2负载降至50%以下。为了使电力变压器过载,印尼国家电力公司UP3 Palembang通过8 Plaju变电站的中压防空在Politeknik Pariwisata Link变电站增加了一个现有网络。配电配置的这种变化应与适当的保护协调相平衡,以保持电力供应的可靠性,但现场的现实情况不同,从2019年4月开始,卡林加炼油厂经历了88次停电,平均停电656分钟。[UNK]从经济角度来看,大范围停电损害了印尼国家电力公司(Persero)UP3,因为ENS(未出售能源)和印尼国家电力局还必须向未能履行其根据商定协议提供可靠电力服务的承诺的优质客户支付赔偿。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluasi sistem proteksi penyulang kalingga pada gardu induk New Jakabaring yang melayani pelanggan premium
ABSTRAKPoliteknik Pariwisata Palembang dan Bowling Jakabaring Sport City merupakan pelanggan premium PT. PLN (Persero) UP3 Palembang. Sebagai pelanggan premium sudah seharusnya kedua pelanggan ini mendapatkan keandalan jaringan listrik. Pada awalnya Politeknik Pariwisata Palembang termasuk dalam kawasan Zero Down Time untuk mengamankan suplai kelistrikan Jakabaring Sport City pada perhelatan Asian Games tahun 2018. Setelah berakhirnya perhelatan Asian Games 2018, beban pada trafo daya-2 di Gardu Induk New Jakabaring turun dibawah 50%. Untuk membebani trafo daya tersebut maka PT. PLN (persero) UP3 Palembang menambahkan jaringan existing pada Gardu Hubung Politeknik Pariwisata melalui Saluran Udara Tegangan Menengah Pertahanan Gardu Hubung 8 Plaju. Perubahan konfigurasi distribusi listrik ini harusnya diimbangi dengan koordinasi proteksi yang tepat agar dapat menjaga keandalan supplai listrik, namun kenyataanya di lapangan berbeda, terhitung sejak bulan April 2019, penyulang Kalingga sudah mengalami 88 kali padam dengan rata-rata padam 656 menit. Dari sisi ekonomis, pemadaman yang meluas merugikan PT. PLN (Persero) karena ENS (Energy Not Sold) serta PLN juga harus membayar kompensasi kepada golongan pelanggan premium karena gagal memenuhi komitmennya dalam memberikan pelayanan listrik andal sesuai dengan perjanjian yang telah disepakati.   ABSTRACTPoliteknik Pariwisata Palembang and Bowling Jakabaring Sport City is a premium customer of PT. PLN (Persero) UP3 Palembang. As premium customers, both of these customers should get the reliability of the power grid.Initially, Politeknik Pariwisata Palembang was included in the Zero Down Time area to secure the electricity supply of Jakabaring Sport City at the Asian Games in 2018. After the end of the 2018 Asian Games, the load on the transformer power-2 at the New Jakabaring Substation dropped below 50%. To overload the power transformer, PT. PLN (persero) UP3 Palembang added an existing network at the Politeknik Pariwisata Link Substation through the Medium Voltage Air Line Pertahanan of 8 Plaju Substation. This change in electricity distribution configuration should be balanced with proper protection coordination in order to maintain the reliability of the electric supply, but the reality in the field is different, starting from April 2019, Kalingga refiners have experienced 88 outages with an average outage of 656 minutes. From an economic point of effect, widespread blackouts harm PT. PLN (Persero) UP3 because ENS (Energy Not Sold) and PLN also have to pay compensation to premium customers for failing to meet their commitments in providing reliable electricity services in accordance with agreed agreements.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
1
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信