自由邦公共工程项目的概念性质量改进协议

IF 0.6 Q4 MANAGEMENT
Lehlohonolo Thulo, Mr Lehlohonolo, M. Thulo, Eng, Graduate, Prof. Fidelis Emuze, Head, Elizabeth Theron Prof. Elizabeth, Theron
{"title":"自由邦公共工程项目的概念性质量改进协议","authors":"Lehlohonolo Thulo, Mr Lehlohonolo, M. Thulo, Eng, Graduate, Prof. Fidelis Emuze, Head, Elizabeth Theron Prof. Elizabeth, Theron","doi":"10.38140/as.v30i1.7115","DOIUrl":null,"url":null,"abstract":"Materials delivered on public works project sites deviate from technical specifications, with detrimental implications for the quality of the construction process and product. When delivered materials differ from specifications, quality issues such as defects and re-work ensue at greater cost to the clients.","PeriodicalId":42571,"journal":{"name":"Acta Structilia","volume":" ","pages":""},"PeriodicalIF":0.6000,"publicationDate":"2023-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A conceptual quality improvement protocol for Free State public works projects\",\"authors\":\"Lehlohonolo Thulo, Mr Lehlohonolo, M. Thulo, Eng, Graduate, Prof. Fidelis Emuze, Head, Elizabeth Theron Prof. Elizabeth, Theron\",\"doi\":\"10.38140/as.v30i1.7115\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Materials delivered on public works project sites deviate from technical specifications, with detrimental implications for the quality of the construction process and product. When delivered materials differ from specifications, quality issues such as defects and re-work ensue at greater cost to the clients.\",\"PeriodicalId\":42571,\"journal\":{\"name\":\"Acta Structilia\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.6000,\"publicationDate\":\"2023-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Acta Structilia\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.38140/as.v30i1.7115\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Structilia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.38140/as.v30i1.7115","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

摘要

在公共工程项目现场交付的材料偏离技术规范,对施工过程和产品质量产生不利影响。当交付的材料与规格不符时,质量问题(如缺陷和返工)就会随之而来,给客户带来更大的成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A conceptual quality improvement protocol for Free State public works projects
Materials delivered on public works project sites deviate from technical specifications, with detrimental implications for the quality of the construction process and product. When delivered materials differ from specifications, quality issues such as defects and re-work ensue at greater cost to the clients.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Acta Structilia
Acta Structilia MANAGEMENT-
自引率
14.30%
发文量
0
审稿时长
18 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信