{"title":"中东建设项目成本影响与管理不善的关系","authors":"Forat Al-Sahar","doi":"10.22630/PNIKS.2019.28.2.19","DOIUrl":null,"url":null,"abstract":"The creations of construction projects firstly try to achieve several specific goals. Effective projects are believed when these goals achieved. The principal concerns are to cross the downsides and defects. The stage of the performance project may be the most significant, crucial and drains of the resources through the project life cycle, its dependence on monitoring by professional in order to exceeded things blocking the path and accomplish the project plan exactly. The targets of the study are to diagnosis the actual reasons and locating the relation of mismanagement of the project execution stage and measure their influence on the cost. The study achieved and diagnoses many problems that have a negative impact on the projects management implementation as well as the effects of the cost by using many ways to reaching the target. There are 22 problems it is the main reasons that deviation the cost plus they obtain agreement level number according to Likert scale quintet.","PeriodicalId":38397,"journal":{"name":"Scientific Review Engineering and Environmental Sciences","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The relation between the cost impact and mismanagement in the Middle East construction projects\",\"authors\":\"Forat Al-Sahar\",\"doi\":\"10.22630/PNIKS.2019.28.2.19\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The creations of construction projects firstly try to achieve several specific goals. Effective projects are believed when these goals achieved. The principal concerns are to cross the downsides and defects. The stage of the performance project may be the most significant, crucial and drains of the resources through the project life cycle, its dependence on monitoring by professional in order to exceeded things blocking the path and accomplish the project plan exactly. The targets of the study are to diagnosis the actual reasons and locating the relation of mismanagement of the project execution stage and measure their influence on the cost. The study achieved and diagnoses many problems that have a negative impact on the projects management implementation as well as the effects of the cost by using many ways to reaching the target. There are 22 problems it is the main reasons that deviation the cost plus they obtain agreement level number according to Likert scale quintet.\",\"PeriodicalId\":38397,\"journal\":{\"name\":\"Scientific Review Engineering and Environmental Sciences\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Review Engineering and Environmental Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22630/PNIKS.2019.28.2.19\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Review Engineering and Environmental Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22630/PNIKS.2019.28.2.19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

摘要

建设项目的创作首先要实现几个具体的目标。当这些目标实现时,就相信项目是有效的。主要的关注点是克服缺点和缺陷。绩效项目的阶段可能是整个项目生命周期中最重要、最关键、最消耗资源的阶段,它依赖于专业人员的监控,以便超越阻碍项目前进道路的事物,准确地完成项目计划。研究的目的是诊断项目执行阶段管理不善的实际原因和定位管理不善的关系,并测量其对成本的影响。本研究通过多种途径达到目标,实现并诊断了许多影响项目管理实施和成本影响的问题。有22个问题,其主要原因是偏离成本加上他们根据李克特量表五重奏获得的协议等级数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The relation between the cost impact and mismanagement in the Middle East construction projects
The creations of construction projects firstly try to achieve several specific goals. Effective projects are believed when these goals achieved. The principal concerns are to cross the downsides and defects. The stage of the performance project may be the most significant, crucial and drains of the resources through the project life cycle, its dependence on monitoring by professional in order to exceeded things blocking the path and accomplish the project plan exactly. The targets of the study are to diagnosis the actual reasons and locating the relation of mismanagement of the project execution stage and measure their influence on the cost. The study achieved and diagnoses many problems that have a negative impact on the projects management implementation as well as the effects of the cost by using many ways to reaching the target. There are 22 problems it is the main reasons that deviation the cost plus they obtain agreement level number according to Likert scale quintet.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Scientific Review Engineering and Environmental Sciences
Scientific Review Engineering and Environmental Sciences Earth and Planetary Sciences-Earth-Surface Processes
CiteScore
1.50
自引率
0.00%
发文量
24
审稿时长
26 weeks
期刊介绍: Scientific Review Engineering and Environmental Sciences [Przegląd Naukowy Inżynieria i Kształtowanie Środowiska] covers broad area of knowledge and practice on fields such as: sustainable development, landscaping of non-urbanized lands, environmental engineering, construction projects engineering land management, protection and land reclamation, environmental impact of investments, ecology, hydrology and water management, ground-water monitoring and restoration, geotechnical engineering, meteorology and connecting subjects. Authors are welcome to submit theoretical and practice-oriented papers containing detailed case studies within above mentioned disciplines. However, theoretical papers should contain part with practical application of the theory presented. Papers (in Polish or English languages) are accepted for publication after obtaining positive opinions of two reviewers. Papers published elsewhere are not accepted.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信