{"title":"生产线平衡模型分析在提高生产线效率的案例研究:PT XYZ","authors":"Dika Restu Elyuda, W. Isnaini, H. A. Khoiri","doi":"10.31315/opsi.v16i1.7531","DOIUrl":null,"url":null,"abstract":"The production line system is an important problem for the majority of manufacturing industries in Indonesia. PT XYZ is manufacturing company focuses on general construction and mining products supplier. Friction Bolt Stabilizer is one PT XYZ’s superior products. The problem in the friction bolt stabilizer production line is unbalanced distribution of work elements. Based on these problems, in this study a solution is provided by comparing the actual production line with the results of line balancing analysis. There are two methods used, namely Ranked Positional Weight and Killbridge Western Heuristic. The result is that the Killbridge western heuristic method produces the best design with a performance level of 91% line efficiency, 9% balance delay, a total of four workstations and a smoothness index value of 401.55 seconds","PeriodicalId":34167,"journal":{"name":"OPSI","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Line Balancing Model Analysis in Improving Production Line Efficiency Case Study: PT XYZ\",\"authors\":\"Dika Restu Elyuda, W. Isnaini, H. A. Khoiri\",\"doi\":\"10.31315/opsi.v16i1.7531\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The production line system is an important problem for the majority of manufacturing industries in Indonesia. PT XYZ is manufacturing company focuses on general construction and mining products supplier. Friction Bolt Stabilizer is one PT XYZ’s superior products. The problem in the friction bolt stabilizer production line is unbalanced distribution of work elements. Based on these problems, in this study a solution is provided by comparing the actual production line with the results of line balancing analysis. There are two methods used, namely Ranked Positional Weight and Killbridge Western Heuristic. The result is that the Killbridge western heuristic method produces the best design with a performance level of 91% line efficiency, 9% balance delay, a total of four workstations and a smoothness index value of 401.55 seconds\",\"PeriodicalId\":34167,\"journal\":{\"name\":\"OPSI\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"OPSI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31315/opsi.v16i1.7531\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"OPSI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31315/opsi.v16i1.7531","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

生产线系统是印尼大多数制造业的一个重要问题。PT XYZ是一家专注于一般建筑和采矿产品供应商的制造公司。摩擦螺栓稳定器是PT XYZ的优秀产品之一。摩擦螺栓稳定器生产线的问题是工作元件分布不平衡。基于这些问题,本研究通过将实际生产线与生产线平衡分析结果进行比较,提供了解决方案。使用了两种方法,即排名位置权重法和Killbridge西方启发式法。结果表明,Killbridge西方启发式方法产生了最佳设计,其性能水平为91%的线路效率、9%的平衡延迟、总共四个工作站和401.55秒的平滑指数
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Line Balancing Model Analysis in Improving Production Line Efficiency Case Study: PT XYZ
The production line system is an important problem for the majority of manufacturing industries in Indonesia. PT XYZ is manufacturing company focuses on general construction and mining products supplier. Friction Bolt Stabilizer is one PT XYZ’s superior products. The problem in the friction bolt stabilizer production line is unbalanced distribution of work elements. Based on these problems, in this study a solution is provided by comparing the actual production line with the results of line balancing analysis. There are two methods used, namely Ranked Positional Weight and Killbridge Western Heuristic. The result is that the Killbridge western heuristic method produces the best design with a performance level of 91% line efficiency, 9% balance delay, a total of four workstations and a smoothness index value of 401.55 seconds
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
16
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信