{"title":"挪威混凝土面板堆石坝因结冰而发生大泄漏事故","authors":"Robin Wood, Trine Indergård Carr, Tiemen Gordijn","doi":"10.1680/JDARE.21.00011","DOIUrl":null,"url":null,"abstract":"Aursjo dam is a Concrete Faced Rockfill Dam (CFRD) in central Norway built between 1950-58 and owned by Statkraft. The dam was originally constructed with an upstream face consisting of wooden plan...","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":"1 1","pages":"1-17"},"PeriodicalIF":0.0000,"publicationDate":"2021-02-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Large leakage incident in a Norwegian concrete faced rockfill dam due to ice build up\",\"authors\":\"Robin Wood, Trine Indergård Carr, Tiemen Gordijn\",\"doi\":\"10.1680/JDARE.21.00011\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Aursjo dam is a Concrete Faced Rockfill Dam (CFRD) in central Norway built between 1950-58 and owned by Statkraft. The dam was originally constructed with an upstream face consisting of wooden plan...\",\"PeriodicalId\":39070,\"journal\":{\"name\":\"Dams and Reservoirs\",\"volume\":\"1 1\",\"pages\":\"1-17\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-02-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Dams and Reservoirs\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/JDARE.21.00011\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JDARE.21.00011","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 1

摘要

Aursjo大坝是一座位于挪威中部的混凝土面板堆石坝(CFRD),建于1950年至1958年之间,由Statkraft拥有。大坝最初是用木平面组成的上游面建造的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Large leakage incident in a Norwegian concrete faced rockfill dam due to ice build up
Aursjo dam is a Concrete Faced Rockfill Dam (CFRD) in central Norway built between 1950-58 and owned by Statkraft. The dam was originally constructed with an upstream face consisting of wooden plan...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Dams and Reservoirs
Dams and Reservoirs Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.50
自引率
0.00%
发文量
30
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信