成本价值流映射作为外科手套制造公司的精益评估工具

IF 0.5 4区 工程技术 Q4 ENGINEERING, INDUSTRIAL
Rajesh B Menon, P. R. Shalij, P. Sajeesh, Geemon Tom, V. Pramod
{"title":"成本价值流映射作为外科手套制造公司的精益评估工具","authors":"Rajesh B Menon, P. R. Shalij, P. Sajeesh, Geemon Tom, V. Pramod","doi":"10.7166/32-1-2368","DOIUrl":null,"url":null,"abstract":"The development of cost-integrated value-stream mapping (CVSM) as a lean assessment tool for identifying wastage in the production process is presented in this article. In conventional VSM, the time involved in various processes is mapped without tracking the accumulation of direct and indirect costs. In the proposed CVSM, the cost of production is also accounted for, along with the time domain of conventional value-stream mapping. The time investment of the cost is also incorporated in CVSM. Value-added and non-value-added costs can thus be easily recognised in the time scale This novel method helps to calculate the value addition in monetary terms, and thus the actual production cost of the processes is acknowledged accurately. Since the wastage is quantified in the cost domain, the processes in which lean tools need to be implemented can be identified. The details of establishing CVSM are presented along with a study of its implementation in a glove manufacturing industry.","PeriodicalId":49493,"journal":{"name":"South African Journal of Industrial Engineering","volume":" ","pages":""},"PeriodicalIF":0.5000,"publicationDate":"2021-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"COST VALUE-STREAM MAPPING AS A LEAN ASSESSMENT TOOL IN A SURGICAL GLOVE MANUFACTURING COMPANY\",\"authors\":\"Rajesh B Menon, P. R. Shalij, P. Sajeesh, Geemon Tom, V. Pramod\",\"doi\":\"10.7166/32-1-2368\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of cost-integrated value-stream mapping (CVSM) as a lean assessment tool for identifying wastage in the production process is presented in this article. In conventional VSM, the time involved in various processes is mapped without tracking the accumulation of direct and indirect costs. In the proposed CVSM, the cost of production is also accounted for, along with the time domain of conventional value-stream mapping. The time investment of the cost is also incorporated in CVSM. Value-added and non-value-added costs can thus be easily recognised in the time scale This novel method helps to calculate the value addition in monetary terms, and thus the actual production cost of the processes is acknowledged accurately. Since the wastage is quantified in the cost domain, the processes in which lean tools need to be implemented can be identified. The details of establishing CVSM are presented along with a study of its implementation in a glove manufacturing industry.\",\"PeriodicalId\":49493,\"journal\":{\"name\":\"South African Journal of Industrial Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2021-05-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"South African Journal of Industrial Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.7166/32-1-2368\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"South African Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.7166/32-1-2368","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 3

摘要

本文介绍了成本集成价值流映射(CVSM)作为识别生产过程中浪费的精益评估工具的发展。在传统的VSM中,各个过程所涉及的时间是映射的,而不跟踪直接和间接成本的累积。在提议的CVSM中,生产成本也被考虑在内,以及传统价值流映射的时域。成本的时间投入也包含在CVSM中。因此,增值和非增值成本可以很容易地在时间尺度上得到确认。这种新方法有助于以货币形式计算增值,从而准确地确认工艺的实际生产成本。由于浪费在成本领域被量化,需要实施精益工具的过程可以被识别。介绍了建立CVSM的细节,并对其在手套制造业中的实施进行了研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
COST VALUE-STREAM MAPPING AS A LEAN ASSESSMENT TOOL IN A SURGICAL GLOVE MANUFACTURING COMPANY
The development of cost-integrated value-stream mapping (CVSM) as a lean assessment tool for identifying wastage in the production process is presented in this article. In conventional VSM, the time involved in various processes is mapped without tracking the accumulation of direct and indirect costs. In the proposed CVSM, the cost of production is also accounted for, along with the time domain of conventional value-stream mapping. The time investment of the cost is also incorporated in CVSM. Value-added and non-value-added costs can thus be easily recognised in the time scale This novel method helps to calculate the value addition in monetary terms, and thus the actual production cost of the processes is acknowledged accurately. Since the wastage is quantified in the cost domain, the processes in which lean tools need to be implemented can be identified. The details of establishing CVSM are presented along with a study of its implementation in a glove manufacturing industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.10
自引率
20.00%
发文量
15
审稿时长
6 weeks
期刊介绍: The South African Journal of Industrial Engineering (SAJIE) publishes articles with the emphasis on research, development and application within the fields of Industrial Engineering and Engineering and Technology Management. In this way, it aims to contribute to the further development of these fields of study and to serve as a vehicle for the effective interchange of knowledge, ideas and experience between the research and training oriented institutions and the application oriented industry. Articles on practical applications, original research and meaningful new developments as well as state of the art surveys are encouraged.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信