{"title":"对场外预制的态度:英国行业认知中不确定性的模糊检验方法","authors":"Kurtis Harley Looby, S. Smith, Mehdi Shahrestani","doi":"10.1080/17508975.2021.2004385","DOIUrl":null,"url":null,"abstract":"ABSTRACT Offsite prefabrication (OP) is an important approach in overcoming some inefficiencies in the U.K. construction sector. Whilst growth in OP can be demonstrated, its uptake is limited in relation to the expected benefit of its application. Perception, in part due to historical application, has been highlighted as a significant contributing factor in its limited uptake. However, despite recognition that the uncertainties associated with perception on OP are important to technological innovation adoption, these uncertainties were not explored in the previous studies. We adopt fuzzy-set theory, in combination with a survey from 76 organisations in the U.K., to explore these uncertainties in perception for a broad range of OP applications. Through fuzzy-set analysis, the study presents insight into some of the uncertainties related to the perception of OP through three themes: Uptake, Impression, and Strategy. This study proposes that the uncertainty in the perception of OP value, within specific and across all applications, needs to be explicitly considered to understand how perception is informing uptake. This research also suggests that negative perception is one of the key constraints to uptake and it is in fact the overall culture of the U.K. construction sector that is limiting the uptake of OP.","PeriodicalId":45828,"journal":{"name":"Intelligent Buildings International","volume":null,"pages":null},"PeriodicalIF":2.1000,"publicationDate":"2021-12-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Attitudes towards offsite prefabrication: a fuzzy approach to examining uncertainty within U.K. industry perception\",\"authors\":\"Kurtis Harley Looby, S. Smith, Mehdi Shahrestani\",\"doi\":\"10.1080/17508975.2021.2004385\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT Offsite prefabrication (OP) is an important approach in overcoming some inefficiencies in the U.K. construction sector. Whilst growth in OP can be demonstrated, its uptake is limited in relation to the expected benefit of its application. Perception, in part due to historical application, has been highlighted as a significant contributing factor in its limited uptake. However, despite recognition that the uncertainties associated with perception on OP are important to technological innovation adoption, these uncertainties were not explored in the previous studies. We adopt fuzzy-set theory, in combination with a survey from 76 organisations in the U.K., to explore these uncertainties in perception for a broad range of OP applications. Through fuzzy-set analysis, the study presents insight into some of the uncertainties related to the perception of OP through three themes: Uptake, Impression, and Strategy. This study proposes that the uncertainty in the perception of OP value, within specific and across all applications, needs to be explicitly considered to understand how perception is informing uptake. This research also suggests that negative perception is one of the key constraints to uptake and it is in fact the overall culture of the U.K. construction sector that is limiting the uptake of OP.\",\"PeriodicalId\":45828,\"journal\":{\"name\":\"Intelligent Buildings International\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2021-12-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Intelligent Buildings International\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/17508975.2021.2004385\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Intelligent Buildings International","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/17508975.2021.2004385","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

摘要:场外预制(OP)是克服英国建筑行业效率低下的一种重要方法。虽然OP的增长是可以证明的,但与应用的预期效益相比,其吸收是有限的。部分由于历史应用,感知被强调为其吸收有限的一个重要因素。然而,尽管人们认识到与OP感知相关的不确定性对技术创新的采用很重要,但在以前的研究中没有探讨这些不确定性。我们采用模糊集理论,结合对英国76个组织的调查,探讨了在广泛的OP应用中感知的这些不确定性。通过模糊集分析,该研究通过三个主题:接受、印象和策略,深入了解了与OP感知相关的一些不确定性。这项研究提出,在特定和所有应用中,需要明确考虑OP值感知的不确定性,以了解感知是如何影响吸收的。这项研究还表明,负面认知是吸收的关键制约因素之一,事实上,正是英国建筑业的整体文化限制了OP的吸收。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Attitudes towards offsite prefabrication: a fuzzy approach to examining uncertainty within U.K. industry perception
ABSTRACT Offsite prefabrication (OP) is an important approach in overcoming some inefficiencies in the U.K. construction sector. Whilst growth in OP can be demonstrated, its uptake is limited in relation to the expected benefit of its application. Perception, in part due to historical application, has been highlighted as a significant contributing factor in its limited uptake. However, despite recognition that the uncertainties associated with perception on OP are important to technological innovation adoption, these uncertainties were not explored in the previous studies. We adopt fuzzy-set theory, in combination with a survey from 76 organisations in the U.K., to explore these uncertainties in perception for a broad range of OP applications. Through fuzzy-set analysis, the study presents insight into some of the uncertainties related to the perception of OP through three themes: Uptake, Impression, and Strategy. This study proposes that the uncertainty in the perception of OP value, within specific and across all applications, needs to be explicitly considered to understand how perception is informing uptake. This research also suggests that negative perception is one of the key constraints to uptake and it is in fact the overall culture of the U.K. construction sector that is limiting the uptake of OP.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Intelligent Buildings International
Intelligent Buildings International CONSTRUCTION & BUILDING TECHNOLOGY-
CiteScore
4.60
自引率
4.30%
发文量
8
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信