Nikolinka Doneva, Z. Despodov, D. Mirakovski, M. Hadži-Nikolova, Stojanče Mijalkovski
{"title":"片麻岩和片岩中水平采矿设施建设的两个时间参数函数依赖项","authors":"Nikolinka Doneva, Z. Despodov, D. Mirakovski, M. Hadži-Nikolova, Stojanče Mijalkovski","doi":"10.5937/PODRAD1934001D","DOIUrl":null,"url":null,"abstract":"This paper presents the analysis of the construction of horizontal mining facilities where 18 variants of mining facilities were developed. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m` per facilities. Also the required time for construction of 1000 m' of the same facilities is calculated. Based on analysis, two parametric functional dependents of construction time are determined in relation of uniaxial compressive strength of rock mass and the size of the facilities` cross section.","PeriodicalId":31689,"journal":{"name":"Podzemni Radovi","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Two parametric functional dependents of time for construction of horizontal mining facilities in gneiss and schist\",\"authors\":\"Nikolinka Doneva, Z. Despodov, D. Mirakovski, M. Hadži-Nikolova, Stojanče Mijalkovski\",\"doi\":\"10.5937/PODRAD1934001D\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the analysis of the construction of horizontal mining facilities where 18 variants of mining facilities were developed. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m` per facilities. Also the required time for construction of 1000 m' of the same facilities is calculated. Based on analysis, two parametric functional dependents of construction time are determined in relation of uniaxial compressive strength of rock mass and the size of the facilities` cross section.\",\"PeriodicalId\":31689,\"journal\":{\"name\":\"Podzemni Radovi\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Podzemni Radovi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5937/PODRAD1934001D\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Podzemni Radovi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5937/PODRAD1934001D","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Two parametric functional dependents of time for construction of horizontal mining facilities in gneiss and schist
This paper presents the analysis of the construction of horizontal mining facilities where 18 variants of mining facilities were developed. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m` per facilities. Also the required time for construction of 1000 m' of the same facilities is calculated. Based on analysis, two parametric functional dependents of construction time are determined in relation of uniaxial compressive strength of rock mass and the size of the facilities` cross section.