整合一级模块供应商解决汽车排序问题

IF 1.3 Q3 ENGINEERING, MULTIDISCIPLINARY
Emrae Jung
{"title":"整合一级模块供应商解决汽车排序问题","authors":"Emrae Jung","doi":"10.4995/ijpme.2021.14985","DOIUrl":null,"url":null,"abstract":"The objective of this study is to develop a car assembly sequence that is mutually agreed between car manufacturers and Tier-1 module suppliers such that overall modular supply chain efficiency is improved. In the literature so far, only constraints of car manufacturers have been considered in the car sequencing problem. However, an assembly sequence from car manufacturer imposes a module assembly sequence on Tier-1 module suppliers since their assembly activities are synchronous and in sequence with assembly line of that car manufacturer. An imposed assembly sequence defines a certain demand rate for Tier-1 module suppliers and has significant impacts on operational cost of these suppliers which ultimately affects the overall modular supply chain efficiency. In this paper, a heuristic approach has been introduced to generate a supplier cognizant car sequence which does not only provide better operational conditions for Tier-1 module suppliers, but also satisfies constraints of the car manufacturer.","PeriodicalId":41823,"journal":{"name":"International Journal of Production Management and Engineering","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2021-07-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Integrating Tier-1 module suppliers in car sequencing problem\",\"authors\":\"Emrae Jung\",\"doi\":\"10.4995/ijpme.2021.14985\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The objective of this study is to develop a car assembly sequence that is mutually agreed between car manufacturers and Tier-1 module suppliers such that overall modular supply chain efficiency is improved. In the literature so far, only constraints of car manufacturers have been considered in the car sequencing problem. However, an assembly sequence from car manufacturer imposes a module assembly sequence on Tier-1 module suppliers since their assembly activities are synchronous and in sequence with assembly line of that car manufacturer. An imposed assembly sequence defines a certain demand rate for Tier-1 module suppliers and has significant impacts on operational cost of these suppliers which ultimately affects the overall modular supply chain efficiency. In this paper, a heuristic approach has been introduced to generate a supplier cognizant car sequence which does not only provide better operational conditions for Tier-1 module suppliers, but also satisfies constraints of the car manufacturer.\",\"PeriodicalId\":41823,\"journal\":{\"name\":\"International Journal of Production Management and Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2021-07-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Production Management and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4995/ijpme.2021.14985\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Production Management and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4995/ijpme.2021.14985","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 1

摘要

本研究的目的是开发一个汽车制造商和一级模块供应商之间相互同意的汽车装配序列,从而提高整体模块化供应链的效率。在目前的文献中,在汽车排序问题中只考虑了汽车制造商的约束。然而,来自汽车制造商的装配序列对一级模块供应商施加了模块装配序列,因为它们的装配活动是同步的,并且与该汽车制造商的装配线是顺序的。强加的装配顺序定义了一级模块供应商的一定需求率,并对这些供应商的运营成本产生重大影响,最终影响整个模块化供应链的效率。本文采用启发式方法生成供应商认知汽车序列,该序列不仅为一级模块供应商提供了更好的操作条件,而且满足了汽车制造商的约束。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integrating Tier-1 module suppliers in car sequencing problem
The objective of this study is to develop a car assembly sequence that is mutually agreed between car manufacturers and Tier-1 module suppliers such that overall modular supply chain efficiency is improved. In the literature so far, only constraints of car manufacturers have been considered in the car sequencing problem. However, an assembly sequence from car manufacturer imposes a module assembly sequence on Tier-1 module suppliers since their assembly activities are synchronous and in sequence with assembly line of that car manufacturer. An imposed assembly sequence defines a certain demand rate for Tier-1 module suppliers and has significant impacts on operational cost of these suppliers which ultimately affects the overall modular supply chain efficiency. In this paper, a heuristic approach has been introduced to generate a supplier cognizant car sequence which does not only provide better operational conditions for Tier-1 module suppliers, but also satisfies constraints of the car manufacturer.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.10
自引率
13.30%
发文量
18
审稿时长
20 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信