APT-PRANOTO机场工程建设期经济影响分析

Adisthy Shabrina Nurqamarani
{"title":"APT-PRANOTO机场工程建设期经济影响分析","authors":"Adisthy Shabrina Nurqamarani","doi":"10.23969/trikonomika.v18i2.1181","DOIUrl":null,"url":null,"abstract":"The aim of this research was to provide the evidence of economic benefits resulted from development of APT Pranoto airport towards East Kalimantan which will strengthen the support of the development of the new airport from various stakeholders. This research applied input-output, analysis to estimate the economic impact i.e impact of expenditure on construction phase. Direct impact includes the increase in gross value added as well as income from tax payment and create new employment. Indirect impact includes increase in capital spending of the workers and more money circulated within the area of East Kalimantan. This study conclude that there are direct and indirect impacts from APT Pranoto airport during construction phase within the period of 5 years. The findings can be used to emphasize APT Pranoto Airport Project in gaining funding and acceptance from local economy.","PeriodicalId":31920,"journal":{"name":"Trikonomika","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ECONOMIC IMPACT ANALYSIS OF APT PRANOTO AIRPORT PROJECT DURING CONSTRUCTION PHASE\",\"authors\":\"Adisthy Shabrina Nurqamarani\",\"doi\":\"10.23969/trikonomika.v18i2.1181\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The aim of this research was to provide the evidence of economic benefits resulted from development of APT Pranoto airport towards East Kalimantan which will strengthen the support of the development of the new airport from various stakeholders. This research applied input-output, analysis to estimate the economic impact i.e impact of expenditure on construction phase. Direct impact includes the increase in gross value added as well as income from tax payment and create new employment. Indirect impact includes increase in capital spending of the workers and more money circulated within the area of East Kalimantan. This study conclude that there are direct and indirect impacts from APT Pranoto airport during construction phase within the period of 5 years. The findings can be used to emphasize APT Pranoto Airport Project in gaining funding and acceptance from local economy.\",\"PeriodicalId\":31920,\"journal\":{\"name\":\"Trikonomika\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Trikonomika\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23969/trikonomika.v18i2.1181\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Trikonomika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23969/trikonomika.v18i2.1181","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是提供证据,证明APT Pranoto机场向东加里曼丹的开发带来的经济效益,这将加强各利益相关者对新机场开发的支持。本研究应用投入产出分析来估计经济影响,即支出对施工阶段的影响。直接影响包括总增加值的增加以及纳税收入的增加和创造新的就业机会。间接影响包括工人资本支出的增加和东加里曼丹地区更多的资金流动。本研究得出的结论是,在5年的建设阶段,APT Pranoto机场有直接和间接的影响。研究结果可用于强调APT Pranoto机场项目获得当地经济的资助和认可。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ECONOMIC IMPACT ANALYSIS OF APT PRANOTO AIRPORT PROJECT DURING CONSTRUCTION PHASE
The aim of this research was to provide the evidence of economic benefits resulted from development of APT Pranoto airport towards East Kalimantan which will strengthen the support of the development of the new airport from various stakeholders. This research applied input-output, analysis to estimate the economic impact i.e impact of expenditure on construction phase. Direct impact includes the increase in gross value added as well as income from tax payment and create new employment. Indirect impact includes increase in capital spending of the workers and more money circulated within the area of East Kalimantan. This study conclude that there are direct and indirect impacts from APT Pranoto airport during construction phase within the period of 5 years. The findings can be used to emphasize APT Pranoto Airport Project in gaining funding and acceptance from local economy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
9
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信