轻水反应堆核电站商品成本动因分析

Q4 Energy
Karen J. Dawson, P. Sabharwall
{"title":"轻水反应堆核电站商品成本动因分析","authors":"Karen J. Dawson, P. Sabharwall","doi":"10.1504/ijnest.2020.10030866","DOIUrl":null,"url":null,"abstract":"Construction costs constitute the largest outlay of a nuclear power plant. Direct costs, such as the cost of materials and installation of materials and equipment, make up the majority of construction expenditures. The purpose of this study is to quantify the cost of the two most abundant materials: concrete and steel. This study shows that a 1% reduction in concrete installation rate results in a 0.6% reduction in concrete costs, and a 1% reduction in the steel installation rate creates a 0.3% reduction in steel costs. The additional cost paid for nuclear-quality concrete is shown to be 23% of total concrete budget. The additional cost paid for nuclear-quality steel is shown to be 41% of the total steel expenditures. These results show that focus on decreasing commodity expenditures (through increasing installation rate) can improve the cost of constructing nuclear power plants.","PeriodicalId":35144,"journal":{"name":"International Journal of Nuclear Energy Science and Technology","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-08-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Light water reactor nuclear power plant commodity cost driver analysis\",\"authors\":\"Karen J. Dawson, P. Sabharwall\",\"doi\":\"10.1504/ijnest.2020.10030866\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction costs constitute the largest outlay of a nuclear power plant. Direct costs, such as the cost of materials and installation of materials and equipment, make up the majority of construction expenditures. The purpose of this study is to quantify the cost of the two most abundant materials: concrete and steel. This study shows that a 1% reduction in concrete installation rate results in a 0.6% reduction in concrete costs, and a 1% reduction in the steel installation rate creates a 0.3% reduction in steel costs. The additional cost paid for nuclear-quality concrete is shown to be 23% of total concrete budget. The additional cost paid for nuclear-quality steel is shown to be 41% of the total steel expenditures. These results show that focus on decreasing commodity expenditures (through increasing installation rate) can improve the cost of constructing nuclear power plants.\",\"PeriodicalId\":35144,\"journal\":{\"name\":\"International Journal of Nuclear Energy Science and Technology\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-08-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Nuclear Energy Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/ijnest.2020.10030866\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Energy\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Nuclear Energy Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijnest.2020.10030866","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Energy","Score":null,"Total":0}
引用次数: 1

摘要

建造成本是核电站最大的支出。直接成本,如材料成本、材料和设备安装成本,占建筑支出的大部分。这项研究的目的是量化两种最丰富的材料的成本:混凝土和钢材。这项研究表明,混凝土安装率降低1%,混凝土成本降低0.6%,钢材安装率下降1%,钢材成本降低0.3%。核质量混凝土的额外费用占混凝土总预算的23%。核质量钢材的额外费用占钢材总支出的41%。这些结果表明,专注于减少商品支出(通过提高安装率)可以提高核电站的建设成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Light water reactor nuclear power plant commodity cost driver analysis
Construction costs constitute the largest outlay of a nuclear power plant. Direct costs, such as the cost of materials and installation of materials and equipment, make up the majority of construction expenditures. The purpose of this study is to quantify the cost of the two most abundant materials: concrete and steel. This study shows that a 1% reduction in concrete installation rate results in a 0.6% reduction in concrete costs, and a 1% reduction in the steel installation rate creates a 0.3% reduction in steel costs. The additional cost paid for nuclear-quality concrete is shown to be 23% of total concrete budget. The additional cost paid for nuclear-quality steel is shown to be 41% of the total steel expenditures. These results show that focus on decreasing commodity expenditures (through increasing installation rate) can improve the cost of constructing nuclear power plants.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.80
自引率
0.00%
发文量
2
期刊介绍: Today, nuclear reactors generate nearly one quarter of the electricity in nations representing two thirds of humanity, and other nuclear applications are integral to many aspects of the world economy. Nuclear fission remains an important option for meeting energy requirements and maintaining a balanced worldwide energy policy; with major countries expanding nuclear energy"s role and new countries poised to introduce it, the key issue is not whether the use of nuclear technology will grow worldwide, even if public opinion concerning safety, the economics of nuclear power, and waste disposal issues adversely affect the general acceptance of nuclear power, but whether it will grow fast enough to make a decisive contribution to the global imperative of sustainable development.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信